Loading…
Loading…
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
4 Jul 2026, 5:00 pm
AGE INDEP AF BHOWALI
AGE INDEP AF BHOWALI
REPAIR AND MAINTENANCE OF STREET LIGHT, FLOOD LIGHT, HIGH MAST LIGHT AND CONNECTED WORKS AT ADM SITE AND LKT AT AF STATION BHOWALI
2026_MES_772223_1
8001
Open Tender
Electrical and Maintenance Works
180 days
AIRFORCE STATION BHOWALI
As per Tender Documents
8 documents required · 8 mandatory
₹500
AGE INDEP AF BHOWALI
₹16,000
Yes
15 Jun 2026
15 Jun 2026
7 Jul 2026
15 Jun 2026
4 Jul 2026
29 Jun 2026
15 Jun 2026 - 4 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to LED street light /of any make / type and capacity by replacing unserviceable parts including replacement of wornout connecting wires as per existing size of conductor and taking down fittings from the pole and refixing in position and testing complete as required and as directed by the Engr-in-Charge.
Note :-(i) Unserviceable parts required to be replaced with new one shall be measured and paid separately as "Supply only" against respective items of this Schedule.
(ii) Cost of replacement of worn out wire of the fittings and connections as per existing size of conductor of the each fittings is deemed to be included in unit rate quoted. | 50 | Each | - | - |
| 2Supply only following items to incorporate against item No. 1 above:- | |||||
| 2.01 | (a) Driver for LED 30 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 5 | Each | - | - |
| 2.02 | (b) Driver for LED 45 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 5 | Each | - | - |
| 2.03 | (c) Driver for LED 60 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 5 | Each | - | - |
| 2.04 | (d) Driver for LED 90 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 5 | Each | - | - |
| 2.05 | (e) Driver for LED 180 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 3 | Each | - | - |
| 2.06 | (f) Surge protector for LED 25 to 90 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 5 | Each | - | - |
| 2.07 | (g) Surge protector for LED 100 to 200 watt complete. (Make-Bajaj/Havell's/ Crompton ) | 3 | Each | - | - |
| 3 | Repairs to LED Integrated Solar light of any make and capacity12 watt to 24 watt by replacing unserviceable parts including replacement of wornout control wires as per existing size of conductor and taking down fittings from the pole and refixing in position and testing complete as required and as directed by the Engr-in-Charge.
Note :-(i) Unserviceable parts required to be replaced with new one shall be measured and paid separately as "Supply only" against respective items of this Schedule.
(ii) Cost of replacement of worn out wire of the fittings and connections with new one as per existing size of conductor of the each fitting by soldering is deemed to be included in unit rate quoted. | 4 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
tender8001.pdf
Tender Documents • 0.71 MB
BOQ_864696.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid