Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹15.6 L+₹35,781.31 (2.35%)Rejected-Finance | L2 | Rejected-Finance Quoted Rate More than L1 | |
| 3 | L3₹16.2 L+₹1.0 L (6.79%)Rejected-Finance | L3 | Rejected-Finance Quoted Rate More than L1 | |
| 4 | L4₹16.4 L+₹1.2 L (8.04%)Rejected-Finance | L4 | Rejected-Finance Quoted Rate More than L1 | |
| 5 | L5₹18.1 L+₹2.9 L (18.8%)Rejected-Finance VILL BHANKOLI P O BHANKOLI TEHSIL PUROLA UTTARKASHI UTTARAKHAND 249171 | UTTAR KASHI | UTTARAKHAND | 249171 | L5 | Rejected-Finance Quoted Rate More than L1 |
| Sl No | Description | Qty | Unit | Dalip Singh L5 | contractor L4 | devendra singh bisht L1 | Mahesh Chandra Bhatt L2 | basant ballabh joshi L3 | BORA CONSTRUCTION L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Silt clearance in drain & without service road with its disoposal, ramming & dressing i/c lift up to 1.5 m & lead upto 30 m | 59.5 | Cum | 105.86 ₹6,298.67 | 34 ₹2,023 Lowest | 89.11 ₹5,302.05 | 100 ₹5,950 | 60 ₹3,570 | 120 ₹7,140 |
| 2.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 15 | Cum | 1,259.26 ₹18,888.9 | 800 ₹12,000 Lowest | 1,060.01 ₹15,900.15 | 1,000 ₹15,000 | 1,000 ₹15,000 | 1,200 ₹18,000 |
| 3.00 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. | 72.75 | Cum | 205.4 ₹14,942.85 | 100 ₹7,275 Lowest | 172.9 ₹12,578.48 | 100 ₹7,275 Lowest | 100 ₹7,275 Lowest | 200 ₹14,550 |
| 4.00 | Clearing and Grubbing Road Land- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means. In area of thorny jungle | 1,880 | Sqm | 8.69 ₹16,337.2 | 5 ₹9,400 Lowest | 7.32 ₹13,761.6 | 8 ₹15,040 | 5 ₹9,400 Lowest | 10 ₹18,800 |
| 5.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 352.65 | Cum | 344.44 ₹1,21,466.77 | 300 ₹1,05,795 | 289.94 ₹1,02,247.34 | 250 ₹88,162.5 Lowest | 300 ₹1,05,795 | 350 ₹1,23,427.5 |
| 6.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 12 | Cum | 3,315.63 ₹39,787.56 | 3,000 ₹36,000 | 2,791.01 ₹33,492.12 Lowest | 3,000 ₹36,000 | 3,000 ₹36,000 | 3,800 ₹45,600 |
| 7.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 271.4 | Cum | 3,745.39 ₹10,16,498.85 | 4,000 ₹10,85,600 | 3,152.77 ₹8,55,661.78 Lowest | 3,200 ₹8,68,480 | 3,500 ₹9,49,900 | 3,800 ₹10,31,320 |
| 8.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC Grade M-10 (Nominal mix 1:3:6) | 24.19 | Cum | 5,669.83 ₹1,37,153.19 | 6,000 ₹1,45,140 | 4,772.71 ₹1,15,451.85 | 5,000 ₹1,20,950 | 4,000 ₹96,760 Lowest | 6,800 ₹1,64,492 |
| 9.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 | 9.65 | Cum | 6,987.55 ₹67,429.86 | 8,000 ₹77,200 | 5,881.93 ₹56,760.62 | 5,500 ₹53,075 | 5,000 ₹48,250 Lowest | 8,000 ₹77,200 |
| 10.00 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from riginal (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 0.91 | Tonne | 56,556.89 ₹51,466.77 | 4,000 ₹3,640 Lowest | 47,608.02 ₹43,323.3 | 60,000 ₹54,600 | 60,000 ₹54,600 | 70,000 ₹63,700 |
Tender Value
Refer Docs
EMD Value
₹79,000
Closing Date
15 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E E Officer I D Almora
E E Officer I D Almora
Scheme for restoration and renovation of Galli canal in Dhauladevi development block under state sector Head in Almora district lot3
2026_IRDCE_100491_1
05/EE/2026-27
Open Tender
Civil Works
Item Wise
90 days
Galli canal in Dhauladevi development block
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Yes
E E I D ALMORA
₹79,000
28 Oct 2026
23 Sept 2026
17 Oct 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance in drain & without service road with its disoposal, ramming & dressing i/c lift up to 1.5 m & lead upto 30 m | 59.5 | Cum | 134.77 | ₹8,018.82 |
| 2 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 15 | Cum | 1,594.5 | ₹23,917.5 |
| 3 | Slip clearance (by manual means) of earth and boulders including disposal complete as directed by the Engineer-in-charge. | 72.75 | Cum | 260.5 | ₹18,951.38 |
| 4 | Clearing and Grubbing Road Land- Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means. In area of thorny jungle | 1,880 | Sqm | 11.04 | ₹20,755.2 |
| 5 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 352.65 | Cum | 436.9 | ₹1,54,072.78 |
| 6 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 12 | Cum | 4,197.46 | ₹50,369.52 |
| 7 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5) | 271.4 | Cum | 4,741.34 | ₹12,86,799.68 |
| 8 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 PCC Grade M-10 (Nominal mix 1:3:6) | 24.19 | Cum | 7,177.29 | ₹1,73,618.65 |
| 9 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C grade M 20 | 9.65 | Cum | 8,845.1 | ₹85,355.22 |
| 10 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 (The reinforcement steel shall be procured from riginal (primary) steel producers as per clause no. 2011.3.1 of MORD specifications (First revision'2014) and IS 1786:2008 clause no. 1.6) | 0.91 | Tonne | 71,591.2 | ₹65,147.99 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BOQ_118466.xls
BOQ • 0.23 MB
letterc.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .