Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L12₹18.7 L+₹1.8 L (10.6%)Accepted-AOC 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L12 | Accepted-AOC Accepted being lowest bonafide tenderer | |
| 2 | L1₹16.9 LRejected-AOC 262 1 NEAR MANAV CHOWK NEW GRAIN MARKET AMBALA CITY HARYANA HARYANA 134003 | AMBALA | HARYANA | 134003 | L1 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 3 | L2₹16.9 L+₹15.40 (<0.01%)Rejected-AOC 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L2 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 4 | L3₹16.9 L+₹20.75 (<0.01%)Rejected-AOC 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L3 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 5 | L4₹16.9 L+₹35.20 (<0.01%)Rejected-AOC | L4 | Rejected-AOC Non bonafide being quoted less than min fare wage |
Tender Value
₹21.3 L
EMD Value
₹43,000
Closing Date
7 Aug 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (AF) Chandigarh
GE (AF) Chandigarh PIN-160003
MANNING AND OPERATION OF ELECTRIC INSTALLATIONS FOR MAFI PROJECT AT AF STN CHANDIGARH
2020_MES_361796_1
8150/T-08/2020-2021
Open Tender
Civil Works
Item Rate
330 days
GE (AF) Chandigarh
All as per NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE (AF) Chandigarh
₹43,000
Yes
24 Sept 2020
17 Jul 2020
10 Aug 2020
17 Jul 2020
7 Aug 2020
31 Jul 2020
60 days
Amount
Operation and Maint of electric supply installation complete including operation of PS-II installation Near (11 End) daily in three shifts for 08 Hrs each shift by deploying 01 Skilled Electrician in each shift including sunday and holidays at 12 Wing (AF) Chd. The installation is comprising the following:- (i) VCB 11KV - 04 Nos (ii) Bus coupler - 11 KV - 02 Nos (iii) DG Set 160 KVA - 01 No (iv) Transformer 160 KVA - 01 No (v) Isolation transformer 160 KVA - 01 No (vi) AMF Pannel - 01 No (Vii) LT Panel 1100 volt with ACB's and MCCB's - 04 Nos (viii) GOD 11 KV - 01 Nos
Operation and Maint of electric supply installation complete including operation of PS-I installation Near (Old ATC) daily in three shifts for 08 Hrs each shift by deploying 01 Skilled Electrician including sunday and holidays at 12 Wing (AF) Chd. The installation is comprising the following:- (i) VCB 11KV - 04 Nos (ii) Bus coupler - 11 KV - 02 Nos (iii) Transformer 750 KVA - 01 Nos (iv) Isolation transformer 750 KVA - 01 Nos (vi) AMF Pannel - 01 Nos (Vii) LT Pannel 1100 volt with ACB's and MCCB's - 04 Nos (viii) GOD 11 KV - 01 No
Notes applicable for Serial item No. 1 to 2 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (i) Minor repair i.e HT fuse/ GOD operation to be done in the electric poles (The rates elements to be included ) (ii) First aid box kit with all medicine will be properly maintained by the contractor at all installations. (iii) Operator will be response area cleaning all wall and floor and main gate of the installation. (vi) Proper log sheet and shut down register shall be maintained by the contractor on prerscribed format (v) Proper uniform, label containing name plate of the operator and safety shoes as approved by Engineer-in-Charge shall be worn by operator on duty. If any operator found in improper uniform and or found without proper name plates contractor shall be liable to pay penalty at the rate of Rs 200.00 per shift of 8 hours per person. (vi) Proper facilities for sitting/ rest area shall be the responsibility of contractor. (vii) Operator on duty shall not be allowed to leave the installation without reliever. Any operator found absent from duty a recovery of Rs. 200/- per hour per installation for the period of absent will be made from the contractor (viii) Contractor shall employ only ITI qualified personnel with two year experience .Contractor shall submit documents of deployed manpower along with qualification / Experience certificate within 15 days from the date of commencement of work to GE duly verified by Engineer-in-Charge . Contractor shall be liable to pay penalty at the rate of Rs 100.00 per person per day if required qualification/Experience certificates of deployed manpower not submitted after 15 days from the date of commencement of work. (ix) Duty roaster for deployment of manpower installation wise will be prepared by the contractor and submitted to Engineer-in-Charge for verification. Compliance of payment of minimum fair wages register duly verified by Engineer-in-Charge shall be submitted before claiming any RAR. Non compliance of above said requirement will lead to non payments and the contractor shall be solely responsible for the same.
Notes applicable for Serial item No. 1 to 2 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (1) Workers wage per person (a) Skilled - 695.00 (2) Employees state insurance @ 4.00% (employer contribution 3.25% & employee contribution 0.75%) on wages as per existing rules. (3)EPF, EPS, EDLIS and administrative charges @ 13% on wages as per existing rules. (4) Bonus if applicable as per existing rules. (5) Contractor's over head and profit (6) LWC @ 1% on 1 to 5 above as per existing rules (7) GST @ 18% on 1 to 5 above as per existing rules.
Notes applicable for Serial item No. 1 to 2 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (1) The Rate quoted shall not be less than minimum wages as notified by Government of India/State Government / Local body whichever is higher incl all statutory provisions such as EPF, ESIC, Bonus, taxes etc as applicable. (2) The Firms 's claims in bills regarding ESI, EPF, Services Tax should be accompanied by documentary proof pertaining to the previous months bill. Arequisite portion of the bill i.e RAR/Final Bill amount shall be held up till such proof is furnished at the discretion of the GE. (3) The firm shall submit proof of payment given to workers and endorse a copy to Engineer-in-Charge, showing the details of payments, deductions (incl all statutory deductions) and net amount with requisite challans in each case/person indicating PF number, ESI card detail etc. (4) Engineer-in Charge will maintain the record of attendance in respect ofthe persons deployed by the firm on the basis of which wages / remuneration will be decided in repect of the persons at the approved and agreed rates. The firm shall be responsibele to keep all records of payment, attendance, leaves etc. duly signed by the Engineer in Charge and endorse a copy of all the documents with RAR/Final Bill as applicable. (5) In compliance of Govt of India Gazette Notification dated 15 Feb 2017 & MoD EPFO even letter No. CA10/011 (33) 2015/HQ/Vol-II dated 02 Feb 207, It is an express condition of the contract that:- (i) The contractor has to make the payment of minimum wages of employees of labours directly into AADHAR LINKED BANK ACCOUNT of individual only and proof of payment of wages through Aadhar linked bank account of contractor has to be submitted alongwith payments viz RARs & or Final Bill.
R D Bansal
M/s badrinath Traders
POWER ELECTRONICS ENGINEERS
Raman Electric Trading Co
P.K.MALL ENTERIPRSES
PARTAP ENGINEERING WORKS
ELECTROMAX OF INDIA
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
M/S BALWINDER SINGH
G M CONSTRUCTION COMPANY
Bal Singh and Sons
DIAMOND ELECTRICALS
SANJEEV ENTERPRISES
M/S Trilok chand sharma
M/S J N TRADERS
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .