Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹1.5 CrAdmitted-Finance WARD NO 01 PUNJABI COLONY GADARPUR U S NAGAR | LUDHIANA | PUNJAB | 141001 | ₹1.5 Cr | H1 | Admitted-Finance |
| 2 | H2₹1.5 CrAdmitted-Finance COURT ROAD UTTARKASHI | ₹1.5 Cr | H2 | Admitted-Finance |
| 3 | H3₹1.5 CrAdmitted-Finance NEAR SHIV SHAKTI DHARAM KANTA SHIV PURAM FULSUNGA RUDRAPUR U S NAGAR UTTARAKHAND | UDAM SINGH NAGAR | UTTARAKHAND | 244712 | ₹1.5 Cr | H3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIV ELECTRICALS H2 | PERFECT ELECTRICALS AND ENGINEERS H3 | HIMALAYA BUILDCON H1 |
|---|---|---|---|---|---|---|
| 1.00Annexure-A (LABOUR CHARGES) | ||||||
| 1.01 | Charges of making foundation of Compact Sub Station with all work as per direction of Engineer in charge. | 2 | Job | 5,20,962 ₹10,41,924 | 5,20,950 ₹10,41,900 Lowest | 5,20,972 ₹10,41,944 |
| 1.02 | Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor), connecting the same with G.I. Strip (to be supplied by contractor) of size 35x6 mm for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. | 16 | Nos. | 10,993 ₹1,75,888 | 10,980 ₹1,75,680 Lowest | 10,998 ₹1,75,968 |
| 1.03 | Charges of Fixing of GI pipe as per direction of Engineer in Charge. | 24 | Mtr | 250 ₹6,000 | 243 ₹5,832 Lowest | 251 ₹6,024 |
| 1.04 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (250 KVA). | 2 | Nos. | 3,043 ₹6,086 | 3,040 ₹6,080 Lowest | 3,050 ₹6,100 |
| 1.05 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (400 KVA). | 1 | Nos. | 3,648 ₹3,648 | 3,644 ₹3,644 Lowest | 3,650 ₹3,650 |
| 1.06 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (500 KVA). | 1 | Nos. | 3,648 ₹3,648 | 3,644 ₹3,644 Lowest | 3,650 ₹3,650 |
| 1.07 | Erection of 11/0.4 KV 990 KVA Compact Secondary Substation as per Specifications. | 2 | Nos. | 1,12,096 ₹2,24,192 | 1,12,086 ₹2,24,172 Lowest | 1,12,100 ₹2,24,200 |
| 1.08 | Laying Sagging of LT XLPE AB Cable 3x120+1x95 +1x16 Sq.mm. | 1,800 | Mtr | 24 ₹43,200 | 23 ₹41,400 Lowest | 25 ₹45,000 |
| 1.09 | Installation of LT Distribution Box 3 Phase for LT AB Cable. | 40 | Nos. | 25 ₹1,000 | 23 ₹920 Lowest | 26 ₹1,040 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
4 Aug 2026, 12:00 pmClosed
Superintending Engineer
Electricity Distribution Circle, Rudrapur
Installation of 11/0.4 KV 990 KVA Compact Sub Station at Jafarpur under 33/11 KV S/s Danpur under E.D.D. Rudrapur-II
2026_UPCL3_97809_1
EDC(USN)29/2026-27
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Please refer tender documents
4 documents required · 4 mandatory
₹11,800
EE ETD Rudrapur
₹3 L
18 Aug 2026
18 Jul 2026
5 Aug 2026
18 Jul 2026
4 Aug 2026
18 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Annexure-A (LABOUR CHARGES) | |||||
| 1.01 | Charges of making foundation of Compact Sub Station with all work as per direction of Engineer in charge. | 2 | Job | - | - |
| 1.02 | Earthing of distribution transformer including digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor), connecting the same with G.I. Strip (to be supplied by contractor) of size 35x6 mm for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm. | 16 | Nos. | - | - |
| 1.03 | Charges of Fixing of GI pipe as per direction of Engineer in Charge. | 24 | Mtr | - | - |
| 1.04 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (250 KVA). | 2 | Nos. | - | - |
| 1.05 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (400 KVA). | 1 | Nos. | - | - |
| 1.06 | Dismantling of Transformers from double pole/plinth including opening of all connections, circuts & earthing strip etc. (500 KVA). | 1 | Nos. | - | - |
| 1.07 | Erection of 11/0.4 KV 990 KVA Compact Secondary Substation as per Specifications. | 2 | Nos. | - | - |
| 1.08 | Laying Sagging of LT XLPE AB Cable 3x120+1x95 +1x16 Sq.mm. | 1,800 | Mtr | - | - |
| 1.09 | Installation of LT Distribution Box 3 Phase for LT AB Cable. | 40 | Nos. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.82 MB
TN292627tenderdocumentCSSJafarpur.pdf
Tender Documents • 1.48 MB
FormAandB.pdf
Other Document • 0.67 MB
GeneralInstruction292627.pdf
Other Document • 0.76 MB
TechnicalSpecificationCSS.pdf
Additional Documents • 21.03 MB
DrawingsCSS.pdf
Additional Documents • 4.37 MB
BOQ_115458.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].