Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.7 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹8.8 L+₹12,709.39 (1.46%)Rejected-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | 2 | Rejected-Finance 2 | |
| 3 | Not Admitted-Fee/PreQual/Technical VILLAGE TIPRI PO BHARAIN TEHSIL BHUNTAR DISTT KULLU HP | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.5 L
EMD Value
₹16,950
Closing Date
9 Sept 2026, 5:00 pmClosed
EE Manali Division HP PWD ManaliEE Manali Division
EE Manali Division HP PWD Manali
RRD on Naggar Sharan Rumsu Pulag road
2026_PWD_142302_1
latter no. 5357-64 dated 19.08.2026
Open Tender
Civil Works
Percentage
60 days
manali
RRD on Naggar Sharan Rumsu Pulag road
5 documents required · 5 mandatory
₹350
₹16,950
26 Sept 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
9 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto any lead ,dressing of sides and bottom and backfilling in trenches with excavated suitable material within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 119.22 | Per cubic metre | 369.76 | ₹44,082.79 |
| 2 | Providing and laying of boulder apron laid in wire crates with 4mm (Four millimetre ) dia GI wire conforming to IS: 280 and IS: 4826 in 100mmx 100mm(One hundred millimetre into One hundred millimetre ) mesh (woven diagonally ) including 10 (Ten) percent extra for laps and joints laid with stone boulders weighing not less than 25 kg.(Twenty five kilogram ) each as per drawing and technical specifications clause 1301within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government but including GST. | 238.28 | Per cubic metre | 3,128.86 | ₹7,45,544.76 |
| 3 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 1204.3.8 Granular material. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. The rate is including octroi, Royality, Malkana, Toll Tax, or any other Taxes imposed by the Government including GST. | 32.55 | Per cubic metre | 1,771.57 | ₹57,664.6 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
Bid847293.pdf
Tender Documents • 2.73 MB
BOQ_211399.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .