| 1 | ₹15.9 LAWARDED | AWARDED |
Tender Value
₹19 L
EMD Value
₹23,750
Closing Date
16 Jun 2025, 10:30 pmClosed
Directorate of Municipal Administration
Construction of CC Drain From Suresh House to Shrinivas House & Lakshmi House to Manjunath House & Deck Slab at near Homeguard Venkatesh House at 8th Ward Kamalapura , Construction of CC Drain & Deck Slab From Yankanayka House to Ramanayka House and CC Drain from Samya Nayka House to Ramanayka House at 20th ward Kamalapura , Construction of CC Drain from HPC Narendra house to Kenchappa House at 7th ward Kamalapura , Construction of CC Drain and Connecting from 2nd & 3rd road of 1st ward to Nallapura Main road at 1st ward Kamalapura, Development of Road from Huligemma Templet o Moula House at 9th ward Kamalapura (SC Category)
DMA/2025-26/OW/WORK_INDENT41174
DMA/2025-26/OW/WORK_INDENT41174
Reserved
Other Works
Electronic Documents, First(One Cover)
DMA Town Municipal Council Kamalapur
₹500
₹23,750
30 May 2025
30 May 2025
6 Jun 2025
Construction of CC Drain From Suresh to Shrinivas nd Lakshmi to Manjunath House nd Deck Slab at near Hm guard Venkatesh House 8th Ward,Fm Yankanayka to Ramanayka House and CC Drain from Samya Nayka to Ramanayka House at 20th wrd, HPC Narendra to Kenchappa House at 7th wrd, Connecting fm 2nd nd 3rd road of 1st ward to Nallapura Main road 1st wrd, Development of Road from Huligemma Temple Moula House at 9th wrd Kamalapura (SC Category)
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structurecomprising ofmasonry, cement concrete, wood work, steel work, including T&P and ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning,straightening,cutting, bending, hooking, laping/welding joints,tying w...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Centring and farm work for drainwalls,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:111,Item No: 4
Centring and farm work for cover slab,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:112,Item No: 6
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning,straightening,cutting, bending, hooking, laping/welding joints,tying w...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Centring and farm work for drainwalls,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:111,Item No: 4
Centring and farm work for cover slab,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:112,Item No: 6
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning,straightening,cutting, bending, hooking, laping/welding joints,tying w...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Centring and farm work for drainwalls,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:111,Item No: 4
Centring and farm work for cover slab,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:112,Item No: 6
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning,straightening,cutting, bending, hooking, laping/welding joints,tying w...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. ...
Centring and farm work for drainwalls,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:111,Item No: 4
Centring and farm work for cover slab,percentage on finished rate of concrete per cum . Volume-1 DSR 2023-24 Page No:112,Item No: 6
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), c...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .