| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance GRAM PO ULLI CHOUBTTAKHAL DISTRICT PAURI GARHWAL | PAURI GARHWAL | UTTARAKHAND | 246001 | ₹2.0 Cr | L1 | Accepted-Finance Accept |
| 2 | L2₹2.0 CrRejected-Finance | ₹2.0 Cr | L2 | Rejected-Finance Reject |
| 3 | L3₹2.0 CrRejected-Finance | ₹2.0 Cr | L3 | Rejected-Finance Reject |
| 4 | L4₹2.0 CrRejected-Finance | ₹2.0 Cr | L4 | Rejected-Finance Reject |
| 5 | L5₹2.0 CrRejected-Finance | ₹2.0 Cr | L5 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | M/S SHIVA CONSTRUCTION L2 | HILL VALLEY CONSTRUCTION L4 | suresh chandra nainwal L3 | M/s Marc Engineerians L5 | pradeep negi L6 | Hemant Singh Negi L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in hill side cutting / filling for construction of road in all kind of soil and rocks met at site and as per plan in, "X" and "L" section including cutting of bushes, dressing of road surface to requird and slopes also including all leads, lifts and disposal of surplus excavated material as directed by Engineer - in - charge including slip clearance during hill side cutting as per techinical specification including material, labour and T&P etc. complete in all respect. And including Construction of katcha drain as per drawing including supply of all material, labour, T&P etc. required for proper completion of the work. | |||||||||
| 1.01 | In soil | 339.62 | Cum | 70.25 ₹23,858.31 | 5 ₹1,698.10 | 70 ₹23,773.40 | 5 ₹1,698.10 | 73.4 ₹24,928.11 | 70 ₹23,773.40 |
| 1.02 | In ordinary rock | 508 | Cum | 109.25 ₹55,499 | 89.09 ₹45,257.72 | 109 ₹55,372 | 89.09 ₹45,257.72 | 114.1 ₹57,962.80 | 109 ₹55,372 |
| 1.03 | In hard rock | 298.12 | Cum | 282.65 ₹84,263.62 | 98.09 ₹29,242.59 | 283 ₹84,367.96 | 98.09 ₹29,242.59 | 295.2 ₹88,005.02 | 282 ₹84,069.84 |
| 2.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications). | 150 | Cum | 1,435.2 ₹2.2 L | 1,490 ₹2.2 L | 1,450 ₹2.2 L | 1,490 ₹2.2 L | 1,498.9 ₹2.2 L | 1,432 ₹2.1 L |
| 2.01Making Super Elevation | |||||||||
| 2.02 | 70% E&B | 101.25 | Cum | 70.25 ₹7,112.81 | 73 ₹7,391.25 | 70 ₹7,087.50 | 73 ₹7,391.25 | 73.4 ₹7,431.75 | 70 ₹7,087.50 |
| 2.03 | 30% OR | 101.25 | Cum | 109.25 ₹11,061.56 | 114 ₹11,542.50 | 109 ₹11,036.25 | 114 ₹11,542.50 | 114.1 ₹11,552.63 | 109 ₹11,036.25 |
| 3.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405. | 1,275.75 | Cum | 3,265.25 ₹41.7 L | 3,410 ₹43.5 L | 3,300 ₹42.1 L | 3,410 ₹43.5 L | 3,410.2 ₹43.5 L | 3,260 ₹41.6 L |
| 4.00 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405. | 885.93 | Cum | 3,280 ₹29.1 L | 3,420 ₹30.3 L | 3,375 ₹29.9 L | 3,420 ₹30.3 L | 3,426.9 ₹30.4 L | 3,276 ₹29.0 L |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
23 Sept 2025, 12:00 pmClosed
SE 12TH CIRCLE PWD PAURI
SE 12TH CIRCLE PWD PAURI
Improvement and Strengthening of Gaindkhaal Aamsain Motor Road at Yamkeshwar consistuency in District Pauri Garhwal under State Sector.
2025_pwd_86709_1
4268/141yata date 11-08-2025
Open Tender
Civil Works
270 days
Lansdowne
as per technical bid
3 documents required · 3 mandatory
₹5,900
EE PD PWD LANSDOWNE
₹5.1 L
SE 12TH CIRCLE PWD PAURI
17 Feb 2026
29 Aug 2025
23 Sept 2025
29 Aug 2025
23 Sept 2025
10 Sept 2025
3 Sept 2025
Amount
Earth work in hill side cutting / filling for construction of road in all kind of soil and rocks met at site and as per plan in, "X" and "L" section including cutting of bushes, dressing of road surface to requird and slopes also including all leads, lifts and disposal of surplus excavated material as directed by Engineer - in - charge including slip clearance during hill side cutting as per techinical specification including material, labour and T&P etc. complete in all respect. And including Construction of katcha drain as per drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
In soil
In ordinary rock
In hard rock
Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications).
Making Super Elevation
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5
Soling coat
Inter coat
Top coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type B as per Technical Specification Clause 510.
Hill Side Katcha Drain Construction of unlined surface drains of average cross-sectional area 0.40 sqm to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. (Mechanical Means).
Hill Side Pucca drain
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M 10) 1:3:6
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203Nominal mix (1:2:4) Hand mix
Retaining /Brest Walls
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction
Random Rubble Masonary laid in 1: 6 cement sand mortar in breast wall,retaining wall, parapets,scupper etc. including supply of all materials,labour ,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications).
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Scupper
Construction of 1m span scupper of RR 1:5 abutment, RRC slab as per attached drawing including sopply of all material, labour, T&P etc. required for proper completion of the work.
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specification
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M 10) 1:3:6
Random Rubble stone masonry laid in 1:5 cement and sand mortar. (as per pwd uttarakhand specification)
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6)
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (For height upto 5 m) RCC M 25)
Random Rubble Masonary laid in 1: 6 cement sand mortar in breast wall,retaining wall, parapets,scupper etc. including supply of all materials,labour ,t & p& royality etc,required for proper complition of work.(As per PWD Uttarakhand specifications).
Catchpit
Construction of catcpit for scupper as per standard drawing including supply of all material, labour, T&P etc. required for proper completion of the work.
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specification.
Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specification
Parapet
Construction of road side parapet of size 2.00x0.45x0.60cm with foundation 2.15x0.60x0.15m laid in CC M-10,RR stone masonry laid in 1:5 cement sand mortar with 25mm thick M 20 coping and pointing in 1:3 cement sand mortar in front side of parapet, plaster in 1:4 cement sand mortar in back side & both side of the parapet and 3 coat white washing in all face of the parapet i/c supply of all material, labour T&P etc requried for proper completion of the work.
Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (PCC M 10)
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction
White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications Clause 1915
Providing edge stones on valley side of formation as per drawing and Technical Specification Clause 1608.2.6
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
Ordinary Kilometer Stone (Precast)
200 m stone (precast)
Providing and fixing of retro reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of Class-B Type IV retro reflective sheeting fixed over 3mm/4mm thick Aluminium composite material sheet vide clause 801.3, depending on the size of the sign fixed over back support frame of min 25 x 25 x 3mm Angle mounted on a mild steel a mild steel circular pipe 65 NB, 3.2 mm thickness, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67.
600 mm equilateral triangle
800 x 600 mm Rectangle
(Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810)
M/S SHIVA CONSTRUCTION (BID ID -397561)
suresh chandra nainwal (BID ID -399050)
HILL VALLEY CONSTRUCTION (BID ID -399025)
M/s Marc Engineerians (BID ID -399060)
pradeep negi (BID ID -398955)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_102890.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid