Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 LAccepted-AOC A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹7.8 L | 1 | Accepted-AOC Accept |
| 2 | 2₹7.9 L+₹13,133 (1.69%)Rejected-Finance | ₹7.9 L+₹13,133 (1.69%) | 2 | Rejected-Finance 2 |
| 3 | 3₹7.9 L+₹13,714 (1.76%)Rejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹7.9 L+₹13,714 (1.76%) | 3 | Rejected-Finance 3 |
| 4 | 4₹8.1 L+₹29,935 (3.84%)Rejected-Finance CHANDRA LOK COLONY WARD NO 1 NAVALPURA KHURJA BULANDSHAHR | HATHRAS | UTTAR PRADESH | 203001 | ₹8.1 L+₹29,935 (3.84%) | 4 | Rejected-Finance 4 |
| 5 | 5₹8.5 L+₹74,730 (9.59%)Rejected-Finance | ₹8.5 L+₹74,730 (9.59%) | 5 | Rejected-Finance 5 |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR SHARMA L4 | MITTAL BROTHERS L5 | M/S PRADEEP ASSOCIATES L1 | M/S Harish Kumar Contractor L3 | PRAGYA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work is foundation in all type of soIl (Loam clay or sand) including lift upto 1.5M and lead upto 30M Including back filling Watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by Engineer in charge up to a distance of 30m from the foundation trenches. as directed by Engineer incharge | 20 | Cum | 50 ₹1,000 Lowest | 80 ₹1,600 | 50 ₹1,000 Lowest | 72.03 ₹1,440.6 | 72 ₹1,440 |
| 2.00 | Providing and laying C.C. 1:3:6 with approved quality of coarse sand of F.M. more than 2.00 and 20 mm graded coarse aggregate including cost cost of ef materials labour charges, curing work T&P taxes etc. but excluding shuttering & Its labour charges required for complition of work in all condition. as directed by Engineer incharge | 6.4 | Cum | 4,000 ₹25,600 Lowest | 5,000 ₹32,000 | 4,200 ₹26,880 | 4,681.95 ₹29,964.48 | 4,446.72 ₹28,459.01 |
| 3.00 | Providing and laying R.C.C. 1:1.5:3 with approved quality of coarse sand of F.M. more than 2.00 and 20 mm graded coarse aggregate including cost of all materials.labour charges,curing work, T&P taxes etc. but excluding shuttering and reinforcement & Its labour charges required for proper compition of work in all condition of site. as directed by Engineer incharge | 2.3 | Cum | 500 ₹1,150 Lowest | 6,500 ₹14,950 | 5,500 ₹12,650 | 5,546.31 ₹12,756.51 | 5,771.3 ₹13,274 |
| 4.00 | Providing and laying C.C. 1:1.5:3 with approved quality of coarse sand of F.M. more than 2.00 and 20 mm graded coarse aggregate including cost of all materials.labour charges,curing work, T&P taxes etc. but excluding shuttering and reinforcement & Its labour charges required for proper compition of work in all condition of site. as directed by Engineer incharge | 11 | Cum | 4,500 ₹49,500 Lowest | 6,000 ₹66,000 | 5,000 ₹55,000 | 6,122.55 ₹67,348.05 | 5,306.9 ₹58,375.9 |
| 5.00 | Centering and shuttering for R.C.C. work shuttering i/c rent of shuttering material, labour and T&P required for proper complition of work, as directed by Engineer incharge | 38 | Sqm | 500 ₹19,000 | 800 ₹30,400 | 750 ₹28,500 | 414.17 ₹15,738.55 Lowest | 579.6 ₹22,024.8 |
| 6.00 | Centering and shuttering for C.C. work shuttering i/c rent of shuttering material, labour and T&P required for proper complition of work. as directed by Engineer incharge | 141 | Sqm | 500 ₹70,500 | 500 ₹70,500 | 400 ₹56,400 Lowest | 576.24 ₹81,249.84 | 414 ₹58,374 |
| 7.00 | Finishing wall (two coat) with water proofing Cement paint of approved make such as super snowcem, Durocem of required shade on undecorated wall surface over and including one coat of cement primer Including cost of all material, labour & T&P etc. required for proper complition of work excluding GS.T. as directed by Engineer incharge | 787 | Sqm | 60 ₹47,220 | 70 ₹55,090 | 50 ₹39,350 Lowest | 54.02 ₹42,515.71 | 54.72 ₹43,064.64 |
| 8.00 | Supplying & laying of rinforcement(TMT Steel bar) as per approved drawing, including removal of rust , cutting,binding,placing with proper overlap etc. The item includes cost of all material, labour charges, binding with 24 BWG binding wire, T&P taxes etc, required for proper compition of work. as directed by Engineer incharge | 0.13 | M.T. | 60,000 ₹7,800 | 75,000 ₹9,750 | 75,000 ₹9,750 | 54,022.5 ₹7,022.92 Lowest | 54,066.7 ₹7,028.67 |
| 9.00 | Mild Steel or iron work in heavy sizes gates welded in built up sections/ framed work, including cutting, hoisting, fixing in position, hold fast and using structural steel etc.including supplying material as required.in gratings, frames, guard bar, ladder, railings, brackets, gates and similar work. as directed by Engineer incharge | 3,024 | kg. | 80 ₹2,41,920 | 80 ₹2,41,920 | 75 ₹2,26,800 | 60.65 ₹1,83,403.36 Lowest | 72 ₹2,17,728 |
| 10.00 | Painting two coat over priming coat including cost of primer on steel and other metal surface including cleaning the surface of all dirt, dust and other foreign matter, sand papering and stopping including cost of all material, labour T&P etc. as required for proper completion of work. paint shall be used as pr standard I.S. specfication. all as specified and directed by Engineer-in-charge. | 30 | Sqm | 50 ₹1,500 Lowest | 70 ₹2,100 | 80 ₹2,400 | 64.83 ₹1,944.81 | 66.96 ₹2,008.8 |
Tender Value
₹11 L
EMD Value
₹22,000
Closing Date
22 Aug 2025, 12:00 pmClosed
Executive Engineer
U.M.B.C.D.G.C. Khurja
Construction of precast Boundry wall
2025_UPIDC_1065054_30
08/E.E./2025-26
Open Tender
Civil Works
Item Rate
90 days
U.M.B.C.D.G.C. Khurja
Please refer Tender documents.
3 documents required · 3 mandatory
₹876
₹22,000
18 Oct 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .