| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-AOC | ₹15.2 L | L1 | Accepted-AOC ACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Binu P L2 | S SURENDRAN PILLAI L1 |
|---|---|---|---|---|---|
| 1.00culvert | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m) | 208.28 | cum | 72.61 ₹15,123.21 | 66.42 ₹13,833.96 |
| 1.00 | 2.4.1.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means | 20.4 | cum | 1,463.57 ₹29,856.83 | 1,338.85 ₹27,312.54 |
| 1.00 | 15.9:Construction of dry rubble flooring at cross drainage works for relatively less important works. | 6.21 | cum | 5,906.72 ₹36,680.73 | 5,403.37 ₹33,554.93 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 58.64 | cum | 8,427.26 ₹4.9 L | 7,709.12 ₹4.5 L |
| 1.00 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 51.07 | cum | 9,762.25 ₹5.0 L | 8,930.34 ₹4.6 L |
| 1.01 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 17.7 | cum | 10,197.4 ₹1.8 L | 9,328.41 ₹1.7 L |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 18.38 | cum | 10,605.28 ₹1.9 L | 9,701.53 ₹1.8 L |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 1.78 | MT | 1,15,784.31 ₹2.1 L | 1,05,917.47 ₹1.9 L |
Tender Value
₹14.4 L
EMD Value
₹36,007
Closing Date
22 Oct 2025, 3:00 pmClosed
The Executive Engineer
The Executive Engineer pwd roads division kollam
GENERAL FDR 2025 26 Construction of Culvert and drain to Avaneeswaram Kuttikkonam road Km 1 400 General Civil Work
2025_PWD_797344_2
42/EE/ET/2025-26
Open Tender
Civil Works - Roads
180 days
kollam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹36,007
Yes
6 Jan 2026
13 Oct 2025
24 Oct 2025
13 Oct 2025
22 Oct 2025
13 Oct 2025
Amount
culvert
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
2.4.1.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres - Cement Concrete Grade M-15 & M-20. - By Manual Means
15.9:Construction of dry rubble flooring at cross drainage works for relatively less important works.
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork)
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Binu P (BID ID -2392947)
Bidder Name
S SURENDRAN PILLAI
Binu P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1349339.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1349339.xls
BOQ • 0.30 MB
sbd.pdf
Tender Documents • 1.63 MB
nitpdf.pdf
Tender Documents • 0.03 MB
Download all tender documents and submit your bid