EXECUTIVE ENGINEER PHE DIVISION SOPORE
EXECUTIVE ENGINEER PHE DIVISION SOPORE
Composite tender for Retrofitting of W.S.Scheme GulshanporaMarkandal for Providing 100 Percent FHTC to village Gulshanpora under JJM by way of providing laying and fitting of pipes and construction of sluice chambers
2021_PHE_122794_3
ENIT06/PHE/SPR/04/2021
Open Tender
Civil Works
Item Wise
30 days
SOPORE
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,900
Yes
EXECUTIVE ENGINEER PHE DIVISION SOPORE
Exempted
6 May 2021
22 Apr 2021
5 May 2021
23 Apr 2021
4 May 2021
23 Apr 2021
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc not exceeding 1.5mtr in width and for shafts wells, cesspits and the like not exceeding 10 Sqm on plan, depth upto 1.5mtr. All kinds of soil
Providing and fixing of G.I pipes complete with G.I fittings excluding trenching and refilling etc (external work) 15mm dia nominal bore
Providing and fixing of G.I pipes complete with G.I fittings excluding trenching and refilling etc (external work) 20mm dia nominal bore
Providing and fixing of G.I pipes complete with G.I fittings excluding trenching and refilling etc (external work) 25mm dia nominal bore
Providing and fixing of G.I pipes complete with G.I fittings excluding trenching and refilling etc (external work) 50mm dia nominal bore
Providing and fixing of G.I pipes complete with G.I fittings excluding trenching and refilling etc (external work) 65mm dia nominal bore
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m
Earth work in excavation by manual means over areas (exceeding 30cm and up[to 1.5mtr in depth, 1.5mtr in width as well as 10 sqm on plan) including disposal of excavated earth upto 1mtr from cutting edge disposal earth to be levelled and neatly dressed . All kinds of soil
Providing and laying of dry stone soling on horizontal on level including cost of stones
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1 : 4 : 8 (1 cement : 4 fine sand : 8 graded stone aggregate 40mm nominal size) crushed.
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement. All work upto plinth level. 1 : 2 : 4 (1 cement ; 2 coarse sand : 4 graded stone agg. 20mm nominal size).
Centering and shuttering including straightening propping etc, and removal of form work for: Foundations, footing, bases of columns etc for mass concrete
Centering and shuttering including straightening propping etc, and removal of form work for: Walls (any thickness) including attached pilasters, buttresses, plinth and string courses
Centering and shuttering including straightening propping etc, and removal of form work for: Suspended floors, roofs, landings, balconies and access plate form
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete (T.M.T bars)
Carriage of materials by Mechanical transport from source to actual site of work including loading, unloading and stacking of material: Cement/steel from Divisional store for avg. lead 25 kms
Carriage of materials by Mechanical transport from source to actual site of work including loading, unloading and stacking of material: Stone soling for avg. lead 25 kms
Carriage of materials by Mechanical transport from source to actual site of work including loading, unloading and stacking of material: Stone agg. (40mm) for avg. lead 25 kms
Carriage of materials by Mechanical transport from source to actual site of work including loading, unloading and stacking of material: Stone agg. (20mm) for avg. lead 25 kms
Carriage of materials by Mechanical transport from source to actual site of work including loading, unloading and stacking of material: Sand for avg. lead 25 kms
GHULAM NABI RATHER
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .