Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-Finance | ₹11.7 L | L1 | Accepted-Finance Lowest Bid |
| 2 | L2₹11.9 LRejected-Finance | ₹11.9 L | L2 | Rejected-Finance Higher Bid |
| 3 | L3₹11.9 LRejected-Finance COOCH BEHAR | JALPAIGURI | WEST BENGAL | 735122 | ₹11.9 L | L3 | Rejected-Finance Higher Bid |
| Sl No | Description | Qty | Unit | m/s SHISHU KUMAR SARKAR L2 | ELECTROCRAFT L3 | GANESH ELECTRIC CO L1 |
|---|---|---|---|---|---|---|
| 1.00Maintenance of Electrical Installation of all floors/blocks of the entire premises including staircase lights, compound lighs and DG Operationt etc. for the period of 12 months Shift 1 : Semi Skilled: 02(Two) Nos & Un-skilled:03(Three) Nos For General Shift (8Hrs) with 24x365 Hours on call support. | ||||||
| 1.01 | Semi Skilled Workman: 02(Two) Men for 12 months [26(Twenty Six) Working Days per Month] | 624 | Manpower Per Day | 803 ₹5.0 L | 821 ₹5.1 L | 794 ₹5.0 L |
| 1.02 | Un-Skilled Workman: 03(Three) Men for 12 months [26(Twenty Six)Working Days per Month] | 936 | Manpower Per Day | 733 ₹6.9 L | 728 ₹6.8 L | 722 ₹6.8 L |
| 2.00Note: 1) All the above rates should be quoted inclusive of all taxes, duties and all ancilery charges. 2) Total is rounded off to the nearest rupees. 4) PF & ESI contribution documents must be provided to the concerned JE/AE, PWDte prior prepartion of the bills. | ||||||
Tender Value
₹11.8 L
EMD Value
₹23,552
Closing Date
2 Apr 2026, 12:00 pmClosed
Executive Engineer Cooch Behar Electrical Division
Sunity Road, Circuit House Campus, Cooch Behar, Pin-736101,
Annual Maintenance Contract of Electrical Installations, different electrical equipments and testing of DG Sets at different Govt. Office buildings and Residential buildings under Cooch Behar Electrical Division.
2026_WBPWD_1022894_1
WBPWD/EE/CED/eNIT-48/2025-2026
Open Tender
Support/Maintenance Service
365 days
Cooch Behar
Please refer Tender documents.
7 documents required · 7 mandatory
₹23,552
16 Apr 2026
14 Mar 2026
6 Apr 2026
14 Mar 2026
2 Apr 2026
20 Mar 2026
Maintenance of Electrical Installation of all floors/blocks of the entire premises including staircase lights, compound lighs and DG Operationt etc. for the period of 12 months Shift 1 : Semi Skilled: 02(Two) Nos & Un-skilled:03(Three) Nos For General Shift (8Hrs) with 24x365 Hours on call support.
Semi Skilled Workman: 02(Two) Men for 12 months [26(Twenty Six) Working Days per Month]
Un-Skilled Workman: 03(Three) Men for 12 months [26(Twenty Six)Working Days per Month]
Note: 1) All the above rates should be quoted inclusive of all taxes, duties and all ancilery charges. 2) Total is rounded off to the nearest rupees. 4) PF & ESI contribution documents must be provided to the concerned JE/AE, PWDte prior prepartion of the bills.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2514076.pdf
techsummary_2514076.pdf
finance_2514076.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
Tendernotice_2.pdf
PDF • 0.51 MB
Tendernotice_3.pdf
PDF • 0.70 MB
BOQ_2514076.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid