Loading…
Loading…
Tender Value
Refer Docs
Closing Date
24 Mar 2025, 2:30 pmClosed
Single Packet
Normal Tender
No
Not Applicable
Total Value Wise
Lowest to Highest
TPI Agency
RDSO
90 days
Expenditure
General
93
1 condition
[A] RDSO approved vendors only to quote. [B] Supply should be as per Tender Description / Specification. [C] Material to be procured from OEM or their authorized dealers / distributors: (D) Wherever so specified, the Railways reserve the right to place orders for either entire or bulk quantity on OEMs or their authorized dealers. (E) Any firm quoting on behalf of OEM must submit tender specific authorization certificate along with their offer and agree for inspection by the nominated agency (as the case may be) at the premises of their principals, failing which their offer shall be liable to be rejected.
32 conditions
1)EARNEST MONEY DEPOSIT (EMD) shall be deposited by all vendors for tenders with estimated value above Rs. 25 Lakhs subject to the applicable exemptions. For the exemptions and other details please refer Para 2.0 Part A of Southern Railway Tender Conditions. 2) In case of submission of Earnest Money Deposit in the form of Bank Guarantee, please refer Annexure- 6 of Southern Railway Tender conditions.
SECURITY DEPOSIT (SD) (a) Shall be 5% of total value of contract and shall be taken from all vendors for contract value above Rs. 25 Lakh subject to the applicable exemptions. For details please refer 10.0 Part A of Southern Railway Tender Conditions. In case of submission of security Deposit in the form of Bank Guarantee. (b) Unless otherwise agreed between the Purchaser and the contractor or otherwise mentioned in the tender document, the contractor shall, within 21 days of posting of written notice of acceptance of the offer to the contractor, deposit with the Railway concerned (in cash or the equivalent in Government Securities or approved Banker's Guarantee Bond or any other approved form as stipulated in the tender document) a sum as stipulated in the tender document, towards Security Deposit. (c). Unless otherwise specified in the tender document, Security Deposit should remain valid for a minimum period of 60 days beyond the date of completion of all the contractual obligations of the supplier, including warranty obligations. ( Ref: railway Board letter No. 2022/RS(G)/779/13(E 3402809), dated 21/09/2022 ) (d). please refer Annexure - 5 of Southern Railway Tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Inspection by : TPI
Procurement of the item is restricted to Local suppliers with minimum local content of 20% (Class-I or Class-II Local supplier as defined in Railway Board letter no: No.2020/RS(G)/779/2/Pt.1 dated 25.09.2020) only and the vendors who do not qualify to be "Local suppliers" (i.e., "Non-Local suppliers" with local content less than 20%) should not quote in the tender as their offers shall not be considered for any ordering. In case any vendor who does not qualify to be a "Local supplier" for the tendered item participates in the tender, it does so at it's own risk and cost and Railways shall not be liable for any loss or damage caused to the vendor. Offer of the firm shall be summarily rejected in case of noncompliance of above declaration. For more details please refer para 16.0 of SR Tender Conditions attached with this tender.
Warranty as per consignees requirement or Para 3200 of IRS conditions of Contract or as mentioned in guiding specification, whichever is higher Warranty period mentioned in specification/MDTS is applicable. If warranty period is not mentioned in respective specification/MDTS, standard warranty period as mentioned in IRS conditions is applicable. In case, there is a discrepancy regarding warranty period mentioned in specification/MDTS and standard warranty clause, then warranty period mentioned in specification/MDTS shall prevail. Tenderers should further note that if the Guarantee/Warranty is a part of the tendered specification and/or tender schedule, then any deviation on this count, shall be treated as a technical deviation, which may render their offer technically unsuitable. Bidders are advised to bring such deviation(s) clearly in the technical deviation statement. In case, this deviation is not indicated in the technical deviation statement, it will be presumed that offer is as per the tendered specification in all respect. Any ambiguity in this regard or any other respect shall be to the disadvantage of the bidder. Further, Suppliers shall ensure that the materials are invariably stamped with manufacturers name and month & year of manufacture as may be detailed in drawing/specification of material to enable correct reckoning of warranty.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender condition.
Tenderers shall confirm the following declaration failing which the offers are likely to be ignored. " I have read the clause regarding restrictions on procurement from a bidder of a country which shares a land border with India. I certify that this bidder is not from such a country or,if from such a country, has been registered with the Competent Authority. I hereby certify that this bidder fulfills all requirements in this regard and is eligible to be considered. Where applicable, evidence of valid registration by the Competent Authority shall be attached.
Bidders are advised to bring such deviation(s) clearly in the technical deviation statement.
For PUBLIC PROCUREMENT POLICY (Preference to Make in India ), please refer Para 16.0 Part B of Southern Railway Tender Conditions
Delivery of Material Free Till Destination, Unloading at Destination is under the Scope of the Supplier
In case, this deviation is not indicated in the technical deviation statement, it will be presumed that offer is as per the tendered specification in all respect. Any ambiguity in this regard or any other respect shall be to the disadvantage of the bidder. Further, Suppliers shall ensure that the materials are invariably stamped with manufacturers name and month & year of manufacture as may be detailed in drawing/specification of material to enable correct reckoning of warranty.
TPI 1). TPI Inspection at OEM's premises. 2). Tenderers may refer Annexure 13 of SR Tender conditions under the Link http://10.185.80.93/SR_Tender_Conditions_01032024_SR_signed.pdf 3). TPI Agency will be governed by Railway Board Letter No.2022/RS(G)/779/8 Dated.04.01.2023.
11.Bank Guarantee towards Warranty obligation For items like machinery and Plant, Costly equipment, capital spares, the tenderer, wherever called upon to do so, shall furnish a Bank Guarantee of 10% of Material value to cover their warranty obligation. The model proforma of the Warranty/Guarantee bond is annexed as Annexure 5.3. It would be the responsibility of the contractor to ensure that Bank Guarantee (BG) required to be submitted by them, should be sent directly by the issuing Bank under registered Post to the concerned Purchasing Authority and, in no case should be brought by the tenderer. That is to say, the firm shall not involve themselves in transmission of the BG between the issuing bank and the purchaser.
Time preference clause is not applicable in this Tender
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. [Denial of this condition not recommended]
Clause : 1. LD will be levied as per terms and conditions of railways. ( Wherever required ) 2. Wherever applicable, and firm fails to submit ePBG/SD amount within time frame, railway reserves the right to cancel LOA duly imposing appropriate pre-determined charges
The bidder agrees to supply the tendered stores at the rates quoted by him in accordance with the IRS Conditions of Contract and [or] special Conditions and [or] other Conditions specified/attached with the tender.
Have you quoted in the prescribed proforma
Have you kept your offer valid for 90 days.[validity of 120 days is required for items of Machinery and Plants]
Have you quoted price on the basis of free delivery to destination, indicating the break up
Tenderers to acknowledge having read and also accept the Tender Conditions for Electronic Tenders as available at Southern Railway Stores Documents link in the e-procurement website
Have you attached any performance statements with your offer For proof of supply to other railways / production units copy of Purchase Order, Inspection certificate and receipt note / certificate must be uploaded. Non- submission of such vital documents may be taken as their not having any such past performance.
Please check our website before submitting offer, whether any corrigendum to the tender has been issued or not.
The bidder confirms that Rates and other financial terms quoted in relevant columns of financial bid will only be ruling terms for acceptance, and such terms quoted anywhere else should be ignored. [Denial of this condition not recommended]
The bidder agrees to supply the tendered stores at the rates quoted by him in accordance with the IRS Conditions of Contract and [or] special Conditions and [or] other Conditions specified/ attached with the tender.
1) Warranty Period: 30 month(s) from the date of Supply as per RDSO specification. 2) Material delivery location: SSE/Signal/SRM store at NCJ Near Railway Health Unit .Nagercoil Junction Railway Station, Nagercoil - 629002 Mobile No. 9746769831. 3)IT IS A SAFETY ITEM
The submission of e-PBG/SD/EMD in the form of a Demand Draft, method has been discontinued with effect from 15/12/2023, as per RBI letter number BD(T) No.S-1013/17.01.002/2023-24, dated 12/12/2023, and Sr.DFM/TVC Letter number No.A112/TVC/BR&SUS, dated 13/12/2023. Henceforth, you are requested to remit the e-PBG/SD/EMD amount (whereever required ) directly to the Southern Railway Account Number 03518501011 through digital payment methods such as NEFT/RTGS. ( Format attached )
SD may be submitted in the form of BG,FDR or through NEFT/RTGS 1.Bank Guarantee ( Whereever Applicable) 2. BG shall be executed on the Non-Judicial Stamp Paper with appropriate value prevailing in the concerned state. 3. As per GCC 2022, Non-Judicial Stamp Paper shall be purchased in the name of the BG executing bank. The Non-Judicial Stamp paper shall be purchased prior to the date of execution of the BG. 4. Sr. DFM/TVC shall be the beneficiary of the BG. 5. The BG number and date shall be mentioned at the top of each page of the BG. Signatures of two witnesses with complete names and addresses shall be placed on the last page of the BG below the signatures of the bank officials. 6. Direct confirmation shall be obtained from the BG executing bank. However, legal vetting of the BG shall be obtained as per the General Procedure in Vogue. Deeds for extension of the validity of the BG need not be sent for legal vetting. (Ref. Law Officer/TVC Letter No. V/C.356/6/BG/2023/Law/TVC, dated 21/06/2023)
Bank Guarantee towards Warranty obligation For items like machinery and Plant, Costly equipment, capital spares, the tenderer, wherever called upon to do so, shall furnish a Bank Guarantee of 10% of Material value to cover their warranty obligation. The model proforma of the Warranty/Guarantee bond is annexed as Annexure 5.3. It would be the responsibility of the contractor to ensure that Bank Guarantee (BG) required to be submitted by them, should be sent directly by the issuing Bank under registered Post to the concerned Purchasing Authority and, in no case should be brought by the tenderer. That is to say, the firm shall not involve themselves in transmission of the BG between the issuing bank and the purchaser.
1. In case firm fails to execute the contract within original or extended delivery period, the purchaser will be entitled to impose LD for extension of delivery period or may decide to cancel the contract by imposing General Damages, LD/GD will be levied as per terms and conditions of railways. 2. Wherever applicable, and firm fails to submit ePBG/SD amount within time frame, railway reserves the right to cancel LOA duly imposing appropriate pre-determined charges
1) PRICE VARIATION CLAUSE:-The prices are with price variation as per IEEMA formula given below. Price Variation Formula : P = Po + CuF (Cu-Cuo) + CCFCu (PVCC-PVCCo) + FeF (Fe-Feo) ; P = Po + 0.248 (Cu-Cuo) + 0.395 (PVCC-PVCCo) + 0.343 (Fe-Feo) ; Where; P = Price payable per KM as adjusted in accordance with PVC. Po =Price per KM of cable as per Purchase Order. CuF = Variation factor of Copper. CCFCu = Variation factor for PVC compound. FeF = Variation factor for Steel. Cu, PVCC & Fe are the prices of raw materials as applicable on first working day of the month, one month prior to the date of offering the material for inspection. Prices of the raw materials i.e. Cu, PVCC and Fe should be those published by IEEMA. The Base month for PVC is OCTOBER 2022 and the values are as under; Cuo = Price of Copper Wire Rod i.e. Rs. 6,82,836/- per MT. PVCco = Price of PVC Compound Grade CW-22 is Rs. 1,55,075/- per MT. Feo = Price of Steel for Armouring (Flat 4 mm x 0.8 mm) i.e. Rs.79,500/- per MT. The base price of input raw materials are based on IEEMA circulars for the month of OCTOBER 2022 (issued on 02.11.2022) which is prevailing as on 1st working day of the month of OCTOBER 2022. The price of inputs payable shall be subject to the adjustment up or down in accordance with IEEMA formula. The prices of Cu, PVCC, and Fe are as applicable on first working day of the month, one month prior to the date of call letter of inspection duly acknowledged by the inspection Agency (RDSO/RITES/DOI) shall be considered for computing price variation. In case date of call letter for inspection duly acknowledged by inspection Agency is not available, the reference date shall be one month prior to date of inspection. The date of inspection shall be the date of inspection certificate issued by the inspection agency (in other words I.C. date) for the purpose of applicability of PVC. The date of actual delivery at destination would be treated as date of delivery. Variation up or down taking place within stipulated original delivery period will be to SWR account. For Variation beyond the original delivery period, upward variation will be to firms account and benefit of downward variation if any shall be passed to S.W. Railway without preference to any time limit. In other words, for PVC payment in the cases where supply is made in the extended period of DP (with or without LD), PV as applicable on the terminal date of the original DP is payable unless the PV price has decreased after terminal date of the original DP, in which case, the decreased rate will be applicable. (Authority : Rly. Bds. letter No. 87/RS(G)/779/9 Dt. 21.11.2013).
1 location across Kerala · 5,500 Metre total
PVC insulated copper cable of size 19 C x 1.5 sq.mm
93255147
93255147
Open - Indigenous
Goods
Kerala
₹0
Exempted
24 Mar 2025
28 Feb 2025
2 items · 5,500 Metre total
PVC insulated armoured unscreened underground Railway signalling copper cable of size 19 C x 1.5 sq.mm as per R DSO spec. IRS.S-63/2014 (Rev.4.0) or latest. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/S/SRM/TVC, SR | Kerala | 500.00 Metre |
| Total | 500 Metre | |
PVC insulated armoured unscreened underground Railway signalling copper cable of size 19 C x 1.5 sq.mm as per R DSO spec. IRS.S-63/2014 (Rev.4.0) or latest. [ Warranty Period: 30 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SSE/S/SRM/TVC, SR | Kerala | 5000.00 Metre |
| Total | 5,000 Metre | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5318558.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .