Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
9 Jun 2026, 3:00 pm4d left
Ranjeet Kumar
Municipal Commissioner, Chapra Nagar Nigam
Chapra Municipal Corporation, Municipal Chowk, Chapra (Saran) 841301
Ranjeet Kumar
Municipal Commissioner, Chapra Nagar Nigam
Construction of Animal Birth Control centre (ABC) & Dog Shelter along with Boundary wall, internal drain work,sanitation and electric fittings near Railway Dhalla no-44, Huse Chapra,Saran.
132176
NIT NO-06/2026-27/GR01
Open Tender
CIVIL
Saran
• NAME OF THE BIDDER
• ADDRESS, CONTACT NO AND EMAIL OF THE BIDDER
• DEPARTMENTAL REGISTRATION NO
• PAN NUMBER
• GST NUMBER
• CHARATER CERTIFICATE
(ATTACH OR NOT)
• ITR AND TURNOVER LAST THREE YEARS
• EMD COPY
• EXPERIENCE
• TOOLS AND PLANTS
• AFFIDAVIT
CIVIL
PERCENTAGE
L1
1
12 documents required · 12 mandatory
₹10,000
Processing Fee: 3540
₹4.0 L
OFFICE OF CHHAPRA NAGAR NIGAM, CHHAPRA
3 Jun 2026
3 Jun 2026
10 Jun 2026
4 Jun 2026
9 Jun 2026
4 Jun 2026
5 Jun 2026
MUZAFFARPUR MUNICIPAL CORPORATION MUZAFFARPUR
CIVIL WORKS ESTIMATE FOR DOG SHELTER SHED
URBAN DEVELOPMENT AND HOUSING DEPARTMENT, GOVT OF BIHAR
Sl. No. SOR No. Item Unit Qty. Rate Total
2 BCD 15.2.1 Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix m3 0 970.9 0.0
No L W D Quantity Unit
2 BCD 15.2.1 Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix m3 0 970.9 0.0
No L W D Quantity Unit
1 BCD 2.29.1 Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m All kinds of soil. /100sqm 4.049 1355.40 5488.20
No L W D Quantity Unit
complete area 1 20.98 19.3 404.9 sqm
Total Surface Dressing 4.049
2 BCD 2.2.1 Earthwork in rough excavation , banking excavated earth in layer not exceeding20cmindepth,breakingclodswatering, rollingeachlayerwith 1/2tonnerollerorwoodenorsteel rammersandrollingevery3rdandtop most layer with power roller of minimum8 tonnes and dressing up in embankments for roads, floodbanks ,marginal banksandguidebanksor filling up ground depressions. lead upto 50 m and lift upto 1.5 m. All Kinds of soil cu.mt 17.87 386.60 6908.12
No L W D Quantity Unit
Below ground level of slab(long wall) 7 12.0396 0.25 0.25 5.26733 cu.mt
(Short wall) 15 3.9116 0.25 0.25 3.67 cu.mt
Below longer plinth beam 7 12.0396 0.25 0.25 5.27 cu.mt
Below shorter plinth beam 15 3.9116 0.25 0.25 3.67 cu.mt
Total Excavation 17.87
3 BCD 20.3A.1 Making25cm(10")dia bore up to 4 mtr depth below ground with hand auger of approved quality in ordinarysoi! (vide classification of soil item A )true to plum bandwithout eccentri city in any stage of operation and disposal of the excavated earth up to 50 mtr ,Leadin eludingalllifts,allcompleteasperapproveddisignand directionofE/lDetailsofcostfor4pilesof4m=16mtrs depth ) mtr 69.00 178.30 12302.70
No L W D Quantity Unit
3 BCD 11.72 Providing desinition 100A brick flate soling. m3 0.000 283.30 0.0
No L W D Quantity Unit
4 BCD 2.3.1 Banking excavated earth in layers not exceeding 20cm in depth,breaking clods,watering.rolling each layer with1/2 tonne roller, or woodenor steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up ; in embankments for roads, flood banks,marginal banks,and guid ebanks etc. lead upto 50m and lift upto 1.5 m. All Kinds of soil cu.mt 242.95 224.00 54420.44
No L W D Quantity Unit
raising from ground 2 fr 1 20.98 19.30 0.60 242.95 cu.mt
5 BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. cum 44.27 287.30 12718.91
No L W D Quantity Unit
below beam and each block4 consecutive one) 1 16.9 12 0.1 20.28 cum
1 seprate one 1 4.7 12.000 0.1 5.64 cum
paver block area 1 4.30 18.90 0.15 12.19 cum
Total 44.27 cum
6 BCD 11.72 Providingdesignation100Aonebrick flatsolingjointsfilledwithlocal sand including cost of watering, taxes, royaltyall complete as per building specification and direction of E/l, sqm 259.20 283.30 73431.36
Description No L W D Quantity Unit
equal area as local sand 1 16.9 12 202.8 sqm
Total 259.2 sqm
7 BCD 4.1.2 Providingand layinginpositioncement concreteof specifiedgrade exluding the cost of centring and shuttering-all work upto plinth level.1:1.5:3 (1Cement :1.5coarse sand:3 graded stone aggregate 20mm nominal size) m3 22.54 4420.80 99649.92
Description No L W D Quantity Unit
8 BCD 5.33A.2.2 Providing and laying in position machine batched,machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding thecost ofcentring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete Beams, planth beams,girders, bressumers, contilevers, Suspended floors lintels roofs and staircases including spiral staircases, shelves etc. cum 21.28 5677.20 120798.27
Description No L W D Quantity Unit
(10'' dia pile) piling 23 3.00 0.786 0.06 3.25 cu.mt
Below ground level of slab(long wall) 7 12.40 0.25 0.25 5.43 cu.mt
short wall 15 3.91 0.25 0.25 3.67 cu.mt
plinth beam(long wall) add 6'' at walltop 7 12.04 0.25 0.25 5.27 cu.mt
short wall (addn 6"at walltop)1 15 3.91 0.25 0.25 3.67 cu.mt
Total RCC in Footing and beams 21.28 cu.mt
9 BCD 5.33A.2.1 Providing and laying in position machine batched,machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding thecost ofcentring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete Beams, planth beams,girders, bressumers, contilevers, Suspended floors lintels roofs and staircases including spiral staircases, shelves etc. cum 3.49 5293.50 18490.86
No L W D Quantity Unit
A Columns-Below Ground Lavel 23 0.25 0.25 0.6 0.86 cum
A Columns-Above Ground Lavel 23 0.25 0.25 1.83 2.63 cum
Total RCC in Columns 3.49 cum
10 BCD 5.11.7C Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding upto floor level including cost of binding wire, wastage and over laps upto 12mm horizontal/ inclined position of reinforcement bars in slab and beams, plinth, chajjas, lintels, upto 4.5m vertical length of reinforcement in wall columns (over laps shall be provided as per requirement of IS : 13920; IS 456 & SP :34) etc. complete.Thermo-Mechanically Treated bars. (Fe 500 D ormore) kg 2229.38 90.80 202427.92
No L W D Quantity Unit
Thermo-Mechanically Treated bars. (Fe 500D or more) for pile and beam Upto Plinth Level Assuming steel@90 kg per 21.28 90 1915.00 kg
In Columns Assuming steel @90 kg per cubiccubic meter 3.49 90 314.38 kg
Total Reinforcements in RCC 2229.38 kg
11 BCD 5.9.5 Centring and shuttering including strutting,propping etc. and removal of form for.Lintels, beams, plinth bams, griders, bressumers and contilevers. sqmt 142.95 404.70 57851.87
Description No L W D Quantity Unit
Total 142.95 sqmt
12 BCD 5.9.6 Centring and shuttering including strutting, propping etc. and removal of form for. Columns,Pillars, Piers, Abutments, Posts and Struts sqmt 44.73 494.40 22114.51
Description No L W D Quantity Unit
Total 44.73 sqmt
13 BCD 6.1.14A Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand ) cum 20.65 4819.90 99540.57
Description No L W D Quantity Unit
Below Longer plinth beam 7 12.04 0.250 0.600 12.642 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.000 cum
Below Shorter plinth beam 15 3.91 0.250 0.600 8.798 cum
deduction for column 21 0.25 0.250 0.600 0.788 cum
Total 20.65 cum
14 BCD 6.1.12/1 Brick work with bricks of class designation 100Ain foundations and plinth in : Cement mortar 1 .:4 (1 cement: 4 coarse sand ) cum 73.17 5017.90 367172.54
Description No L W D Quantity Unit
Longer wall 7 12.04 0.250 1.830 38.558 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.000 cum
Shorter wall 10 3.91 0.250 1.830 17.888 cum
Thin wall for seprator for kennel(14 each) 98 1.04 0.125 1.830 23.314 cum
deduction for column 21 0.25 0.250 1.830 2.402 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.000 cum
deduction for opening in front side 5 1.83 0.250 1.830 4.186 cum
Total 73.17 cum
14 BCD 6.3A Brickworkwithbricksof classdesignation100Ain foundationsand plinth in : ExtraforBrickwork insuperstructureaboveplinth level uptofloorV cum cum 73.17 842.20 61625.92
Total same as item code.6.1.12/1 Quantity Unit
73.173 vide qty of itm no. 14
Below Longer plinth beam 0 44.2 0.125 0.150 0.000 cum
Shorter wall 0 3.91 0.250 1.830 0.000 cum
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.000 cum
deduction for column 0 0.25 0.250 1.830 0.000 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.000 cum
deduction for opening in front side 0 1.83 0.250 1.830 0.000 cum
Total 73.173 cum
14 BCD 13.11.2 Cement plaster in course sand12 mm cement plaster of mix: 1:4(1 cement :4 coarse sand) cum 982.00 152.90 150147.80
Total Qty Quantity Unit
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
Shorter wall 0 3.91 0.250 1.830 0.00 cum
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.00 cum
deduction for column 0 0.25 0.250 1.830 0.00 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
deduction for opening in front side 0 1.83 0.250 1.830 0.00 cum
Total 982.00 m2
14 BCD 13.78.1 Applying one coat of cement primer of approved brand and manufacture on wall surface: Cement primer cum 982.00 38.60 37905.20
Total same as item code.13.11.2 Quantity Unit
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
Shorter wall 0 3.91 0.250 1.830 0.00 cum
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.00 cum
deduction for column 0 0.25 0.250 1.830 0.00 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
deduction for opening in front side 0 1.83 0.250 1.830 0.00 cum
Total 982.00 m2
14 BCD 13.79.1 Finishing walls with water proofing cement paint of approved brand and manufacture and of required shade to give an even shade New work (three or more coats) cum 982.00 81.20 79738.40
Total same as item code.13.11.2 Quantity Unit
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
Shorter wall 0 3.91 0.250 1.830 0.00 cum
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.00 cum
deduction for column 0 0.25 0.250 1.830 0.00 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.00 cum
deduction for opening in front side 0 1.83 0.250 1.830 0.00 cum
Total 982.00 m2
15 BCD 10.16.1 Steel work in built up tubular (round, squareor rectangular hollowtubes etc.)trusses etc., including cutting, hoisting, fixingin position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes kg 4206.75 123.90 521216.33
Description No L W D Quantity Unit
Total Weight of tubular trusses@ 1.5kg per sqmt 4206.75 kg
Total 4206.75 kg
16 BCD 12.1.2 Providing corru gated G.S. sheet roofing including vertical / curved surface fixed with polymer coated Jor L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washersor with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto any pitchinhorizontal/vertical or curved surfaces), excluding thecost of purlins, raftersand trussesandincluding cutting to size and shape wherever required. 0.8mm thick with zinc coating not less than 275 gm/mz sqm 411.21 1501.30 617352.14
Description No Quantity Unit
cutting size and shape wherever required Roofing over the structure 1 17.53 12.800 224.384 sqm
side of the structure 1 12.04 0.610 7.344 sqm
Total 357.58 sqm
15 percent extra for overlapping 15% 53.64 sqm
17 BCD 12.9.1 Providing and fixing15cm wide45 cm over all semi circularplainG.S.sheet gutter withiron brackets 40x3mm size bolts,nuts and washers etc. including making necessary connections with rain water pipes complete. 0.80 mm thick with zinc coating not less than 275 gm/m2 rmt 28.96 577.40 16721.50
Description No L W D Quantity Unit
Total GS sheet gutter Both side of structure 1 28.96 28.960 rmt
Total 28.96 rmt
18 BCD 13.26 Neat cement punning sqm 225.41 40.50 9129.17
Description No L W D Quantity Unit
Total 225.41 sqm
19 BCD 11.6.1 Cement plaster skirting (upto 30cm hieght ) with cement mortar1:3 (1 cement:3 coarse sand) finished with a floating coat of neat cement. 18 mm thick sqm 754.19 304.15 229387.34
Description No L W D Quantity Unit
internal 5 56.90 1.90 540.55 sqm
external 1 103.63 1.90 196.90 sqm
door deduction 5 1.83 1.83 16.74 sqm
total wall tile required Total 754.19 sqm
20 BCD 10.16.1 Steel work in built up tubular (round, squareor rectangular hollowtubes etc.)trusses etc., including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Hot finished welded type tubes kg 7845.75 123.90 972088.43
Description No L W D Quantity Unit
30 kg per sqmt Total 7845.750
21 BCD 13.82.1 Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade: New steel work (two or more coats) sq n 523.06 83.50 43675.51
Description No L W D Quantity Unit
New steel work (two or more coats 2*Area of steel section 2 261.530 523.060 sq n
Total paint area Total 523.060
22 BCD 11.78 Providing and laying factory made coloured chamfered edge Cement Concrete paver blocks of required strength, thickness & size/shape,made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of finesand, compacting and properem bedding/layingof interlocking paver blocks in tothe sand bedding layer through vibratory compaction by usingplate vibrator, fillingthe jointswith jamunasandandcuttingof paverblocksasper required size and pattern,finishing and sweeping extra sand in footpath,parks, lawns,drivewaysor light trafficparkingetc.complete as per manufacturer’s specifications & direction of Engineer-in-Charge. 60mmthickC.C.paverblockofM-35gradewithapprovedcolour, design & pattern. sqm 111.69 714.00 79744.66
Description No L W D Quantity Unit
size and pattern,finishing and sweeping extra sand 1 4.270 18.900 80.703 sqm
Total paver block area Total 111.687
23 Drain (rcc) as per sub 23.47 460.26 10802.30
All 5 block estimate
Total leanth 23.47
24 Carriage Cost of materials #NAME?
(i) From Koilwar (105.0Km) Coarse Sand m3 142.655 2353.33 335714.74 #NAME?
(ii) From Mirjapur (278.0Km) S/Chips m3 40.22 2133.77 85810.11
(iii) Local (03.0Km) Local Sand m3 49.86 310.47 15479.95
(iv) Local (01.0Km) Cement mt 59.86 0.00 0.00
(v) Local (01.0Km) Steel mt 0.000 467.41 0.00
( vi) S/METAL CUM 0.00 1810.21 0.00
(vii) S/DUST CUM 0.00 1752.07 0.00
(v) Paver Block TH 5816.669 0.94 5473.49
25 Seigniorage Fee 70895.83
(iv) S/Chips 40 mm m3 0.00 0.00 0
Sub Total (C) = 5,692.26
26 Diffrence Cost Of Materials
Sub Total-D 17,949.27
Grand Total(A+B+C+D) 4,538,093.14
Add [email protected]%(Excluding S.F) 243,241.79
Grand Total= 4,787,027.19
s.no's Description qty unit cement c.sand s.c.10mm s.chips 20mm S.C 40MM Dust STEEL L.SAND BRICK PAVER
MT Cum Cum Cum CUM Kg CUM
CHAPRA MUNICIPAL CORPORATION
BILL OF QUANTITY(BOQ)
Construction of Animal Birth Control centre (ABC) & Dog Shelter along with Boundary wall, internal drain work,sanitation and electric fittings near Railway Dhalla no-44, Huse Chapra,Saran.
SIZE:-145 feet x 85 feet
NO. L W D/H UNIT Qty. Rate AMOUNT
Sl. No. SOR No. Item Unit Qty. Rate Total
2 BCD 15.2.1 Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix m3 0 970.9 0.0
No L W D Quantity Unit
2 BCD 15.2.1 Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix m3 0 970.9 0.0
No L W D Quantity Unit
1 BCD 2.29.1 Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 mAll kinds of soil. 100sqm 10.664 1355.40 14454.66
No L W D Quantity Unit
complete area 1 135 85 11475.0 sft
2 BCD 2.8.1 Earthwork in excavationinfoundationtrenchesordrains(notexceeding1.5 minwidthor10sqmonplan) includingdressingof sidesandrammingof bottoms, lift upto 1.5m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All Kinds of soil m3 280.04 360.70 101010.43
No L W D/H Quantity Unit
complete area 1 1353 2 2 5412.0 cft
2 BCD 2.2.1 Earthwork in rough excavation , banking excavated earth in layer not exceeding20cmindepth,breakingclodswatering, rollingeachlayerwith 1/2tonnerollerorwoodenorsteel rammersandrollingevery3rdandtop most layer with power roller of minimum8 tonnes and dressing up in embankments for roads, floodbanks ,marginal banksandguidebanksor filling up ground depressions. lead upto 50 m and lift upto 1.5 m. All Kinds of soil cu.mt 17.87 0.00 0.00
No L W D Quantity Unit
Below ground level of slab(long wall) 7 12.0396 0.25 0.25 5.3 cu.mt
(Short wall) 15 3.9116 0.25 0.25 3.7 cu.mt
Below longer plinth beam 7 12.0396 0.25 0.25 5.3 cu.mt
Below shorter plinth beam 15 3.9116 0.25 0.25 3.7 cu.mt
Total Excavation 17.9
3 BCD 20.3A.1 Making25cm(10")dia bore up to 4 mtr depth below ground with hand auger of approved quality in ordinarysoi! (vide classification of soil item A )true to plum bandwithout eccentri city in any stage of operation and disposal of the excavated earth up to 50 mtr ,Leadin eludingalllifts,allcompleteasperapproveddisignand directionofE/lDetailsofcostfor4pilesof4m=16mtrs depth ) mtr 69.00 0.00 0.00
No L W D Quantity Unit
3 BCD 11.72 Providing desinition 100A brick flate soling. m3 0.000 283.30 0.0
No L W D Quantity Unit
4 BCD 2.3.1 Banking excavated earth in layers not exceeding 20cm in depth,breaking clods,watering.rolling each layer with1/2 tonne roller, or woodenor steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up ; in embankments for roads, flood banks,marginal banks,and guid ebanks etc. lead upto 50m and lift upto 1.5 m. All Kinds of soil cu.mt 0.00 224.00 0.00
No L W D Quantity Unit
raising from ground 2 fr 0 1353 19.30 0.60 0.0 cu.mt
3 20.2 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not lessthan specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom 300 dia of pile cap). m 348.00 902.60 314104.80
20.2.1 300 mm dia piles
4 BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. cum 967.36 287.30 277922.53
No L W D/H Quantity Unit
plinth and outer areas 1 135 85 2.5 28687.5 cft
Foundation 1 1353 2.000 0.5 1353.0 cft
main building extra filling 1 125 60.000 1 7500.0 cft
deduct for wall areas 1 1353.00 0.83 3.5 -3930.5 cft
Total 33634.0 cft
Total 952.5 cum
5 BCD 11.72 Providingdesignation100Aonebrick flat soling joints filled with local sand including cost of watering, taxes, royaltyall complete as per building specification and direction of E/l, sqm 1240.24 283.30 351359.99
Description No L W D/H Quantity Unit
Foundation 1 1353 2 2706.0 sft
Steps 0 8 3 0.0 sft
plinth 1 135 85 11475.0 sft
deduction for wall area 1 1353 0.83 -1123.0 sft
deduction for pile 226.08 0.41 0.41 -38.0 sft
Total 13020.0 sft
6 BCD 4.1.2 Providing and laying in positioncement concreteof specifiedgrade exluding the cost of centring and shuttering-all work upto plinth level.1:1.5:3(1Cement :1.5coarse sand:3 graded stone aggregate 20mm nominal size) m3 43.31 4420.80 191445.62
Description No L W D/H Quantity Unit
Foundation 1 1353 2.000 0.250 676.5 cft
deduction for wall area 1 1353 0.830 0.250 280.7 cft
deduction for piles 226.08 0.5 0.500 0.250 14.1 cft
Total 1529.1 cft
7 BCD 4.1.3 Providing and laying in positioncement concreteof specifiedgrade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1Cement :2coarse sand:4 graded stone aggregate 20mm nominal size) m3 4.00 3998.10 15992.40
8 BCD 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost o centring,shuttering,finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size). m3 130.150 4688.30 610182.00
Description No L W D/H Quantity Unit
Grade Beam under foundation 1 1362.33 0.830 1.000 1130.7 cft
Plinth Band 1 1362.33 0.833 0.670 760.3 cft
Total Total 1891.1 cft
9 5.2.2 Reinforced cement concrete work in wall (any thickness), including attached pilasters,buttresses,plinth and string courses, fillets,columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement. cum 21.294 5670.00 120738.10
1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size)
Description No L W D/H Quantity Unit
longerColumn 42 0.833 0.833 16.3 475.0 cft
short column 30 0.833 0.833 13.3 276.9 cft
Total 751.9 cft
10 BCD 5.3+5.2.2,5.2.3 Reinforced cement concrete work in arhes, archribs, domes, vaults, shells, folded plate and roofs havings lope more than150 upto floor five level excluding the cost of centring. Shuttering. Finishing and reinforement with 1:2:4(1 cement:2 coarse sand :4 graded stone aggregate 20mm nominal size) cum 26.75 5677.20 151865.10
Description No L W D/H Quantity Unit
Total 944.4 cft
8 BCD 5.33A.2.1 Providing and laying in position machine batched,machine mixed and machine vibrated design mix cement concrete of specified grade for reinforced cement concrete structural elements, excluding thecost ofcentring, shuttering finishing and reinforcement, M-20 grde reinforcd cement concrete Beams, planth beams,girders, bressumers, contilevers, Suspended floors lintels roofs and staircases including spiral staircases, shelves etc. cum 3.49 0.00 0.00
No L W D Quantity Unit
A Columns-Below Ground Lavel 23 0.25 0.25 0.6 0.9 cum
A Columns-Above Ground Lavel 23 0.25 0.25 1.83 2.6 cum
Total RCC in Columns 3.5 cum
9 BCD 5.11.7C Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding upto floor level including cost of binding wire, wastage and over laps upto 12mm horizontal/ inclined position of reinforcement bars in slab and beams, plinth, chajjas, lintels, upto 4.5m vertical length of reinforcement in wall columns (over laps shall be provided as per requirement of IS : 13920; IS 456 & SP :34) etc. complete.Thermo-Mechanically Treated bars. (Fe 500 D ormore) kg 2721.88 0.00 0.00
Description No L W D Quantity Unit
Thermo-Mechanically Treated bars. (Fe 500D or more) for pile and beam Upto Plinth Level Assuming steel@90 kg per 26.75 90 2407.5 kg
In Columns Assuming steel @90 kg per cubiccubic meter 3.49 90 314.4 kg
Total Reinforcements in RCC 2721.9 kg
11 BCD 5.9.1 Centring and shuttering including strutting,propping etc. and removal of form for.Foundations, footings, bases of columns etc. for mass concrete. m2 938.66 211.60 198620.46
Description No L W D/H Quantity Unit
Foundation 2 1353.00 0.830 2246.0 sft
Column Below PL 288 0.83 3.000 717.1 sft
Plinth Band 2 1362.33 0.67 1825.5 sft
Grade Beam 2 1362.33 1.00 2724.7 sft
Total 7513.3 sft
12 BCD 5.9.2 Centring and shuttering including strutting,propping etc. and removal of form for. Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc. m2 383.60 375.10 143888.36
13 BCD 5.9.3 Suspended floors, roots, landings, balcnies and access platform. m2 59.28 437.50 25935.00
14 BCD 5.9.5 Centring and shuttering including strutting,propping etc. and removal of form for.Lintels, beams, plinth bams, griders, bressumers and contilevers. m2 210.73 404.70 85282.63
Lintel band 2 969.00 0.67 1298.5
Top band 2 969.00 0.5 969.0 sft
Total 2267.5 sft
15 BCD 5.9.6 Centring and shuttering including strutting, propping etc. and removal of form for. Columns,Pillars, Piers, Abutments, Posts and Struts m2 261.03 494.40 129054.94
Description No L W D/H Quantity Unit
Total 2808.7 sft
16 6.1A+6.1.12 Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:4 (1 cement: 4 coarse sand ) m3 81.50 5017.90 408958.85
17 BCD 6.1.14A Brick work with bricks of class designation 100A in foundations and plinth in : Cement mortar 1:6 (1 cement: 6 coarse sand ) cum 49.02 4819.90 236271.50
Description No L W D/H Quantity Unit
Below Longer plinth beam 0 44.2 0.13 0.15 0.0 cum
Total 2623.9 cum
18 6.1.14A+6.3A Brick work with bricks of class designation 100A in foundations and plinth in :Cement mortar 1:6 (1 cement: 6 coarse sand ) + Extra for Brick work in above plinth cum 348.11 5662.10 1971031.05
Building 1 969 0.833 13 10493.3 cft
Truss Support 1 65 0.833 3 162.4 cft
Dog Ward And Kitchen 1 420 0.833 8 2798.9 cft
Total 12291.7 cft
19 6.18.4A+6.19A Half brick masonry with bricks of class designation 100A in foundations and plinth in :Cement mortar 1:4 (1 cement: 4 coarse send) m2 134.76 689.00 92848.51
Partition wall 1 145 10 1450.0 sft
Total 1450.0 sft
16 BCD 6.1.12/1 Brick work with bricks of class designation 100Ain foundations and plinth in : Cement mortar 1 .:4 (1 cement: 4 coarse sand ) cum 73.17 0.00 0.00
Description No L W D Quantity Unit
Longer wall 7 12.04 0.250 1.830 38.6 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 cum
Shorter wall 10 3.91 0.250 1.830 17.9 cum
Thin wall for seprator for kennel(14 each) 98 1.04 0.125 1.830 23.3 cum
deduction for column 21 0.25 0.250 1.830 2.4 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 cum
deduction for opening in front side 5 1.83 0.250 1.830 4.2 cum
17 BCD 6.3A Brick work with bricks of class designation 100A in foundation sand plinth in : Extra for Brick work insuper structure above plinth level upto floor V cum cum 73.17 0.00 0.00
Total same as item code.6.1.12/1 Quantity Unit
73.2 vide qty of itm no. 14
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 cum
Shorter wall 0 3.91 0.250 1.830 0.0 cum
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.0 cum
deduction for column 0 0.25 0.250 1.830 0.0 cum
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 cum
deduction for opening in front side 0 1.83 0.250 1.830 0.0 cum
20 BCD 13.11.2 12 mm cement plaster on rough side of single or half brick wall of mix. 1:4 (1 cement: 4 coarse sand) sqm 3988.60 152.90 609856.94
Description No L W D/H Quantity Unit
Building 2 969 13 25194.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
Shorter wall 0 3.91 0.250 1.830 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 sft
deduction for column 0 0.25 0.250 1.830 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
deduction for opening in front side 0 1.83 0.250 1.830 sft
Side truss Support 2 65 3 390.0 sft
Dog Ward And Kitchen 2 420 8 6720.0 sft
Outer 0 210 13 0.0 sft
Partition wall 2 145 10 2900.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
Shorter wall 0 3.91 0.250 1.830 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 sft
deduction for column 0 0.25 0.250 1.830 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
deduction for opening in front side 0 1.83 0.250 1.830 sft
Total 35204.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
Shorter wall 0 3.91 0.250 1.830 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 sft
deduction for column 0 0.25 0.250 1.830 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
deduction for opening in front side 0 1.83 0.250 1.830 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
Shorter wall 0 3.91 0.250 1.830 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 sft
deduction for column 0 0.25 0.250 1.830 sft
Below Longer plinth beam 0 44.2 0.125 0.150 sft
deduction for opening in front side 0 1.83 0.250 1.830 sft
Total -1631.0 sft
Net Qty 33573.0 sft
21 BCD 13.17.2 CEMENT PLASTER WITH A FLOATING COAT OF NEAT CEMENT12mm cement plaster1:4(1cement:4coarsesand) finished with a floating coat of near cement Details of cost for 10 sqm sqm 123.79 192.20 23792.44
Description No L W D/H Quantity Unit
Step 2 8 4 64.0 sft
sideouter area upto pinth 2 135 2 540.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 sft
Shorter wall 0 3.91 0.250 1.830 0.0 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.0 sft
deduction for column 0 0.25 0.250 1.830 0.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 0.0 sft
deduction for opening in front side 0 1.83 0.250 1.830 0.0 sft
Total 844.0 sft
22 BCD 13.93.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work m2 922.80 84.50 77976.60
23 BCD 11.4 52 mm thick cement concrete flooring with metallic concrete hardener topping under layer 40mm thick cement concrete1:2:4(1cement:2 coarse sand:4graded stone aggregate 20mm nominal size) and top layer12mmthick metallicconcrete hardener consisting of mix1:2(1 cement hardener mix:2 stone aggregate 6 mm nominal size) by volume @2liter per 50kg of cement or as pe rmanufacture specification.This includes cost of cement slurry,etc.but excluding the cost of nosing of steps etc. complete. sqm 640.91 472.00 302509.47
Description No L W D/H Quantity Unit
wall deductions 1 1389 0.833 -1157.0 sft
Below Longer plinth beam 0 44.2 0.125 0.150 5.5 sft
Shorter wall 0 3.91 0.250 1.830 1.0 sft
Thin wall for seprator for kennel(14 each) 0 1.04 0.125 1.830 0.1 sft
deduction for column 0 0.25 0.250 1.830 0.1 sft
Below Longer plinth beam 0 44.2 0.125 0.150 5.5 sft
deduction for opening in front side 0 1.83 0.250 1.830 0.5 sft
half brick deduction 1 145.00 0.410 -59.5 sft
24 BCD 11.36 Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS:15622 (Thickness to be specified by the manufacture) of approved make inall colours, shades exceptburgundy,bottle green,black of any size as approved by Engineer-in-chargein skirting, risers of steps and dados over 12mm thick bed of cement Motar 1:3(1cement: 3 coarse sand)andjointingwithgreycement [email protected] including pointing in white cement mixed with pigment of matching shade complete. sqm 54.00 795.00 42930.00
Deduction DOOR 2 2.5 7.000 -35.0 sft
Total 189.0 sft
25 BCD 11.41.2 Providing and laying vitrifed floor tiles in different sizes{thickness to be specified by the manufactruer)with water absorption's less than 0.08% and conforming to IS : 15622of approve dmake in all colour sand shades, laid on 20mm thick cement mortar1:4(1cement: 4coarse sand ) includinggrouting the joint withwhitecement andmatching pigments etc., complete.Size of Tile 60x60 cm sqm 659.26 1638.80 1080395.29
deduct for wall areas 1 969.00 0.830 -804.3 sft
Total -1212.3 sft
26 BCD 10.32.2 Steel work welded in built up sections/framed worK including cutting hoisting, rixing inpositionandapplyingaprimingcoat of approvedsteel primer using structural steel, etc. as required.Ingratings, frames,guardbar, ladders, railings,brackts.gates& similar works. kg 24192.00 114.60 2772403.20
Description No L W D/H Quantity Unit
736sftX3kg per sft 1840.0 kg
Truss Support 1 140 64 8960.0 sft
2.70kg/sft Total 24192.0 kg
27 BCD 9.48 Providing and fixing M.S. grills of required pattern in frames of windows etc.with M.S. flats, square or round bars etc. including priming coat withapproved steel primer all complete. kg 3795.50 144.50 548449.75
TOTAL 136.0 sft
2.5KG/SQFT WEIGHT 340.0 kg
28 BCD 9.20.1+9.22.1 Providing and fixing ISI marked flush door shutters conforming to IS:2202 (Part I) decorative type,core of block board construction with frame of 1st class hardwood and wel lmatched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.35 mm thick including stainless steel butt hinges with necessary screws sqm 29.60 3253.70 96309.52
Total 563.5 sft
29 BCD 10.4 Providing and fixing1mm thick M.S.sheet sliding-shutterswithframeand diagonalbracesof40x40x6mmangleiron,3mmM.S.gussetplatesat the junctionandcorners, 25mmdiapulley, 40x40x6mmangleandT-iron guideat the topbottemrespectively includingapplyingaprimingcoat of approved steel primer sqm 7.81 4279.90 33426.02
Description No L W D/H Quantity Unit
30 BCD 10.3 Providing and fixing in position collapsible steel shutters with vertical channes20x10x2mmandbracedwith flat irondiagonals20x5mmsize withtopandbottomrailofT-tron40x40x6mmwith40mmdiasteelpulleys completewithbots.nuts lockingarrangement stoppers handies including applying a priming coat of approved steel primer. sqm 10.41 6303.40 65611.60
Description No L W D/H Quantity Unit
entry gate 1 and 2 2 8.00 7.000 112.0 sft
Total 112.0 sft
27 BCD 12.1.3 Providing corrugatedG.S. sheet roofing includingvertical / curvedsurface fixedwithpolymercoatedJorLhooks, boltsandnuts8mmdiameterwith bitumenandG.I. limpetwashersorwithG.I. limpetwashersfilledwithwhite lead, includingacoat of approvedsteel primer and twocoatsof approved paintonoverlappingofsheetscomplete(uptoanypitchinhorizontal/vertical or curvedsurfaces), excluding thecost of purlins, raftersand trussesand including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/m2 sqm 1075.61 0.00 0.00
Description No L W D Quantity Unit
15% for over lapping 1509.6 sft
Total 11573.6 sft
31 BCD 12.1.3 Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated Jor L hooks, bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with G.I. limpetwashersfilledwithwhite lead, includinga coat of approved steel primer and two coats of approved paint on over lapping of sheets complete (upto any pitch in horizontal/ vertical or curved surfaces), excluding thecost of purlins, raftersand trussesand including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/m2 sqm 1075.56 1257.30 1352298.60
Description No L W D/H Quantity Unit 67.5
15% for over lapping 1509.0 sft
Total 11573.0 sft
32 BCD 12.60.2 Providing and fixing false ceiling with12mm thick plain/or with design ceiling tiles of BWP type phenol for maldehyde synthetic resin bonded pressed particleboardconformingtoIS:3087finished with a coatofaluminum primer on both sides & edge sand two coats of synthetic enamel paint of approved quality one xposed face fixed to agridmadeoutofanodizedaluminum(with 15micronanodiccoating)T-sections35x15x1.5mmsizemainrunnersand crossrunners23.5x19x1.5mmfixedtomainrunnersplaced600mmcentre tocentrebothwayssoastoformagridof600mmsquare.Theframework shallbesuspendedfromceilingbyleveladjustinghangersof6mmdiaM.S. rod fixed to roof slabnymeansof ceilingcleats. Thesuspendersshall be placed600x1200mmcentretocentre includingfixingto theframewithCP brassscrewsandapplyingaprimingcoatofzincchromateyellowprimer for steel members complete (Frame work and suspenders to be paid for separately) sqm 752.79 670.90 505045.54
Description No L W D/H Quantity Unit
Bulding 1 135.00 60.00 8100.0 sft
Total 8100.0 sft
33 BCD 9.147D.5 Three track three panels sliding window made of (bigseries) frame 116x45mm & sash 46x62mm both having wall thickness of 2.3±0.2mm and single glazing bead/double glazing bead of appropriate dimension. (Area of window above 1.75 sqm) sqm 55.76 8624.00 480892.19
Description No L W D/H Quantity Unit
Total 600.0 sft
34 BCD 10.14.1 Providing and fixingT-iron frames for doors,windows and ventilators of mild steel Tee-sections, joints mitred and welded, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer. Fixingwith 15x3mm lugs 10 cm long embedded in cement concrete block 15x10x10 cmofC.C.1:3:6(1Cement :3coarsesand : 6 graded stone aggregate 20 mm nominal size). kg 368.14 110.40 40642.68
Description No L W D/H Quantity Unit
(179.5rft/3.28)mtr*3kg Total 122.7 mtr
35 BCD 13.40A Providing and applying plaster of paris putty of 2mm thickness over plastered surface to prepare the surface even and smooth complete. sqm 2146.06 127.90 274481.07
70% of total plastered area
36 BCD 13.48.1 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications.Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm. sqm 3065.80 117.30 359618.34
total plastered area
29 BCD 13.81.3+13.82.1 Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications.Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of special primer applied @ 0.75 ltr /10 sqm. sqm 2763.40 0.00 0.00
Description No L W D Quantity Unit
Qty vide itam no.14,15
Qty vide itam no.14,15
37 BCD 13.81.3+13.82.1 Applying priming coat:With ready mixed zinc chromate yellow primer of approved brand and manufacture on steel galvanized iron/steel works AND Painting with ready mixed paint of approved brand and manufacture in all shades to give an even shade:New steel work (two or more coats) sqm 138.99 118.10 16414.36
Description No L W D/H Quantity Unit
Total paver block area Total 1495.5 sft
38 Reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars TMTC-500-
5.22.7C Thermo-Mechanically Treated bars TMTC-500-12mm dia.
pile upto plinth 432 3 1296 m
grade beam 6 415.24 2491.44 m
plinth band 4 415.24 2491.44 m
total 7602.72 m
5.22.7B Thermo-Mechanically Treated bars TMTC-500-10mm dia.
LINTEL BAND 4 295.42 1181.68 m
TOTAL 2363.36 m
5.22.7A Thermo-Mechanically Treated bars TMTC-500-8mm dia.
PILE upto plinth 1440 0.88 1267.20 m
GRADE BEAM 2768 0.99 2740.32 m
PLINTH BEAM 2768 0.78 2159.04 m
LINTEL BAND 1970 0.75 1477.50 m
total 10810.16 m
Pile upto plinth 557.26 cft 0 cum 90kg/cum 0
column And beam 3210.37 cft 0 cum 90kg/cum 0
SubTotal A 15,933,024.76
39 Carriage Cost of materials
(iii) Local Sand m3 986.13 310.47 306163.78
(iv) Local (01.0Km) Cement mt 163.27 0.00 0.00
(v) Local (01.0Km) Steel mt 0.000 467.41 0.00
( vi) S/METAL CUM 0.00 1810.21 0.00
(vii) S/DUST CUM 0.00 1752.07 0.00
(v) Paver Block TH 0.000 0.94 0.00
40 Seigniorage Fee
(i) Coarse Sand m3 473.126 17.58 8317.56
(iv) S/Chips 40 mm m3 0.00 0.00 0
(vii) S/DUST CUM 0.00 117.23 0.00
Total 177,326.74
41 Diffrence Cost Of Materials
Ciment mt 0.00 264.63 0.00
Sub Total-D 0.00
Add [email protected]%(Excluding S.F) 939,845.22
Grand Total= 18,651,597.75
Electricfication works @ 3% 478,204.41
Sanitaroy fittings and water supply works @3% 478,204.41 19,972,675.50
Saptic Tank and soak pit @1% 159,401.47
signboard 2 nos @ 5000 each 10,000.00
Total 19,777,408
BOUNDARY WALL WITH CAMPUS DEVELOPMENT WORKS 0.00
Add 1% Contingency charge upto 1 cr 0.00
Add 0.5% Contingency charge above 1 cr 0.00
TOTAL 19,777,408
Say TOTAL 195267.46
s.no's Description qty unit cement c.sand s.c.10mm s.chips 20mm S.C 40MM Dust STEEL L.SAND BRICK PAVER
1 L/S FILLING 967.360 m3 967.36
9 Reinforcement 12472.120 kg 12.47
MT Cum Cum Cum CUM MT CUM
MUZAFFARPUR MUNICIPAL CORPORATION MUZAFFARPUR
NAME OF WORK -WARD 1 DEPARTMENTAL
Sl. No. SOR No. Item Unit Qty. Rate Total
1 BCD 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kinds of soil. total no. of footing @3m c/c m3 122.75 360.70 44274.00
No L W D Quantity Unit
Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix
No L W D Quantity Unit
Total 122.745 m3
2 BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. m2 478.50 287.30 137472.00
No L W D Quantity Unit
paver block 466.84 cum
3 BCD 11.72 Providing designation 100A one brick flat soling joints filled with local sand including cost of watering, taxes, royaltyall complete as per building specification and direction of E/l, m2 116.58 283.30 33027.00
Description No L W D Quantity Unit
below tie beam 1 139 0.3 41.7 m2
4 BCD 6.1.14A+6.3a Brick work with bricks of class designation 100A in foundation sand plinth in : Cement mortar 1 .:4 (1 cement: 4 coarse sand ) m3 60.81 5662.10 344326.00
Description No L W D Quantity Unit
in substructure 1 139 0.250 0.75 26.0625 m3
in super substructure 1 139 0.13 2.000 34.75 m3
5 BCD 4.1.3 Providing and laying inposition cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:2:4(1Cement: 2coarseb sand:4 graded stone aggre gate20mm nominal size) m3 17.487 3998.10 69915.00
Description No L W D Quantity Unit
wall (Under Beam) 1 139 0.30 0.150 6.255 m3
6 BCD 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost o centring,shuttering,finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size). m3 34.02 4688.30 159496.00
Description No L W D Quantity Unit
column upto GL 52 0.25 0.25 1.500 4.88 m3
7 BCD 5.2.2 Reinforced cement concrete work in wall (any thickness), including attachedpilasters,buttresses,plinthandstringcourses, fillets,columns, pillars, piers, abutments, posts and struts, etc. upt floor five level excluding cost of centring, shuttering, finishin and reinforcement.1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20mm nominal size) m3 9.75 5670.00 55283.00
Description No L W D Quantity Unit
8 BCD 5.3 Reinforced cement conrete work in beams,suspended floors, roofs havingslopeupto15, landings,balconiec,shelves,chajjas, lintels,bands, plainwindowsills, staircasesandspiral staircasesuptofloor five level excludingthecostofcentring,shuttering, finishingandreinforementwith 1:2:4(1cement:2coarsesand:4gradedstoneaggregate20mmnominal size). m3 12.16 5335.90 64898.00
Description No L W D Quantity Unit
9a BCD 5.9.1 Centring and shuttering including strutting, propping etc. and removal of form for. Foundations, footings, bases of columns etc. for mass concrete. m3 62.40 211.60 13204.00
Description No L W D Quantity Unit
(a)F1 10x4(for four side) 52 4.8 0.25 62.4 m2
mid band 1 139 0.5 69.5 m2
top band 1 139 0.2 27.8 m2
above ground lvl 52 2 0.25 3 78 m2
6 BCD 5.22.1B Reinforcement forR.C.C.work includingstraightening,cutting,bending, placing in position and binding all complete. Thermo-Mechanically Treated bars TMTC-500-10mm dia. m3 4474.40 97.10 434464.00
Qty Vide itm no. 6,7 and 8TMT FE 500 8mm kg
6 BCD 13.11.4 Cement plaster in course sand 12 mm cement plaster of mix: 1:6(1 cement: 6 coarse sand) m3 957.60 141.50 135500.00
Description No L W D Quantity Unit
in side wall 1 152 3.000 456 m3
out side wall 1 152 3.00 456 m3
top of wall 1 152 0.300 45.6 m3
6 BCD 13.79.2 Finishingwallswithwaterproofingcement paintof approvedbrand and manufacture and of required shade to give an even shade Old work (one or more coats) m3 729.60 81.20 59244.00
Description No L W D Quantity Unit
in side wall 1 152 2.400 364.8 m3
out side wall 1 152 2.10 319.2 m3
top of wall 1 152 0.300 45.6 m3
BCD 11.79 Providing and laying factory made chamfered edge Cement Concrete paver blocks of required strength,thickness & size/shape, made by table vibratory method , to attain superior smooth finish using PU or equivalent moulds, laid in required Grey colour & pattern over 50mm thick compacted bed of coarse sand, compacting and proper embedding / laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with jamuna sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand in footpath, parks,lawns, drive ways or light traffic parking etc. all complete as per manufacturer’s specifications & direction of Engineer -in-Charge:
NO L W(L+R) Quantity
A 11.79.1 with approved colour desing and pattern
B 11.79.2 with colour design and pattern
6 BCD 10.4 Providingandfixing1mmthickM.S.sheetsliding-shutterswithframeand diagonalbracesof40x40x6mmangleiron,3mmM.S.gussetplatesat the junctionandcorners, 25mmdiapulley, 40x40x6mmangleandT-iron guideat the topbottemrespectively includingapplyingaprimingcoat of approved steel primer. m3 10.41 4279.90 44554.00
= Sub Total-A 2,183,175.23
8 Carriage Cost of materials
(i) From Koilwar (105.0Km) Coarse Sand m3 18.14 2353.33 42689.00
(ii) From Mirjapur (278.0Km) S/Chips m3 62.16 2133.77 132635.00
(iii) Local (03.0Km) Local Sand m3 468.59 310.47 145483.00
(v) Local (01.0Km) Steel mt 4.698 0.00 0.00
( vi) S/METAL CUM 0.000 0.00 0.00
(vii) S/DUST CUM 0.000 0.00 0.00
Sub Toal-(B) = 347,558.00
9 Seigniorage Fee
(i) Coarse Sand m3 18.14 175.80 3189.00
(iv) S/Chips 40 mm m3 0 468.92 0
(vii) S/DUST CUM 0.000 0.00 0.00
Total 253,684.76
Sub Total (C) = 25,368.00
10 Diffrence Cost Of Materials
Sub Total-D 20,096.94
Grand Total(A+B+C+D) 2,550,830.17
Add [email protected]%(Excluding S.F) 136,724.50
Grand Total= 2,712,922.67
s.no's Description qty unit cement c.sand s.c.10mm s.chips 20mm S.CHIPS 40MM Dust STEEL L.SAND
1 BCD 2.26 #REF! cum 0 0
2 BCD 4.1.5 #REF! cum #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! 0 4698.12 478.498
MT Cum Cum Cum CUM Kg CUM
CONSTRUCTION OF ABC CENTRE AND DOG WARD IN SARAN DISTRICT,BIHAR.
ABSTRACT OF COST
Construction of Animal Birth Control centre (ABC) near Railway Dhalla no-44, Huse Chapra,Saran.
SL NO. WORK DESCRIPTION AMOUNT
1 CONSTRUCTION OF ABC CENTRE 0.00
2 CONSTRUCTION OF BOUNDARY WALL 1,972,392.00
3 CONSTRUCTION OF DRAIN 736,514.00
4 Electricfication works @ 3% 0.00
5 Saptic Tank and soak pit @1% 0.00
6 Sanitaroy fittings and water supply works @3% 0.00
7 SIGN BOARD 7,000.00
8 Contingencies 0.00
TOTAL 2,715,906
CHAPRA NAGAR NIGAM
LENGTH M 25 0.25 0.30
Sl. No. SOR No. Item Unit Qty. Rate Total
1 BCD 15.2.1 Demolishing cement concrete including disposal of material within50 metre lead:1:3:6 or richer mix m3 0.00 970.9 0.0
No L W D Quantity Unit
1 2.8.1 Earth work in excavation in foundation trenches or drains(not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m . including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All Kinds of soil m3 6.75 360.70 2435.00
No L W D Quantity Unit
2 BCD 2.28 Supplying and Filling in plinth with local sand and under floors including, watering, ramming consolidating and dressing complete. m3 1.500 287.30 431.0
No L W D Quantity Unit
3 BCD 2.26 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth: consolidating each deposited layer by ramming and watering lead m3 1.69 123.90 209.0
No L W D Quantity Unit
4 BCD 4.1.5 Providingand laying in position cement concrete of specified grade exluding the cost of centring and shuttering-all work upto plinth level.1:3:6(1Cement:3coarse sand:6graded stone aggregate 20mm nominal size) m3 1.50 3434.00 5151.0
No L W D Quantity Unit
5(a) BCD 5.9.1 Centring and shuttering including strutting,propping etc. and removal of form for. Foundations, footings, bases of columns etc. for mass concrete. m2 10.00 211.60 2116.00
No L W D Quantity Unit
5(B) BCD 5.9.2 Centring and shuttering including strutting,propping etc. and removal of form for Walls (any thickness) including attached pilasters. Butteresses, plinth and string courses etc. m2 42.50 375.10 15942.00
Description No L W D Quantity Unit
6 BCD 5.1.2 Providing and laying in position specified grade of reinforced cement concrete excluding the cost o centring,shuttering,finishing and reinforcement-All work puto plinth level 1:1:5:3(1 cement: 1.5 coarse sand:3 graded stone aggregate 20 mm nominal size). m3 4.03 4688.30 18900.00
Description No L W D Quantity Unit
7(a) BCD 5.22.7b Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Thermo-Mechanically Treated bars TMTC-500-10mm dia. kg 181.41 92.60 16798.00
Description No L W D Quantity Unit
(b) BCD 5.22.7A Reinforcement for R.C.C. work including straightening, cutting, bending,placing in position and binding all complete. Thermo-Mechanically Treated bars TMTC-500-8mm dia. kg 100.78 94.50 9524.00
Description No L W D Quantity Unit
= Sub Total-A 71,506.00
8 Carriage Cost of materials
(iv) Local (01.0Km) Cement mt 1.94 0.0 0.0
(v) Local (01.0Km) Steel mt 0.19 0.0 0.0
( vi) S/METAL CUM 0.000 0.00 0.00
(vii) S/DUST CUM 0.000 0.00 0.00
Sub Toal-(B) = 14,190.00
9 Seigniorage Fee
(i) Coarse Sand m3 2.42 175.8 425.0
(iii) S/Chips 10 mm m3 1.49 657.9 979.0
(iv) S/Chips 40 mm m3 0 486.9 0.0
(vi) Local Sand m3 1.50 141.9 213.0
(vii) S/DUST CUM 0.000 0.00 0.00
Total= 3,610.00
Sub Total (C) = 361.00
10 Diffrence Cost Of Materials
Sub Total-D 514.00
Grand Total(A+B+C+D) 86,571.00
Add [email protected]%(Excluding S.F) 4,620.86
Grand Total= 91,192.00
s.no's Description qty unit cement c.sand s.chips10mm s.chips 20mm S.CHIPS 40MM Dust STEEL L.SAND
MT Cum Cum Cum CUM Kg CUM
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NIT06-2026-27.pdf
NIT • 3.09 MB
NIT06-2026-27.pdf
NIT • 3.09 MB
BOQ ABC.xlsx
NIT • 0.13 MB
Download all tender documents and submit your bid