CEO & SE (O&M), DGVCL Bharuch Circle
Carting of 8 Mtr. /200Kg. PSC poles from Vanakpur pole factory to various Destinations of Divisions under Bharuch Circle.
258965
16/2025-26/R1
Open
Civil Works - Others
Works
Bharuch
3 documents required · 3 mandatory
₹2,360
DGVCL Bharuch circle
₹50,000
29 Dec 2025
29 Dec 2025
29 Dec 2025
29 Jan 2026
29 Dec 2025
PART-II TECHNICAL BID
TENDER FOR: Carting of 8 Mtr. /200Kg. PSC poles from Vanakpur pole
factory to various Destinations of Divisions under Bharuch Circle.
Earnest Money Deposit Rs.:-_____________________________________
Signature of Tenderer
Pre-Qualification Criteria:-
1) The Bidder shall have to submit copy of Pan No.
2) The Bidder shall have to submit copy of GST registration.
3) Separate provident fund code number towards registration of your firm with
Regional P.F. Commissioner.
4) Latest bank solvency certificate of from any Nationalized bank, Public Sector
Banks, or IDBI Bank / AXIS Bank / HDFC Bank / ICICI Bank for a sum of
Minimum 20 % of estimated cost, of this wok, not more than 12 months old
effective from the date of invitation of tender.
5) The consultant shall have to submit C.A. certified financial turnover of the
last three years in which average annual financial turnover should be at least
30 % of the estimated cost.
6) No. of vehicles with registration no. (copy of RC Book,) and along with
following documents: - fitness certificate, Insurance validity, permit for
carting of long articles) and loading capacity (24/48/50 poles)/ Quotation of
Note: True copies of testimonials may be attached but will not be returned.
Place: Signature of Tenderers
Address of Tenderers:
Signature of Tenderer
GENERAL TERMS & CONDITION:
They shall have to pay E.M.D. amounting to Rs. 50,000.00/-. This amount will be
payable in Demand Draft/Bank Guarantee of any Nationalized Bank in favour of
DGVCL circle office situated at Bharuch.
SECURITY DEPOSIT:-
The successful tenders shall be required for further remit amount equivalent to 5 %
of the order value towards Security Deposit. This amount will be payable in Demand
Draft/Bank Guarantee at related Circle Office. It will be refunded after completion of
the contact and on production of non-objection certificates of all the concerned as
well as the pole factory.
The successful tenders shall also have to enter in-to agreement with the DGVCL
towards execution of the contract on non-judicial stamp paper of appropriate value
(Cost of stamp shall be borne by the contactor). This agreement will be executed as
per standard format of the DGVCL at related Circle Office before commencement of
INDEMNITY BOND:-
The successful contractor shall have to submit notarized indemnity to the DGVCL for
the entire liability of the employee engaged in the work by contractor. The indemnity
should also cover liability towards road accident done by vehicles of the contractor
during the execution of the work. For this purpose a notarized indemnity bond shall
have to be given in standard format on non-judicial stamp paper of appropopriate
value as per rules (cost of stamp shall be borne by the contractor).
TERMINATION OF CONTRACT:-
If the contractor is found to be lacking in execution of the work in any manner the
company reserves the right. To get work done through any other agency at the risk
and cost of the contractor.
1) To get work done through any other agency at the risk and cost of contractor.
2) DGVCL reserves the right to cart the poles departmentally without paying any
3) To cancel the unexecuted part of the contract without any notice and toward
this to any other agency at the risk and cost of the defaulter. For this purpose
contractor will be notified by RPAD giving a period of 10 days’ notice to
remedy the default by Superintending Engineer (O&M) of the concern Circle
Office. For non-execution of contract, contract shall be rescind and carry out
the work as per condition of booklet of "Tender and contract for works" and
S.D. paid shall be forfeited and the contractor shall be blacklisted.
Signature of Tenderer
SPECIAL TERMS AND CONDITION
SCOPE OF WORK:-
Basically, PSC poles of 8 Meter / 200Kg. type manufactured in Vanakpur pole factory
is required to transport to various works sites under the jurisdiction of DGVCL. The
work will include,
a. Loading of poles at pole factory in to the trucks. Loading should be done with
two point lifting. One point lifting shall not be allowed.
b. Transportation from the pole factory in to the trucks.
c. Unloading of the poles at work site. Unloading should be done with two point
lifting only. Single point lifting shall not be allowed.
Moreover, the DGVCL, if required shall also call-upon the successful contractor to,
cart the poles manufactured at factories other than mentioned above, carted at any
place within the state of Gujarat. Similarly destination, the poles will be anywhere
outside the Bharuch Circle Territory within the state of Gujarat.
The arrangement of necessary manpower as well as conveyance duly occupied with
loading, unloading facility will have to be made by the contractor at his own cost.
The working timing of issue of the poles from pole factory will be Day time (upto
Sunlight available).
The locations to which the poles are to be transported from the pole factories shall
be decided by Superintending Engineer or Executive Engineer of the concern
Division of Circle for the location under their jurisdiction at every month as per
allotment of poles from concern pole factory. Contractor will be responsible to
compensate the company for any damage to the pole carted either during loading of
pole at the pole factory or during transit or unloading the pole at the destination.
The cost of such damage will be fixed by concerned field office under whose
jurisdiction where damage might have been taken place and such decision shall be
final. Such cost of damage will be recovered from contractor‘s bills/ dues.
Normally allotment of PSC poles from the Vanakpur Pole Factory of DGVCL will as
per the requirement received from Sub Division Offices. The company will like to
engage more than one agency for each of the pole factory mentioned above in order
to meet with the requirement of carting of poles.
Poles are to be delivered maximum at 3 locations in same route of each 48/50 poles
Signature of Tenderer
The quantity of the pole to be carted to outside Circle shall be the part of ordered
quantity finalized in the contract.
Based on aggregate quantity to be carted in twenty four months will be approximate
nos. of poles as per Schedule-B. The DGVCL will likes to engage more than one
agency for the pole factory during emergency mentioned in order to meet with the
requirement of carting of poles.
It is proposed that the work shall be executed within the period of contract. It is
proposed that the work shall be executed within the period of 10 months from the
date of commencement of the contract which will be given within 15 days from the
date of issue of order.
It may be noted that quantities shown in Schedule-B are approximate and payment
will be made for actual quantities carted as per item rate quantity of poles.
It may be clearly under stood that the estimated quantities of the poles indicated
above are approximate and that they are likely to be more or less or to be nil during
any month at any time of the contractual period. The quantity varies as per actual
production / requirements of poles from time to time. If for any reason the pole
factory is unable to manufacture estimated quantity of poles shown above in any
month or at any time of the contractual period the contractor will be entitle to
transport the quantities manufactured in any particular month. The company’s
officers reserve the right to increase or decrease the quantities of poles to be
transported or delete any time either partly or wholly during the contractual period
.Payment of such work will be based on the offered rates and measurement for the
work actually done. No increase in rates will be allowed for such increase in rates
will be allowed for such increase or decrease in quantities of work.
The contractor shall have to transport the poles every month as per allotment of
poles from the concerned quantities. The nos. of poles and the destination to which
the poles are to be transported shall be fixed by the Company’s officer from time to
Validity of the Tender shall be six months after opening of tender and conditional
tenders to be out right rejected.
Company may have huge quantity of poles in very short period in special
circumstances then DGVCL reserve the right to cart through other carting contractor
without informing the contractor to whom order is placed for particular pole factory.
Signature of Tenderer
As made out clause for carting, the contractor has to arrange for the conveyance
facilities, for this purpose tenderer must furnished following particulars along with
(1) Nos. of trucks owned along with the R.T.O. registration no., loading capacity
(24/48/50 poles or higher).
(2) Year of make of each vehicle.
(3) Certified photo state copies of registration book of each vehicle.
(4) Certified photo state copies of documents relating to payments of RTO dues up
to date viz, the registration tax as well as goods tax. The tender will be liable to
be rejected without further communication in absence of basic information.
(5) Photo state copy of permit for carting of long articles.
The tenderer must simultaneously list out his commitments other than the proposed
contract of carting of PSC poles. If necessary certificate of the agency with whom
the vehicle might have been engage for specific contract/ works be produced to the
effect that the vehicle will be available for the proposed contract.
TRUCKS OF CARTING:-
The necessary trucks for carting of PSC poles of the standard size and weight shall
be arranged by the contractor. The owner should have legitimate permission for
carting such goods. The trucks shall also be equipped with necessary arrangement
for lifting of poles. The truck driver shall always be in possession of necessary RTO
documents to avoid any traffic problem. However in any extent the owner
/contractor/ driver of the truck shall be responsible for any liability arising out of
violation of RTO rules.
Accident Liability:-
The contractor shall be fully responsible for any mishap occurring while the vehicle is
on the road. This will include liability of outsider as well as the truck driver/ lineman/
cleaner/ employees of the contractor. The insurance liability will be fully to
contractor’s count.
DAMAGE LIABILITY:-
The contractor shall be responsible to make good of the damages which may be
occur either at the pole factory or at the site or during transportation of poles. You
will also be responsible to make good the loss due to breaking of pole while loading
or unloading or during transit. The indenter upon notice of such breakages will with
Signature of Tenderer
held amount equivalent to the cost of the damaged poles from the bills of the
ISSUE OF M.R’S. AND POLES:-
The transportation of poles shall be against issue of M.R’s. in quadruplicate by the
indenter. Necessary manpower as well as conveyance dully equipped with loading
unloading facility will have to be made by the contractor at his own cost. This will
issued by RPAD/Mail/Hand to hand or special messenger as may be necessary.
The price escalation due to increase or decrease in the price of diesel (HSD) will
be admissible at one paisa (1 paisa) per pole in the rate per increase/
decrease of fifty paisa (50 paisa only) in the price of diesel per litre for
third slab of above 75 km. on submission of evidence and will be effective from
the time of its announcement by Government. For 1st slab of 00 to 30 km,
paisa per pole will be increased or decreased on quoted rate for every
paisa rise/fall of price of diesel. For 2nd slab of 30.1 to 75 km, 80 paisa
per pole will be increased or decreased on quoted rate for every 50 paisa
rise/fall of price of diesel. The price variation clause is admissible for all
respective slabs. Basic diesel rate to be considered as per basic diesel rate of
Rs. 92.65/- litre.
The rates are inclusive of loading, carting, unloading and stacking the poles at the
destination for period of 24 months or order amount completed from date of LOI/
work order whichever is completed later. DGVCL will reserve right to get the poles
carted up to 30 % of the specified quantity through its own departmental vehicles.
No compensation for such carting will be admissible to the successful contractor.
The contract shall be operative for a period of 24 months or order amount
completed from date of LOI/ work order whichever is completed later.
The carting contractor will be required to cart the poles to the desired destination
within the specified period of allotment of the poles from our pole factory. In no
case our allotment should lapse on account of none carting of the poles. If for this
purpose the company is required to order some other agency, the same
will be done without demand of any compensation by the contractor.
If the contractor fails to transport poles during any month as directed by the
company’s offices, Company reserves the rights to cancel MR pending with
contractor for more than month and company shell transport these poles
through any other agency or departmental at the risk and cost of the
contractor without giving any notice or observing any formalities in this
regards and in that case any expenses that may be incurred in excess of the sum
which worked have been paid to the original contractor, if the said work had been
Signature of Tenderer
executed by him shall be born and shall be paid by the original contractor. The
contractor will have no claim for any loss sustained by him to such action.
In case if poles are lifted from pole factory and could not reach at proper
destination/site and found missing then the cost of such pole will be recovered from
carting contractor without any further reference.
Any poles carted to the place/location other than the destination specified in the
M.R. such poles shall be re-carted by the contractor to the location/destination
specified in the M.R. In the event of failure of the contractor to do so, they will be
carted either by the DGVCL or through other agency on account and at the risk of
the contractor.
Also DGVCL reserves the right at the desecration of competent authority of the
DGVCL to impose penalty at ½ % per week for delay subject to a maximum of 10 %
of contract value reckoned on the amount that would have been paid to the
contractor had the poles been carted in the stipulated time. Part of week will be
considered as one week. For working out the penalty, the material requisition
remained uncarted will be considered. If there is a backlog the same also will be
counted provided always that the delay in carting by the contractor will be condoned
on account of non-availability of PSC Poles or due to unforeseen circumstances on
his furnishing satisfactory reason and production of documentary proof thereof.
PAYMENT OF CARTING BILLS:-
The payment shall be made by the concerned Executive Engineer who received the
poles from pole factory on the basis of poles received by them. One duplicate copy
of bill should be given to Circle office, Bharuch for information & record.
Admissible income tax will be levied/ deducted as per prevailing rules time to time.
Also other taxes as per Govt. rules may be deducted from bills.
BOOKLET FOR TENDER AND CONTRACT FOR WORKS:-
All terms and condition of booklet for “Tender and contract for works” is made
available in circle office and applicable to contractor/bidder.
GST shall be payable extra as per prevailing rules from time to time.
Signature of Tenderer
DELAYED AND LATE TENDERS:-
1. No tender shall be accepted/opened in any case after due date and time of
receipt of tender irrespective of delay due to postal, services or any other
reasons and that the company shall not assume any responsibility for late
receipt of tender.
2. GST will be governed as per law from time to time.
Signature of Tenderer
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS & OTHER
RELATED MATTERS.
1. Wages to be paid & time of payment etc. by the contractor:-
The contractor shall pay minimum of as per latest minimum wages act or as may
be specified hereafter or rates fixed under the minimum wages act whichever is
higher. The wages of every contract labour employed by him under this contract
shall be paid by him before the expiry of 7th day of the last of the month in
respect of which the wages are payable (i.e wages of month have to be paid him
in the first week of the next month.) The payment shall be discharge in the
presence of Management representative during the working hours in factory
premises & the contractor shall get entries certificated in the register of wages by
the representative of the Board. Any default will result in cancellation of contract
forthwith or else the contractor shall be punishable to the extent of Rs. 100.00/-
fine per each day.
2. LABOUR LAWS:-
Person below age of 18 years shall not be employed for the work.
No female worker shall be employed in the night shift between 7 p.m. to 6 a.m.
Contractor shall maintain a valid labour licence under The Control Labour
(Regulation & Abolition) Act. for employing necessary manpower to be required by
him. In the absence of such license the contact shall comply with as under.
1. Payment of contribution by way of employer’s contribution towards provident
fund, family pension scheme, Deposit linked insurance scheme, Administrative
charges etc. at the rates applicable from time to time by Government of Gujarat /
Government of India or other Statutory Authority.
2. Payment of deposit in respect of each contract labour at the rate as per
Government norms from time to time with the office of frame there under of
labour as per The Control Labour (Regulation & Abolition) Act.
3. License fee as prescribed under The Control Labour (Regulation & Abolition)
Act. & rules frame there under depend upon the number of workmen employed
by the contractor.
4. Paid leave facility & wages as per the provision of the factories act at the rate
of one day for every 20 days of working.
5. Identity cards as prescribed under the facilities act with photo affixed there to
the same for identification.
Signature of Tenderer
6. Payment of retrenchment compensation notice pay & other liabilities as per
Industrial Disputes Act. Any payment to the contractor’s employees arising out of
any claim or disputes under The Industrial Dispute Act, 1947 or any other labour
7. Payment of compensation in case of accident injury.
8. Provision of ereche if the female labour employed are more than 30 numbers.
9. Maternity leaves as per the provision of Maternity Benefit Act.
10. All legal requirements should be strictly followed.
The above are some of the major liabilities of the contractor in addition to other
liabilities prescribed under the various labour laws in force from statutory
authorities like State Government / Government of India which the contractor
shall have to comply with.
3. Provident fund & Family pension scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding
deductions against employees provident fund & family pension scheme in respect
of each concerned against employee. Provident fund & family pension scheme at
the rate of 8.33 % (or at the rate made applicable by the Government from time
to time) of the wages. The contractor’s contribution & his workers contribution
towards provident fund, family pension scheme shall be deposited by the
contractor with Regional Provident Fund Commissioner.
4. Deposit Link Insurance:-
The contractor shall have to deposit 0.5 % of the wages in respect of employees
who is a member of the provident fund as the contribution to the Deposit link
insurance scheme with Regional Provident Fund Commissioner.
5. Administrative charges:-
Administrative charges for monitoring provident fund A/C shall be deposited by
the contractor with Regional Provident Fund Commissioner at the rates applicable.
6. Workmen’s compensation fund & employer’s liability Insurance:-
The contractor shall cover all his employees under workmen’s compensation fund
& under the liability insurance. The contractor shall employ adequate number of
experience staff at site for daily supervision & for maintenance of various register
& records required under the law & contract. No payment for supervision shall be
7. Contractor to Indemnity the DGVCL:-
The contractor shall indemnity the DGVCL & every member officer & employees of
the DGVCL also. Engineer in charge his staff against proceedings claims, demands,
Signature of Tenderer
costs & expenses what so ever arising out of or in connection with the matters
referred herein above elsewhere & against all actions. Proceedings claims, demand
costs & expenses which may be made against the DGVCL or Government for or in
respect of or formance of his obligation under the contract documents.
The DGVCL shall not be liable for in respect of or in consequences of any accident
or injury to any workmen or other person in the employment of contractor or his
sub contractor & the contractor shall indemnity & keep indemnified The Board
against all each damage & compensation & against all claims, demands,
proceedings costs, charges & expenses what so ever in respect thereof in relation
8. Work compensation & employer’s liability insurance:-
Insurance shall be affected for all the contractor’s employees engaged in the
performance of his contract if any of the work is subject the contractor shall
require the sub contractor to provide workmen’s employees unless such
employees are covered under the contractor’s insurance.
The DGVCL reserves the right to terminate this date of contract at any time during
its pendency without giving notice of termination or any reasons thereof.
The DGVCL will be entitled to deduct directly from the bills, to be paid to the
contractor any sum payable by you & which sum / sums the DGVCL is required to
pay a principal employer on account of your default in respect all liabilities
referred to in above clauses.
DGVCL, Circle Office
Signature of Tenderer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice_R1-Vanakpur PF.pdf
Technical Bid_R1-Vanakpur PF.pdf
Price Bid_Vanakpur PF.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .