Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,700
Closing Date
22 Jun 2022, 4:00 pmClosed
Dy. Director General VTS Gandhidham
Plot no. 17 Sector 8 Gandhidham
Construction of Security Cabin at Okha VTS/LH Station
2022_DGLL_681922_1
NIT/DDG/2022-23/02
Open Tender
Civil Works
Works
90 days
Okha
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,700
Deep Bhavan Gandhidham
26 Jul 2022
2 Apr 2022
23 Jun 2022
2 Apr 2022
22 Jun 2022
2 Apr 2022
21 Jun 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator ) /manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as10 sqm on plan) inluding getting out and disposal of excavated earth lead upto 50m lift uotp1.5m, as directed by Enginner in charge.
All Kind of Soil/hard rock
Providing and laying Plain cement concrete in 1:3:6 (1Cement : 3 Course sand : 6 graded stone aggregate) 40 mm nominal size of approved quality of materials including mixing , laying, Scaffolding,Compacting and Curing etc., including the cost all materials, tools & plants, labours etc. complete.
providind and Laying cement concrete 1: 1½ :3(1 cement:1½course sand :3stone aggegate 20mmdown gauge) for R.C.C. Works as per drawing,curing including providing cover blocks in CM 1:2 of required thickness complete, supply of all materials, labour, tools and plants, mixing,laying in all levels and consolidation with required vibrator,cost of centering and shuttering ,scaffolding leaving holes and openind wherever required completed as directed and as per drawing excluding reinforcement including supply of all labour,material,tools & plants etc., complete.
For footing, columns and grade beams below ground level.
Columns above ground level
In Super Structure -Chajja,Cupboard slab,Lintel & Beam
Roof slab of 125 mm thickness
Providing and laying Reinfocement TMT steel of approved quality ( SAIL / VIZAK / TATA / TISCON ) including the cost of all materials, labours, tools & plants, cutting, bending binding , placing in position steel reinforcement as per drawing and as directed including cost of binding wire etc., complete.
Construction of C.C block masonry wall & pillar in superstructure of buildings upto floor 2 level in cement mortar of mix 1:5 (1 cement: 5 river sand) with approved size(380mmx230mmx200mm with CC1:3:6), as directed including cost of supply of all labours, materials, tools & plants, scaffolding and all other charges etc. complete.
18 mm thick Cement Plastering to CC Block masonry with cement mortar (1 : 4 ) ( 1 cement : 4 sand ) and rackingout joints as directed, including the cost of all materials, labours, tools & plants, scaffolding curing etc., complete.
15mm thick Cement Plastering to CC Block masonry with cement mortar (1 : 3) ( 1 cement : 3sand ) and rackingout joints as directed, including the cost of all materials, labours, tools & plants, scaffolding curing etc., complete.
Apex ultima two coats over a coat of primer of approved brand and manufacturer and of approved colour on new wall surfaces to give an even shade after throughly brushing the surface free from mortar droppings and other foregin matter,cleaning and also including preparing the surface even sand papered smooth including supply of all materials,tools & plants,labour and all other charges etc., complete.
Providing & applying white cement based putty of average thicness 1mm ,of approved brand ( birla white/JK Cement) or any approved brand and manufuctures over the plastered wall surface to preper the surface even and good for smooth with applying putty over one coat primer of Inspection Quarter with approved brand after preparing the surface good for applying the primer as directed & as described as per condition at site including the cost of all materials, labours, tools & plants , scaffolding etc., complete.
Applying two coats of Distempering on the inside painted wall surfaces with oil bound washable distemper of approved quality (Berger / Asian brand or equivalent of 1st quality) & colour , even shade with a coat of primer wherever required at all heights and as directed & as described as per condition at site after cleaning and preparing the surface good for distempering including the cost of all materials ,labour ,tools & plants , scaffolding etc., complete.
Filling the available Morrum inside the plinth & foundation and as directed in depth consolidating each deposited layers by ramming and watering, lead up to 50m and in all heights including the cost of labours, tools & plants and all other charges etc complete as directed.
Filling the available Sand inside the plinth & foundation and as directed in depth consolidating each deposited layers by ramming and watering, lead up to 50m and in all heights including the cost of labours, tools & plants and all other charges etc complete as directed.
Providing & laying 1st quality ceramic-vetrified floor/skirting tiles of size 600x600x10mm thickness for flooring of approved make like NITCO, Orient, Somany, Kajaria ,bell etc.Conforming to IS of apprved colours as white, ivory,grey, fume red brown laid on 20mm thick bed cement mortar( CM) 1:4 for foor tiles and 12mm thick bed of cement mortar( CM) 1:3 ( 1 cement : 3 coarse sand) for dado tiles, Including jointing with white cement mixed with pigment of of matching shade complete.
Providing & laying prepolished granite stone on the old flooring 20mm(ovg) thick of approved quality & colour laid over a bed of CM 1:3 (1 cement: 3 River sand) of thickness 20mm(avg) pointing with white cement slurry after removal of existing floring including the cost of Replastering in CM 1:3, rubbing, polishing, washing, cutting, laying, fixing, leveling, maintaining gradient jointing, after removing the old flooring & preparing the surface fof providing granient jointing, after removing the old flooring & preparing the surface for providing granite stone etc. as directed & as described as per condition at site including the cost of all materials, labours tools & plants and all other charges etc. complete.
Providing and fixing 35 mm thick factory made laminated veneer lumber door shutter conforming to IS : 14616 and TADS 15:2001 (Part B) including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws, all complete as per directions of Engineer-in-charge and panelling with panels, as directed & as described as per condition at site including the cost of all materials, labours tools & plants and all other charges etc. complete.
Providing and fixing window having extruded alluminium colour power coated section frame main outer size 63.50X38.10X1.95 mm (jindal Section No.4605 @ wt 1.094 kg/Rmt) horizontal Two Track member size 61.85mm X31.75mm X1.20mm (of Jindal section No. 8758 @ Wt. 0.659 Kg/ mt) with sliding shutters of Horizontal member size 40mm X18mm X1.29 mm(of Jindal section No.8949 @wt. of 0.456 kg./mt) vertical member of size 40mm X18mm X1.29 mm( of Jindal section No. 8947 @wt.of 0.456 kg/mt,/ section 8948 @Wt.bronze colour tinted float glass with powder coated alluminium fitting and fixtures and transparent silicon sealant glass fixing to frames as per detail etc.
Fram main member (63.50x38.10x1.95mm)
Shutter (40mmx18mmx1.29mm)
float glass panes 5.50mmthicness
Providing 16mm dia Mild steel rods/Grill to the window frame as directed including cutting the bars to suitable length, straighting, drilling holes in the wooden frame and fixing the rods in line and level(100mmC/C) etc complete including cost of all matierials, labour, tools and plants etc complete as directed.
S.E. Painting with two coats to MS grill for all heights with approved paints of first quality and colour after removing worm out cement by scapping and applying one coat of zinc chromate as directed at site, including the cost of all materials, labours, tools & plants, necessary safty belt etc complete
KK ENGINEERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .