Loading…
Loading…
Tender Value
₹19.3 L
EMD Value
₹38,560
Closing Date
7 Aug 2026, 3:00 pmClosed
Er. Paras Nayyar
Executive Engineer, Bhakra Dam Division, BBMB, Nangal Township
Construction of new Police Barrack at Gwalthai Near HP Police Chowki
2026_BBMB_280661_1
NIT-245/BDD/2026
Open Tender
Civil Works
Tender cum Auction
180 days
Bhakra Dam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹38,560
7 Aug 2026
15 Jun 2026
8 Aug 2026
15 Jun 2026
7 Aug 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | SUB-ABSTRACT OF COST- A ( Civil Works ) Earth work in excavation of foundations of bridgesculverts, buildings including handling of material with a combined lead of 15 metres dressing of bed and sides stacking the excavated soil from the edge of excavation and subsequent filling around :-
(b) For semi-conglomerate soil of the nature of pick jumper work.
[As per CSR itme No. 6.7 (b)] | 53.82 | cum | 405.6 | ₹21,829.39 |
| 3 | Cement concrete 1:6:12 With stone aggregate 40mm gauge
mixing by mechanical means using concrete mixer volumetric type. [As per CSR itme No. 10.8 (b) (ii)] | 17.94 | cum | 3,605.08 | ₹64,675.14 |
| 4 | First class brunt brick work laid in cement sand mortar 1:6 in foundation and plinth. [As per CSR itme No. 11.3 (i)] | 23.1 | cum | 5,338.08 | ₹1,23,309.65 |
| 5 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth.(As per CSR Item no. 10.15) | 3.23 | cum | 5,618.32 | ₹18,147.17 |
| 6 | Shuttering for faces of concrete foundations and foundation beam and plinth beam ( vertical or bettering)
[As per CSR Item No. 9.1] | 28.3 | sqm | 243.36 | ₹6,887.09 |
| 7 | First class brunt brick work laid in cement sand mortar 1:6 in first storey up to 4.00 m above plinth level. [As per CSR item No. 11.4 (i)] | 51.68 | cum | 5,496.11 | ₹2,84,038.96 |
| 8 | 115 mm thick brick wall laid in cement sand mortar 1:4 without reinforcement in superstructure.[As per CSR item No. 11.36] | 17.95 | sqm | 695.31 | ₹12,480.81 |
| 9 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure.[As per CSR item no. 10.20] | 20.81 | cum | 6,486.4 | ₹1,34,981.98 |
| 10 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels.[As per CSR Item no. 9.6] | 16.1 | sqm | 440.36 | ₹7,089.8 |
| 11 | Centring and shuttring for flat surfaces such as suspended floors , roofs , landings , chajjas , shelves 'etc.[As per CSR item no. 9.8] | 122.46 | sqm | 616.3 | ₹75,472.1 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_327503.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .