Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.9 LAdmitted-Finance AT DEBIANA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | -3.91% | ₹17.9 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical AT MOHUL BAGAN COLONY RAJPURA P O KUMARDHUBI DIST DHANBAD 828203 | DHANBAD | JHARKHAND | 828203 | - | - | - | Rejected-Technical As per TC recommendation. |
| 3 | Rejected-Technical AT 246 NIRSA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | - | - | - | Rejected-Technical As per TC recommendation. |
Tender Value
₹18.6 L
EMD Value
₹23,300
Closing Date
6 Apr 2026, 5:00 pmClosed
AE (Civil)
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Construction of Coal Transporting FRC road approaches 10 no. quarry weighbridge at Chapapur Colliery under CB Group of Mines.
2026_ECL_357505_1
ECL/GM/MA/CE/25-26/eTender/242 Dt. 25.03.2026
Open Tender
Civil Works - Roads
60 days
chapapur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹23,300
8 May 2026
26 Mar 2026
7 Apr 2026
26 Mar 2026
6 Apr 2026
27 Mar 2026
27 Mar 2026 - 3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0Based on analysis | |||||
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 mAll kinds of soil. | 24 | cum | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 1.62 | cum | - | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 15.62 | cum | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form forWalls any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 10.8 | sqm | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete. | 62 | sqm | - | - |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 781 | kg | - | - |
| 7 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 412.95 | kg | - | - |
| 8 | Supplying and stacking at site.63 mm to 45 mm size stone aggregate | 81 | cum | - | - |
| 9 | Laying, spreading and compacting stone aggregate of specified sizesto WBM specifications in uniform thickness, hand picking, rollingwith 3 wheeled road/vibratory roller 8-10 tonne capacity in stages toproper grade and camber, applying and brooming requisite type ofscreening / binding material to fill up interstices of coarse aggregate,watering and compacting to the required density . | 81 | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_370365.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid