| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L-1 | Accepted-AOC Being L-1 Bidder Awarded value is exclusive of GST, GST will be payable separately as per rules And Applicable Items |
| 2 | L-2₹1.3 Cr+₹4.7 L (3.94%)Rejected-AOC NILKANT COLONY TRILOK NAGAR HALDWANI NAINITAL UTTARAKHAND 263139 | HALDWANI | NAINITAL | UTTARAKHAND | 263139 | ₹1.3 Cr+₹4.7 L (3.94%) | L-2 | Rejected-AOC Bidder Quoted rate is high |
| 3 | L-3₹1.3 Cr+₹10.7 L (8.86%)Rejected-AOC | ₹1.3 Cr+₹10.7 L (8.86%) | L-3 | Rejected-AOC Bidder Quoted rate is high |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
22 Jul 2021, 3:00 pmClosed
S E RWD Circle Nainital
S E RWD Circle Nainital
Under the block Okhalkanda camp office of Arya Bhatt Observation Institute Nainital in Jadapani repair of the paved road constructed by the institute construction of CC road
2021_RES_34258_1
453/RWD/2-Lekha/2021-22/ Dated 06-07-2021
Open Tender
Civil Works - Roads
Item Rate
180 days
Okhalkanda Jadapaani
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer RWD Nainital
₹2.6 L
12 Feb 2023
7 Jul 2021
23 Jul 2021
7 Jul 2021
22 Jul 2021
7 Jul 2021
Amount
Dismantling of Cement Concrete avements as per Technical Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 Cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of cavated earth, lead upto 50m and lift upto 1.5m,disposed earth to be levelled and neatly dressed.
Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:2:4 (Nominal Milx)
Gravel/Soil-Aggregate Surface Course (Table 400.3) Construction of granular surface course by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and ompacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical Specification Clause 402
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 Cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needl , screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Supplying, fitting, and placing MS bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc.
providing and mixing hardening compound of approved quality as per manufacturer’s specification in cement concrete.
M/S PRINCE CONSTRUCTION
Puran Singh Bora
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .