| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 Cr+₹7.3 L (4.55%)Rejected-Finance | ₹1.7 Cr+₹7.3 L (4.55%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | KUMARADAS N L2 | PRADEEP B L1 |
|---|---|---|---|---|---|
| 1.00Laying Sewer Line | |||||
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 24.3 | cum | 2,958.79 ₹71,898.6 | 2,830.15 ₹68,772.65 Lowest |
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 97.16 | cum | 512.89 ₹49,832.39 | 490.59 ₹47,665.72 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 1,131.34 | cum | 797.25 ₹9,01,960.82 | 762.59 ₹8,62,748.57 Lowest |
| 1.00 | 100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 848.24 | cum | 951.27 ₹8,06,905.26 | 909.91 ₹7,71,822.06 Lowest |
| 1.00 | 100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 384.39 | cum | 1,105.29 ₹4,24,862.42 | 1,057.23 ₹4,06,388.64 Lowest |
| 1.01 | 100.1.4:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 4.5m but not exceeding 6m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 641.65 | cum | 1,259.31 ₹8,08,036.26 | 1,204.56 ₹7,72,905.92 Lowest |
| 1.01 | OD301007/2023-2024:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 6m in depth but not exceeding 7.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 6m to 7.5m<br>All kinds of soil.<br>(Ref. Item No. 2.12 of DSR) | 24.09 | cum | 1,413.34 ₹34,047.36 | 1,351.89 ₹32,567.03 Lowest |
| 1.01 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 819 | metre | 37.65 ₹30,835.35 | 36.01 ₹29,492.19 Lowest |
| 1.01 | 100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete. | 1,412.18 | sqm | 1,052.02 ₹14,85,641.6 | 1,006.28 ₹14,21,048.49 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
25 Jun 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Public Health Circle Kerala Water Authority Thiruvananthapuram
AMRUT AMRUT 2 Providing and laying 200mm SW sewer line atVinayakanagar towards Arappuraarea Sewerage Work
2025_KWA_768809_1
08/2025-26/KWA/PHC/D4/TVM
Open Tender
Civil Works - Water Works
Item Rate
300 days
Vattyoorkavu
Pls refer NIT
7 documents required · 7 mandatory
₹6,508
₹50,000
Yes
6 Aug 2025
11 Jun 2025
26 Jun 2025
11 Jun 2025
25 Jun 2025
11 Jun 2025
11 Jun 2025 - 25 Jun 2025
Amount
Laying Sewer Line
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.2:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.3:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 3m but not exceeding 4.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.4:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 4.5m but not exceeding 6m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
OD301007/2023-2024:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 6m in depth but not exceeding 7.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 6m to 7.5m<br>All kinds of soil.<br>(Ref. Item No. 2.12 of DSR)
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.
100.43.3:Conveying, laying and jointing glazed stoneware pipes class SP-1 with stiff mixture of cement mortar in the proportion of 1:1 (1 cement : 1 fine sand) including testing of joints etc., complete (excluding cost of pipes): 200mm diameter pipe.
100.98.98:Supply of SW Pipe 200mm, 0.6m long.
100.4.1:Excavating in hard rock for trenches by blasting for laying pipes and stacking useful materials for measurements and disposing unserviceable materials within the initial lead of 50m and lift up to 1.50m (depth from 0.0m to 1.50m) and providing protection by earth filled cement bags during blasting to avoid damages to nearby structures (200 Nos. of earth filled cement bags for 10m3 of blasting)
2.16.1:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5m
2.16.2:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
2.16.3:Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.5 m
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Construction of Manholes
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD300890/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 2nd depth of 1.50m to 3.0m in all kinds of soil.
OD300891/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 3rd depth of 3.00m to 4.50m
OD300997/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 4th depth of 4.50m to 6.00m in all kinds of soil.
OD301010/2023-2024:Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m for 5th depth of 6.00m to 7.50m in all kinds of soil.
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
100.6.1:Providing steel sheet shoring to the sides of the trenches to depths of above 4.00 m but not exceeding 6.00m using 6 mm M.S. sheet 0.50 M wide stiffen on edges with 50 mm x 50mm x 6 mm M.S. angles driving down vertically on either side one after another in lines and levels with suitable pile driving equipments and accessories to a maximum depth of 0.50 M below the bottom of the proposed excavation 0.5 M above ground level suitably braced by horizontal walling pieces at 75 x 150 mm x 8 mm angles on either side at intervals not exceeding 1.50M and horizontal screw jack type struts at 1.50M intervals and maintaining the shoring till the pipes are laid and works are completed, dismantling, cleaning and restacking for reuse including all labour, hire charges and conveyance for equipments, tools and plants and sundries etc. complete.
2.17.1:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth not exceeding 1.5 m
2.17.2:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
2.17.3:Close timbering in case of shafts, wells, cesspits, manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete (Measurements to be taken of the face area timbered).Depth exceeding 3 m but not exceeding 4.5 m
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
OD300893/2023-2024:Centering and shuttering including strutting propping etc and removal for Cover slab (circular)
OD300894/2023-2024:Centering and shuttering including strutting, propping etc and removal of form etc for Well steining - circular work
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.7:Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
19.21.1:Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix( 1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 ( 1 cement: 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete.For pipes 100 to 250 mm diameter
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
13.9.2:Cement plaster 1:3 ( 1 cement : 3 coarse sand) finished with a floating coat of neat cement.20 mm cement plaster
19.16:Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS: 10910 on 12 mm dia steeel bar conforming to IS:1786, having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufactures permanent identification mark to be visible even after fixing including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 ( 1cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) Complete as per design
OD13867/2025-2026:Supplying C.I man hole cover with frame for manholes:560 mm diameter ( heavy duty) the weight to be not less than 208 kg.
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD14012/2025-2026:convey and fixing C.I man hole cover with frame for manholes:560 mm diameter ( heavy duty) the weight to be not less than 208 kg.
General Items
100.7.1:Bailing out water with 5HP engine and pump set including conveyance to the site, erecting, dismantling and taking back of engine and pump, cost of fuel lubricating oil and other stores pay of staff etc., complete.
100.98.1008:Engaging Coolie.
100.98.1035:Engaging sewer man.
OD300899/2023-2024:Providing protection work to the electric post by using 3 nos of Kattadi poles and removing the same after the completion of work .
100.52.S.1:Sub Data for providing Earth filled cement bags including cutting of the Earth, filling, conveying and placing in position.
100.52.S.5:Sub Data for Dismantling the sand / earth filled cement bag from the foundation site of bund, apron on both sides, counter wall and removing the sand/earth from the bag and disposing the damaged cement bags properly as per the direction of the department officers including all cost of labour charges etc complete.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.5:Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
7.2.1:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 )1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
OD300900/2023-2024:Plugging the full portion of the mouth of 100mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.
50.6.1.6:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level thickness 20cm and above in : CM 1:6 ( 1 cement : 6 coarse sand sand) etc complete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
OD300901/2023-2024:Plugging the full portion of the mouth of 225 to 300mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete.
OD300902/2023-2024:Plugging the full portion of the mouth of 150mm to 200mm dia sewer main using clay filled gunny bags and removing the same after completion of work etc complete
100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation.
100.98.214:Supply of PVC Pipe, 6kg/cm2, 110mm Dia.
100.9.9:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 110 mm nominal outside diameter pipes.
OD21849/2024-2025:Top quality Ready made Inspection Chambers
KUMARADAS N (BID ID -2231195)
Bidder Name
KUMARADAS N
PRADEEP B
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1253889.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .