Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LQualified | ₹1.5 L | L1 | Qualified |
| 2 | L2₹1.9 L+₹35,375 (23.6%)Qualified GROUND FLOOR JN ROAD HADDO SOUTH ANDAMAN ANDAMAN NICOBAR 744102 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744102 | ₹1.9 L+₹35,375 (23.6%) | L2 | Qualified MSE, Category: General |
| 3 | L3₹1.9 L+₹40,375 (27.0%)Qualified BLAIR SOUTH ANDAMAN ANDAMAN NICOBAR 744103 INDIA UDYAM AN 01 0000436 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744103 | ₹1.9 L+₹40,375 (27.0%) | L3 | Qualified MSE, Category: General |
| 4 | L4₹2.2 L+₹69,875 (46.7%)Qualified | ₹2.2 L+₹69,875 (46.7%) | L4 | Qualified |
| 5 | L5₹4.7 L+₹3.2 L (216.1%)Qualified | ₹4.7 L+₹3.2 L (216.1%) | L5 | Qualified |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
17 Jun 2026, 11:00 amClosed
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E016 Both Main sea chest strainers deteriorated and broken Upper collar and lifting handle also up rooted Sea chest strainer to be fabricated alongwith upper..
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-146; E19 Fabrication of 07 nos boxes for stowage of D787 spares Boxes to be fabricated as per sample Mat SS Size 03 x 02 x 02 feet; Service Provider
and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-146; E20 Both Sea chest strainers corroded and thinned down resulting in excess accumulation of sea weeds Deteriorated strainers cause insufficient sea water suct..
9448146
GEM/2026/B/7646376
Two Packet Bid
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-423; E016 B
South Andamans, Andaman And Nicobar Islands
Total value wise evaluation
SERVICE
4 documents required · 4 mandatory
1 yrs
₹1 L
| Item | Delivery Location | Qty | Delivery |
|---|---|---|---|
| Repair | - | - | - |
| Maintenance | - | - | - |
| and Installation of Plant Systems/Equipments (Version 2) - ICGS C-423; E016 Both Main sea chest strainers deteriorated and broken Upper collar and lifting handle also up rooted Sea chest strainer to be fabricated alongwith upper.. | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-146; E19 Fabrication of 07 nos boxes for stowage of D787 spares Boxes to be fabricated as per sample Mat SS Size 03 x 02 x 02 feet; Service Provider | - | - | - |
| and Installation of Plant/Systems/Equipments (Version 2) - ICGS C-146; E20 Both Sea chest strainers corroded and thinned down resulting in excess accumulation of sea weeds Deteriorated strainers cause insufficient sea water suct.. | - | - | - |
Exempted
Yes
17 Jun 2026
11 Jun 2026
17 Jun 2026
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9448146.pdf
GEM_BID • 0.11 MB
1781077079.pdf
GEM_OTHER • 0.01 MB
1781077089.pdf
GEM_OTHER • 0.88 MB
SOW_0e6b1611-aa39-4c9e-be091781077178945_DTO14.pdf
GEM_OTHER • 0.01 MB
ATC_c344b290-8c52-405a-87561781077223734_DTO14.pdf
GEM_OTHER • 0.88 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .