Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance | L1 | Accepted-Finance Lowest Bid | |
| 2 | L2₹11.9 L+₹15,912 (1.36%)Rejected-Finance | L2 | Rejected-Finance Higher Bid | |
| 3 | L3₹11.9 L+₹22,464 (1.92%)Rejected-Finance COOCH BEHAR | JALPAIGURI | WEST BENGAL | 735122 | L3 | Rejected-Finance Higher Bid |
| Sl No | Description | Qty | Unit | m/s SHISHU KUMAR SARKAR L2 | ELECTROCRAFT L3 | GANESH ELECTRIC CO L1 |
|---|---|---|---|---|---|---|
| 1.00Maintenance of Electrical Installation of all floors/blocks of the entire premises including staircase lights, compound lighs and DG Operationt etc. for the period of 12 months Shift 1 : Semi Skilled: 02(Two) Nos & Un-skilled:03(Three) Nos For General Shift (8Hrs) with 24x365 Hours on call support. | ||||||
| 1.01 | Semi Skilled Workman: 02(Two) Men for 12 months [26(Twenty Six) Working Days per Month] | 624 | Manpower Per Day | 803 ₹5,01,072 | 821 ₹5,12,304 | 794 ₹4,95,456 Lowest |
| 1.02 | Un-Skilled Workman: 03(Three) Men for 12 months [26(Twenty Six)Working Days per Month] | 936 | Manpower Per Day | 733 ₹6,86,088 | 728 ₹6,81,408 | 722 ₹6,75,792 Lowest |
| 2.00Note: 1) All the above rates should be quoted inclusive of all taxes, duties and all ancilery charges. 2) Total is rounded off to the nearest rupees. 4) PF & ESI contribution documents must be provided to the concerned JE/AE, PWDte prior prepartion of the bills. | ||||||
Tender Value
₹11.8 L
EMD Value
₹23,552
Closing Date
2 Apr 2026, 12:00 pmClosed
Executive Engineer Cooch Behar Electrical Division
Sunity Road, Circuit House Campus, Cooch Behar, Pin-736101,
Annual Maintenance Contract of Electrical Installations, different electrical equipments and testing of DG Sets at different Govt. Office buildings and Residential buildings under Cooch Behar Electrical Division.
2026_WBPWD_1022894_1
WBPWD/EE/CED/eNIT-48/2025-2026
Open Tender
Support/Maintenance Service
Item Rate
365 days
Cooch Behar
Please refer Tender documents.
7 documents required · 7 mandatory
₹23,552
16 Apr 2026
14 Mar 2026
6 Apr 2026
14 Mar 2026
2 Apr 2026
20 Mar 2026
Maintenance of Electrical Installation of all floors/blocks of the entire premises including staircase lights, compound lighs and DG Operationt etc. for the period of 12 months Shift 1 : Semi Skilled: 02(Two) Nos & Un-skilled:03(Three) Nos For General Shift (8Hrs) with 24x365 Hours on call support.
Semi Skilled Workman: 02(Two) Men for 12 months [26(Twenty Six) Working Days per Month]
Un-Skilled Workman: 03(Three) Men for 12 months [26(Twenty Six)Working Days per Month]
Note: 1) All the above rates should be quoted inclusive of all taxes, duties and all ancilery charges. 2) Total is rounded off to the nearest rupees. 4) PF & ESI contribution documents must be provided to the concerned JE/AE, PWDte prior prepartion of the bills.
stage.html
html • 0.04 MB
technical_2514076.pdf
techsummary_2514076.pdf
finance_2514076.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 0.70 MB
BOQ_2514076.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .