9 Feb 2023, 5:00 pmClosed
SE ETC BAREILLY
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Centrifuging of Transformer Oil of 315MVA ICT-II alongwith other associated Works at 400KV Substation Bareilly under E.400KV Substation Division, Bareilly
2023_UPTCL_770677_1
E-Tender No. 48/W/ETC(B)/ 2022-23
Open Tender
Electrical Works
Item Wise
30 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC BAREILLY
₹3,000
23 Feb 2023
31 Jan 2023
10 Feb 2023
31 Jan 2023
9 Feb 2023
31 Jan 2023
Amount
Centrifuging of Transformer Oil of 315MVA ICT-II alongwith other associated Works at 400KV Substation Bareilly under E.400KV Substation Division, Bareilly with all cost of men,Misc, consumables,Normal and special T&P, centrifuging machine with operator etc. Required for satisfactory completion of the work with all due care of safety & precautions as per Technical specifications and direction of the Supervising engineer as per details Below-:
Removal of jumpers of HV / LV / IV side of T/F the scope of work involves opening of nuts and bolts and removal of jumpers and removal of bushing clamps if required andJumpering of HV/LV/IV side bushing of T/F after centrifuging of Oil. The scope of work involves tightening of bushing clamps with appropriate size nut &bolts , replacement of clamp and jumper if required and associated work to complete the job satisfactorily.
Centrifuging/Dehydration of the Complete T/F Oil in315MVA ICT-II by Ultra High Vacuum oil filtration Plant after contenting the Centrifuging Ripe with ICT Tank to Oil Filtration Plant including taking the BDV, PPM Values of Oil & IR Values of ICT Bushings periodically (even 02 Hrs.) till the required values are achieved. Centrifuging machine alongwith operator and associated T&P, Testing kits (PPM, BDV & IR) shall be arranged by contractor. The operator must record all parameters (as per standard).
Z R Associates
LASHANI ENTERPRISES
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .