Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 CrAccepted-AOC | ₹4.7 Cr Quoted ₹4.0 Cr | L-1 | Accepted-AOC AOC |
| 2 | L-2₹4.0 Cr+₹74,252.22 (0.19%)Rejected-Finance | ₹4.0 Cr+₹74,252.22 (0.19%) | L-2 | Rejected-Finance PRICE QUOTED HIGH |
| 3 | Rejected-Technical BHALLA FARM NO 8 SHYAMPUR RISHIKESH DEHRADUN UTTARAKHAND | DEHRADUN | UTTARAKHAND | 248001 | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | Parag Jain L2 | M/s SHREE BALA JI INFRATECH L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 990 | Cum | 53 ₹52,470 | 52 ₹51,480 Lowest |
| 2.00 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | 2,310 | Cum | 477 ₹11,01,870 | 476 ₹10,99,560 Lowest |
| 3.00 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | 8,299.17 | No. | 15 ₹1,24,487.55 Lowest | 15 ₹1,24,487.55 Lowest |
| 4.00 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | 7,100.3 | Cum | 40 ₹2,84,012 Lowest | 40 ₹2,84,012 Lowest |
| 5.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, Bushes, Shrubs, Saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 2,600 | Sqm | 7 ₹18,200 Lowest | 7 ₹18,200 Lowest |
| 6.00 | Dewatering of water caused due to seepage of ground water and surface water due to rain etc. excluding excavation of foundation but during execution of civil works including supply of all machine operator, khalashi, POL, T&P, accessories required for proper completion of the work. | 6,400 | HP hr | 52 ₹3,32,800 Lowest | 52 ₹3,32,800 Lowest |
| 7.00 | Providing concrete for plain/Reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix _1:2:4) | 2,796.82 | Cum | 6,246 ₹1,74,68,937.72 | 6,234 ₹1,74,35,375.88 Lowest |
| 8.00 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (R.C.C. grade M 20) | 762.57 | Cum | 6,835 ₹52,12,165.95 | 6,822 ₹52,02,252.54 Lowest |
| 9.00 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS1786:2008 clause no. 1.6) | 59.27 | Ton | 64,857 ₹38,44,074.39 | 64,728 ₹38,36,428.56 Lowest |
| 10.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 130 | Cum | 1,009 ₹1,31,170 | 1,008 ₹1,31,040 Lowest |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
25 Apr 2026, 4:00 pmClosed
SE IWC HARIDWAR
SE IWC HARIDWAR
Construction of Ghat on Escape Channel in Bairagi Camp area in Bahadarabad block of district Haridwar under Kumbh Mela - 2027 (Shri Yantra Pul)
2026_IRDCE_94149_6
03/SE/2026-27 DATED 10-04-2026
Open Tender
Civil Works
Item Rate
270 days
DISTRICT HARIDWAR
AS PER SBD
2 documents required · 2 mandatory
₹5,900
EE I(R) DIVISION NEW TEHRI HQ BAHADRARBAD
₹7.9 L
SE IWC HARIDWAR
11 Jun 2026
11 Apr 2026
25 Apr 2026
11 Apr 2026
25 Apr 2026
15 Apr 2026
15 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | - | Cum | - | - |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 | - | Cum | - | - |
| 3 | Providing and laying of Empty Cement Bags ( Gunny Bags) filled with local sand and tightened using sutli and carriage upto site including preparing subgrade before placing in position, also including supply of all material, labour, T&P etc required for proper completion of the work. | - | No. | - | - |
| 4 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 | - | Cum | - | - |
| 5 | Clearing and grubbing road land including uprooting wild vegetation, grass, Bushes, Shrubs, Saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | - | Sqm | - | - |
| 6 | Dewatering of water caused due to seepage of ground water and surface water due to rain etc. excluding excavation of foundation but during execution of civil works including supply of all machine operator, khalashi, POL, T&P, accessories required for proper completion of the work. | - | HP hr | - | - |
| 7 | Providing concrete for plain/Reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix _1:2:4) | - | Cum | - | - |
| 8 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 (R.C.C. grade M 20) | - | Cum | - | - |
| 9 | Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructruecomplete as per drawings and technical specification Clauses 1002, 1005, 1010 &1202(The reinforcement steel shall be procured from original (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS1786:2008 clause no. 1.6) | - | Ton | - | - |
| 10 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
SBD_BAIRAGI_CAMP.pdf
Tender Documents • 0.63 MB
BOQ_111421.xls
BOQ • 0.30 MB
DATE_EXT_KUMBH_3.pdf
PDF • 0.32 MB
03_SE_KUMBH.pdf
PDF • 0.02 MB
CORR_03_SE_TENDER.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .