Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹6.4 L+₹1.1 L (21.4%)Rejected-AOC | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹6.6 L+₹1.3 L (24.2%)Rejected-AOC | L3 | Rejected-AOC L3 Bidder | |
| 4 | L4₹8.2 L+₹2.9 L (55.0%)Rejected-AOC | L4 | Rejected-AOC L4 Bidder | |
| 5 | Not Admitted-Fee/PreQual/Technical 01 KATYANI CONSTRUCTION COMPANY H NO 1 SHOP NO 1 RATAN LAL NAGAR KANPUR NAGAR UTTAR PRADESH 208022 | KANPUR NAGAR | UTTAR PRADESH | 208022 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹7.7 L
EMD Value
₹8,000
Closing Date
27 Dec 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC I, Lucknow
Pareshan Bhawan, Vibhuti Khand, Lucknow
Work of erection, certifuging, commissioning and other associated works and supply and fixing work at 132 KV Substation Indira Nagar under ETD II, Lucknow
2021_UPTCL_657364_1
Very short term e-tender 80/2021-22
Open Tender
Electrical Works
Piece-work
30 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 2408002190005438, IFS PUNB0691100, PNB, Lko
₹8,000
11 Mar 2022
15 Dec 2021
28 Dec 2021
15 Dec 2021
27 Dec 2021
15 Dec 2021
180 days
Amount
Following works are to be carried out at 132KV substation Indira Nagar Lucknow for installation of new 63 MVA, 132/33 KV Transformer, along with associated works including all cost of men, miscellaneous consumables, T&P, Centrifuging machine, Crane etc to complete the job satisfactorily:
A) Erection of Transformer,RTCC Panel including shifting etc. as detailed below:
1) Dragging and shifting of Main Tank of 63 MVA T/F from unloading point to plinth (Distance 140 metres). The work includes turning of main tank if required.
i) Up to 100 metres distance
ii) Additional shifting of Transformer tank up to 40 mtr distance (1 job for every 5 metres)
2) Complete erection of 63 MVA Transformer including radiators, conservator tank, bushings with their turrets, connecting pipelines, cooling fans and pumps, motor drive mechanism with tap changer, marshalling box, OTI, WTI, capillary pipes etc.
3) Safe carriage of 20KL T/F oil tank from 220 KV Sub station Kursi Road, Lucknow or any other sub station in Lucknow to 132 KV Substation Indira Nagar, Lucknow including loading & unloading ( approx. distance 25 KM for heavy vehicle route)
4) Filling of fresh transformer oil from transformer oil drums (approx 20 KL) in suitable capacity oil tank and then centrifuging of T/F oil by Ultra high vacuum oil filtration plant after connecting pipes with storage tanker to oil filtration plant including taking BDV values of oil and megger values of transformer periodically till the required value is reached and creatring vacuum inside the new 63 MVA T/F before filling the T/F oil including cvacuum stand test, with all cost of centrifuging machine, CFM operator, lubricants etc.
5) Centrifuging/ dehydration of the complete T/F oil of 63 MVA T/F by Ultra High Vacuum Oil Filtration Plant after connecting the centrifuging pipes with T/F tank to oil filtration plant including taking the BDV values of oil and megger values of the T/F periodically till the required value is achieved including filling & topping up of the above prepared T/F oil under vacuum in main tank , radiator, conservator tank etc and attending the oil leakages if any, with all cost of centrifuging machine, CFM operator, lubricants etc.
6) Earthing of Main Tank of the Transformer, RTCC Panel, Marshalling Box, drive mechanism of the cooling fans, T/F neutral etc of 63 MVA Transformer with the help of 50x6 mm/ 75x10 mm size MS flat (to be provided by department), its jointing with already laid earth mat and necessary modification in existing support for earthing of Neutral bushing and then painting of earthing strips as per technical specification/ standard practices.
7) Making of 02 no. additional Delta of 63 MVA T/F HV/LV neutral bushing with fabrication of 3 Nos , 3 meter long electrodes of 36mm/40mm dia MS round bar, piercing it inside ground at equal distance of 1 meter up to depth of 700mm, by digging of earth and connecting all the 3 No electrodes with 75mmx10mm size MS flats and connecting with existing earth mat and taking out riser by due cutting, bending , welding etc as per technical specifications. (MS bar will be provided by department). Above work also includes painting of earthing strips with one coat of red oxide primer and two coats of bus green synthetic enamelled paint. 1 job for each Delta earthing).
8) Erection of 63 MVA Transformer RTCC panel including grouting, earthing after shifting from storage place to relay room as per instructions of site engineer.
B) Jumpering, stringing etc of various equipment, Bus sections & 63 MVA T/F etc.
1) Jumpering of various equipment with ACSR panther conductor in T/F HV bay between 132KV Main Bus to HV side bushing of T/F and LAs by due cutting and bending of conductor and fixing & tightening etc of the conductor/clamps/connectors/spacers etc (01 job for all 3 phases)
2) Jumpering of various equipment with ACSR Twin Moose conductor in T/F LV bay between 33 KV Main Bus to LV side bushing of T/F including isolators, CTs, Las by due cutting and bending of conductor and fixing & tightening of the conductor/clamps/connectors/spacers etc ( 01 job for all 3 phases)
C) Laying of following size control cables in cable trenches from Control & Relay panel to marshalling box/equipments/ Junction Boxes etc in switch yard for new 63 MVA T/F as per cable schedule along with saddling at every 750mm distance with MS saddles of size 25x3 mm, including carriage of cable drums from store to laying site and shifting back remaining drums to store after work completion. The work shall also include interconnection of control cables with marshalling box, OLTC panel to RTCC panel, ferruling, dressing of cables and other associated works for satisfactory completion of job as per technical specification.
1) 2C x 2.5 sq mm
2) 4C x 2.5 sq mm
3) 6C x 2.5 sq mm
4) 10C x 2.5 sq mm
D) Interconnection & termination of the above laid control cables:
1) Interconnection & termination of the above laid control cables between Control & Relay Panels & erected equipment i.e. 63 MVA T/F CB, CT, CT Junction Box, PT, PT Junction box (Both LV & HV sides). The work also includes:
a) Making necessary holes in Gland Plates of Boxes wherever required along with supply of Cable glands of appropriate size, providing of ferrules for each core of the cables & its termination with crimping type copper lugs, preparation of interconnection drawing and providing 02 sets of hard copy of as executed interconnection drawing, commissioning of the panel/feeders in co-ordination with T&C and all other associated works required for the satisfactory completion of the job as per technical specification(01 job for each bay).
b) Connection of cables as per cable schedule of new 63 MVA Transformer & its RTCC panel at both ends, cooling fans, marshalling box etc, using existing cables, connection of all control cables at RTCC & Transformer end as per technical specifications.
E) Switchyard lighting for new 132KV & 33KV bays of 63 MVA T/F
1) Providing of Lighting Junction Box of size 280mm x 225mm x 150mm made of 16 SWG MS BP Sheet painted with smoke grey colour synthetic enamel paint duly fitted with 1 No 6 Amp SP MCB on Anodised MS channel, 1 No Bakelite Fuse fitting with 6 Amp capacity NS 6 type HRC Fuse, 1 No Copper Neutral Link, Bakelite terminal strip of 04 Nos terminals, cable glands suitable for 2C/4C x 2.5 sq mm size incoming/outgoing control cables etc & fixing on the GI Structure at designated height with the help of suitable duly fabricated MS Bracket Clamps and due earthing of the Junction Box including cable terminations.
2) Providing & Fixing of GI pole bracket of 40 mm dia ‘B’ class 1.20 meter long MS pipe (ID 35mm and OD 40mm) bent at angle of 30 deg for fixing of 125/110 Watt LED Lamp Fittings with the help of MS Bracket Clamps of suitable size for fixing on GI column structure at designated place.
3) Providing and fixing of 150 Watt LED street light luminaries of PHILIPS/ CROMPTON GREAVES/ HAVELLS/BAJAJ make in single piece die cast Aluminium Alloy Housing with Pot Optics Reflector & toughened clear glass cover with frame for Lamp compartment including cable terminations
4) Cable Laying & Termination
1) Laying of following sizes PVC insulated copper cable from LT ACDB Cubical to various Junction Boxes for switch yard lighting through excavated trench of size 300x600 mm, covering the cables with Ganga sand and brick laying over it, back filling, levelling of the trench after laying of cables (cables shall be provided by the department):
i) 4C x 2.5 sq mm
ii) 2C x 2.5 sq mm
iii) Providing and fixing of cable marker duly made of cast iron.
iv) Laying of control cables between Junction Box and LED light fittings through/along MS Pole/GI structure including necessary fixing of cable on GI structure.
MANAS ELECTRICALS
HARE KRISHNA ENERGY PROJECTS
M/s Abhinav Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .