Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | L1 | Accepted-AOC OK | |
| 2 | L2₹5.4 L+₹428.92 (0.08%)Rejected-AOC | L2 | Rejected-AOC OK | |
| 3 | L3₹5.4 L+₹697 (0.13%)Rejected-AOC | L3 | Rejected-AOC OK |
Tender Value
₹5.4 L
EMD Value
₹10,723
Closing Date
17 Mar 2026, 1:00 pmClosed
THE BDO/EO, MAL
O/O THE BDO/EO, MAL
C.C. DRAIN FROM THE HOUSE OF JAHIRUL ISLAM TO NASIR ALI HOUSE AT PART NO. 20/40, NAYA BUSTY, SUNASHPALLY OODLABARI WITHIN MAL PANCHAYAT SAMITY UNDER JALPAIGURI DISTRICT FOR THE YEAR OF 2025-26. UNDER THE FUND OF 15TH F.C.(TIED).
2026_ZPHD_1020630_6
WB/73/EO/MAL PS/2025-26
Open Tender
CIVIL WORKS
Percentage
OODLABARI GP
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,723
Yes
3 Sept 2026
11 Mar 2026
20 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PWD Building Schedule Page No. - 1, Item No. - 2
Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 146.25 | Cum | 119.27 | ₹17,443.24 |
| 2 | PWD Building Schedule Page No. - 47, Item No. - 3
Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 162.5 | Cum | 24 | ₹3,900 |
| 3 | PWD Building Schedule Page No. - 35, Item No. - 22 (3rd Corrigendum)
Cement concrete with 30 mm down graded shingles excluding shuttering. N.B. Variety In ground floor (a) 1:3:6 proportion | 78 | Cum | 3,393 | ₹2,64,654 |
| 4 | PWD Road & Bridge Schedule Page No. - 333, Item No. - 18.07 (b)
Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.(a) M-20 Grade Using concrete mixer | 1.73 | Cum | 4,745 | ₹8,208.85 |
| 5 | PWD Road & Bridge Schedule Page No. - 311, Item No. -14.03
Supplying, fitting and placing HYSD bar reinforcement in Bridge Super-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications. | 0.19 | Cum | 64,243 | ₹12,206.17 |
| 6 | PWD Road & Bridge Schedule Page No. - 332, Item No. - 18.05
Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction
(b) Where staging is not required. | 450.48 | Sqm | 205 | ₹92,348.4 |
| 7 | PWD Building Schedule Page No. - 1, Item No. - 189 (3rd Corrigendum)
Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding
cost of chipping over concrete surface] (ii) With 1:4 cement mortar (c) 10 mm thick plaster | 305.5 | Sqm | 126 | ₹38,493 |
| 8 | PWD Building Schedule Page No. - 15, Item No. - 192
Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. | 305.5 | Sqm | 34 | ₹10,387 |
| 9 | Providing & fixing Concrete Sign Board as per IRC
specification of size 900 x 750 x 37 mm. thick made
with RCC 1:1½:3 with pakur variety stone chips
reinforced with double layer IRC febric (75 x 75 mm.
mesh) and fixed with necessary nuts & bolts on two
RC precast posts 100 mm. x 150 mm. of height 2.65
m. of which top 750 mm. is of section 100 x 13 mm.
and 1.90 metre above GL & 0.75 metre below GL
including digging hole, repacking the same with
cement concrete 1:3:6 with jhama khoa or with local
stone chips etc. complete including painting two
coats on both faces lettering sign marks etc. as per
direction of the Engineer-in-Charge. (The rate is
inclusive of cost of reinforcement, concrete,
shuttering, nuts & bolts, washer etc. complete.) | 1 | Each | 2,230 | ₹2,230 |
| 10 | Add:- GST @ 18% | 1 | Item | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2508860.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .