Tender Value
₹3.0 L
EMD Value
₹7,402
Closing Date
21 Aug 2026, 3:00 pm6d left
AEE
o/oAEEBuildingsSubdivisionEKM
The main items included in the estimate are demolishing the existing toilet walls for attaching and combine the rooms dismantling the existing jally work solid block masonry work for the existing opening area ventilator gap area etc
2026_PWD_865584_1
34/AEE/BL/EKM/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Kakkanad
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹7,402
Yes
14 Aug 2026
14 Aug 2026
24 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1estimate | |||||
| 1.001 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | - | cum | 2,129.84 | - |
| 1.002 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | - | sqm | 75.87 | - |
| 1.003 | 15.40.2:Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness above 40 mm upto 75 mm | - | sqm | 448.45 | - |
| 1.004 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | 13,442.14 | - |
| 1.005 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | 762.88 | - |
| 1.006 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | 112.43 | - |
| 1.007 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 1 | sqm | 579.74 | ₹579.16 |
| 1.008 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 9,235.97 | - |
| 1.009 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 1 | cum | 7,713.54 | ₹7,705.83 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1464884.xls
BOQ • 0.35 MB
bidADM.pdf
Tender Documents • 1.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].