| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹69.3 LAccepted-AOC 3341 OLD S S B I BUILDING VPO SAINJ TEHSIL SAINJ DISTRICT KULLU HP 175134 | SAINJ | KULLU | HIMACHAL PRADESH | 175134 | ₹69.3 L | L-1 | Accepted-AOC As per approval of competent authority. |
| 2 | L-2₹73.2 L+₹3.8 L (5.51%)Rejected-Finance | ₹73.2 L+₹3.8 L (5.51%) | L-2 | Rejected-Finance As per approval of competent authority. |
| 3 | L-4₹79.7 L+₹10.3 L (14.9%)Rejected-Finance HOUSE NO 10 GROUND FLOOR NEAR GREEN FIELD SCHOOL MOHINI ROAD DALANWALA DEHRADUN UTTARANCHAL 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹79.7 L+₹10.3 L (14.9%) | L-4 | Rejected-Finance As per approval of competent authority. |
| 4 | L-5₹79.8 L+₹10.4 L (15.1%)Rejected-Finance H NO 80 10 GUPTA NIWAS MIA BEHAR KULLU H P 175101 | KULLU | HIMACHAL PRADESH | 175101 | ₹79.8 L+₹10.4 L (15.1%) | L-5 | Rejected-Finance As per approval of competent authority. |
| 5 | L-6₹89.7 L+₹20.4 L (29.4%)Rejected-Finance NOT FOUND | NEW DELHI | DELHI | 110001 | ₹89.7 L+₹20.4 L (29.4%) | L-6 | Rejected-Finance As per approval of competent authority. |
Tender Value
₹95.0 L
EMD Value
₹1.9 L
Closing Date
11 Feb 2026, 6:55 pmClosed
Group Senior Manager, PnC
PnC Division,Parbati Complex,Parbati-II H.E.Project, Nagwain, Distt.-Mandi, H.P.-175121
Construction of Control Room and Security Office with Ancillary Facilities at Pancha Nallah diversion site of Parbati-H.E. Project (Stage-II) (Package No-C-837)
2026_NHPC_894229_1
NH/PP-II/PnC/Pkg. No. C-837/2026
Open Tender
Civil Works - Buildings
Works
180 days
Diversion works, sheelagarh, PHEP-II, H.P.
Please refer tender document
6 documents required · 6 mandatory
₹1,180
NHPC Ltd
₹1.9 L
Yes
21 Jul 2026
21 Jan 2026
16 Feb 2026
21 Jan 2026
11 Feb 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: G.S. Sheet. | 294.12 | Sqm | 77.93 | ₹22,920.77 |
| 2 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. | 2,004.45 | Kg | 2.65 | ₹5,311.79 |
| 3 | Extra for dismantling trusses, rafters, purlins etc. of steel work for every additional span of one metre or part thereof beyond 10 metres. | 5,412.02 | Kg per meter span | 0.39 | ₹2,110.69 |
| 4 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 600 | Sqm | 4.14 | ₹2,484 |
| 5 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. Ordinary rock | - | Cum | 323.96 | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 54.77 | Cum | 7,052.54 | ₹3,86,267.62 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size). | 11.51 | Cum | 7,107.61 | ₹81,808.59 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete. | 181.37 | Sqm | 241.67 | ₹43,831.69 |
| 9 | Extra for shuttering in circular work (20% of respective centering and shuttering items) for: Foundations, footings, bases of columns, etc. for mass concrete | 1 | Sqm | 48.33 | ₹48.28 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 220.26 | Sqm | 432.53 | ₹95,269.06 |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
EtenderC837.pdf
Tender Documents • 2.80 MB
BOQ_940644.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .