Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAccepted-Finance | ₹4.6 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹5.0 LAccepted-Finance MARUTHADIKALAM KOOMANKADU THATHAMANGALAM PALAKKAD | PALAKKAD | KERALA | 678001 | ₹5.0 L | L2 | Accepted-Finance Accepted |
| 3 | L3₹5.5 LAccepted-Finance | ₹5.5 L | L3 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | M.K.SARVADHAMANAN L2 | BIJU. K L3 | SURESH M L1 |
|---|---|---|---|---|---|---|
| 1.00Culvert Construction | ||||||
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 99 | sqm | 8.39 ₹830.61 | 9.19 ₹909.81 | 7.77 ₹769.23 |
| 1.00 | 15.47.1:Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-Charge:Upto 150 mm diameter | 3 | metre | 310.71 ₹932.13 | 340.24 ₹1,020.72 | 287.68 ₹863.04 |
| 1.00 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil | 20.3 | sqm | 121.44 ₹2,465.23 | 132.98 ₹2,699.49 | 112.44 ₹2,282.53 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.9 | cum | 7,179.27 ₹27,999.15 | 7,861.49 ₹30,659.81 | 6,646.97 ₹25,923.18 |
| 1.00 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 82.4 | sqm | 349.47 ₹28,796.33 | 382.68 ₹31,532.83 | 323.56 ₹26,661.34 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 9 | cum | 7,755.07 ₹69,795.63 | 8,492.02 ₹76,428.18 | 7,180.08 ₹64,620.72 |
| 1.01 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 3.27 | cum | 8,201.71 ₹26,803.19 | 8,981.1 ₹29,350.23 | 7,593.6 ₹24,815.88 |
| 1.01 | 5.22.4:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHot rolled deformed bars | 1,118.56 | kilogram | 101.75 ₹1.1 L | 111.42 ₹1.2 L | 94.21 ₹1.1 L |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 15.94 | sqm | 869.92 ₹13,866.52 | 952.59 ₹15,184.28 | 805.42 ₹12,838.39 |
Tender Value
₹5.5 L
EMD Value
₹13,762
Closing Date
6 Feb 2026, 5:00 pmClosed
Executive Engineer
Irrigation Division Chittur
Clearing Grass Demolishing CC Earth Work Exacavation CC 1_4_8 CC 1_3_6 CC 1_2 _4 CC 1_1 5_3 Centering and shuttering Platering etc
2025_Irrig_816334_3
IRR/PI/TR/6521/2025_5_1_1/1
Open Tender
Civil Works - Canal
330 days
Okarakode Unnathi (SC) Ward 10 in Thenkurissi GP
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,215
₹13,762
Yes
16 Feb 2026
29 Jan 2026
9 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
30 Jan 2026 - 2 Feb 2026
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1397924.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid