Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.1 L+₹1.4 L (5.06%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹29.5 L+₹1.8 L (6.38%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹29.7 L+₹2.1 L (7.46%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹30.3 L+₹2.6 L (9.35%)Rejected-AOC 306 SHIV BARI MARG PANCHVATI NAGAR BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
21 Sept 2020, 6:00 pmClosed
CWE
HQ CWE AF BHISIANA
Outsourcing services for external electrical distribution system at AF Station Bhisiana
2020_MES_371804_1
CWE(BHI)/BHI-22/2020-21
Open Tender
Manpower Supply
Item Rate
330 days
AFS BHISIANA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE AF BHISIANA
₹50,000
Yes
24 Sept 2020
25 Aug 2020
23 Sept 2020
25 Aug 2020
21 Sept 2020
9 Sept 2020
25 Aug 2020 - 28 Aug 2020
Amount
Manning and Operation of HT 11 KV/433 volts installations including transformers /HT panels/LT Panels etc at AF Bhisiana round the clock i,e in three shifts of 8 hour duration each with One Electrician (Skilled) per shift on all days including Sundays and Holidays all as specified and directed by Engineer-in-Charge. Note : (i) Electrician (Skilled) should have minimum Qualification ITI or 4 years Experiance. Note : (a) One Electrician (Skilled) per shift for three shifts in a day shall be required to maintain /checking the installations (11KV/433Volts) etc all as directed and specified by Eng in charge (b) The Electrician Personal shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident /Injury , fatal or partial disability , the cotractor shall be solely responsible for setting all Claims/Compensation. Department will have a right to recovery any sum indicated /Claimed by labour Commissioner/Court directive. GE will however ensure that contractor has provided all adequate & required means to the workmen and contractor shall get his personnel insured.
Rate required to be quoted for executing the work as described in Serial No. 1.00 here-in-before:-
Worker's wage (Basic) per person as per existing rules.
Employees Provident Fund as mentioned in the tender documents (EPF).
Employees State Insurance Contribution as mentioned in the tender documents (ESIC).
Contribution of Bounus as mentioned in the tender documents.
Over head & profit on serial No. 1.02 to 1.05.
LWC as mentioned in the tender documents (Labour Welfare Cess).
GST as mentioned in the tender documents.
Manning and Operation of HT 11 KV Sub Station Mafi -I at AF Bhisiana round the clock i,e in three shifts of 8 hour duration each with One Electrician (Skilled) per shift on all days including Sundays and Holidays including operating all equipments installed at sub station all as specified and directed by Engineer-in-Charge. Note : (i) Electrician (Skilled) should have minimum Qualification ITI or 4 years Experiance. Note : One Electrician (Skilled) per shift for three shifts in a day shall be required to operate the following installation in the same location. (a) 11 KV Sub Stn. (i) HT 11 KV 3 Phase 50 HZ indoor VCB =7Nos , LT Panels =02 Nos (ii) Transformer 630 KVA ,630KVA voltage stablizer and 630 KVA isolation transformer -02 Nos for each Note : Cleaning of Power House/Pump House included in quoted rate of this item shall be as under:- (b) Daily cleaning of main Power House (c) Daily cleaning of all Electrical Machineries and acesseries , (d) Removing of vegetation growth , cleaning/brooming of Floors,Walls roofs inside main Power House (e) For entry into Power House/Pump House /DG Set complex , main gate shall always be kept closed and locked and opeaned only when required due to any specific reasons. (f) No unauthorised person shall be allowed to enter main Power House/DG Set complex. (g) The Contractor shall maintain proper log Sheet on daily basis to be produced to the Engr in Charge and hand over the log sheet to the JE E/M in charge every day .Log sheet will be provided by the contactor . (h) The operator having ITI qualification or 4 years of experience to operate 11 KV Installation , (j) l 11 KV Installation, shall be handed over in Operation state at the time of Commencement of Contract and shall be taken over in the same state at the time of completion as directed by Engr in Charge. (k) The Operating Personal shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident /Injury , fatal or partial disability , the cotractor shall be solely responsible for setting all Claims/Compensation. Department will have a right to recovery any sum indicated /Claimed by labour Commissioner/Court directive. GE will however ensure that contractor has provided all adequate & required means to the workmen and contractor shall get his personnel insured.
Rate required to be quoted for executing the work as described in Serial No. 2.00 here-in-before:-
Worker's wage (Basic) per person as per existing rules.
Employees Provident Fund as mentioned in the tender documents (EPF).
Employees State Insurance Contribution as mentioned in the tender documents (ESIC).
Contribution of Bounus as mentioned in the tender documents.
Over head & profit on serial No. 2.02 to 2.05.
LWC as mentioned in the tender documents (Labour Welfare Cess).
GST as mentioned in the tender documents.
Manning and Operation of HT 11 KV Sub Station Mafi -I at AF Bhisiana round the clock i,e in three shifts of 8 hour duration each with two helper (Unskilled) per shift on all days including Sundays and Holidays including operating all equipments installed at sub station all as specified and directed by Engineer-in-Charge. Note : Two helper (Unskilled) per shift for three shifts in a day shall be required to operate the following installation in the same location. (a) 11 KV Sub Stn. (i) HT 11 KV 3 Phase 50 HZ indoor VCB =7Nos , LT Panels =02 Nos (ii) Transformer 630 KVA ,630KVA voltage stablizer and 630 KVA isolation transformer -02 Nos for each Note : Cleaning of Power House/Pump House included in quoted rate of this item shall be as under:- (b) Daily cleaning of main Power House (c) Daily cleaning of all Electrical Machineries and acesseries , (d) Removing of vegetation growth , cleaning/brooming of Floors,Walls roofs inside main Power House (e) For entry into Power House/Pump House /DG Set complex , main gate shall always be kept closed and locked and opeaned only when required due to any specific reasons. (f) No unauthorised person shall be allowed to enter main Power House/DG Set complex. (g) The Contractor shall maintain proper log Sheet on daily basis to be produced to the Engr in Charge and hand over the log sheet to the JE E/M in charge every day .Log sheet will be provided by the contactor . (h) The operator having ITI qualification or 4 years of experience to operate 11 KV Installation , (j) l 11 KV Installation, shall be handed over in Operation state at the time of Commencement of Contract and shall be taken over in the same state at the time of completion as directed by Engr in Charge. (k) The Operating Personal shall be provided with protective clothing & shall wear them while operating the plant. In case of any accident /Injury , fatal or partial disability , the cotractor shall be solely responsible for setting all Claims/Compensation. Department will have a right to recovery any sum indicated /Claimed by labour Commissioner/Court directive. GE will however ensure that contractor has provided all adequate & required means to the workmen and contractor shall get his personnel insured.
Rate required to be quoted for executing the work as described in Serial No. 3.00 here-in-before:-
Worker's wage (Basic) per person as per existing rules.
Employees Provident Fund as mentioned in the tender documents (EPF).
Employees State Insurance Contribution as mentioned in the tender documents (ESIC).
Contribution of Bounus as mentioned in the tender documents.
Over head & profit on serial No. 3.02 to 3.05.
LWC as mentioned in the tender documents (Labour Welfare Cess).
GST as mentioned in the tender documents.
M/s Manav Builders
M/s GURFATEH BUILDERS
M/s Vee Kay Associates
M/s Luxmi Constructions
M/S BALWINDER SINGH
M/s SUPERTECH ENGINEERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .