Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 CrAccepted-AOC NO 22 7TH FLOOR V K KALYANI SANKEY ROAD BANGALORE BANGALORE KARNATAKA 560020 UDYAM KR 03 0069549 | BENGALURU URBAN | KARNATAKA | 560020 | ₹11.8 Cr Quoted ₹10.5 Cr | L1 | Accepted-AOC 2.28 percent lower than PAC |
| 2 | L2₹19.0 CrRejected-AOC A 1526 27 GREEN FIELDS COLONY FARIDABAD HARYANA 121 001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | ₹19.0 Cr | L2 | Rejected-AOC 78.42 percent above PAC |
| 3 | L3₹20.6 CrRejected-AOC CMS LAKE CENTRE BHANDUP WEST MUMBAI MAHARASHTRA 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | ₹20.6 Cr | L3 | Rejected-AOC 79.52 percent above PAC |
| 4 | Rejected-Technical | - | - | Rejected-Technical PQ conditions not complied |
| 5 | Rejected-Technical AROOR P O ALAPPUZHA KERALA 688534 | ALAPPUZHA | ALAPPUZHA | KERALA | 688534 | - | - | Rejected-Technical PQ conditions not complied |
Tender Value
Refer Docs
EMD Value
₹5 L
Closing Date
6 Jul 2022, 11:00 amClosed
The Chief Engineer(TSO)
O/O The Chief Engineer (TSO), LD Centre, HMT Colony PO,Kalamassery,683503
Supply, Installation, Testing and Commissioning of IT solution as part of Scheduling, Accounting, Metering And Settlement of Transaction(SAMAST)Framework in Kerala
2022_KSEB_485619_1
CESO/Tech/EP-01/SAMAST Part II/22-23
Open Tender
Electrical Works
180 days
SLDC, Kalmassery
Eligibility conditions of Pre Qualification is given in the Tender
7 documents required · 7 mandatory
₹17,700
Yes
₹5 L
Yes
SLDC Conference hall, Kalamassery
11 Apr 2023
6 Apr 2022
7 Jul 2022
6 Apr 2022
6 Jul 2022
20 Apr 2022
6 Apr 2022 - 12 Apr 2022
12 Apr 2022
Amount
Supply, installation, Testing and Commissioning of Server Hardware, Networking and Communication components consisting of 1.1 Data Center at SLDC including i) Hyper converged infrastructure (HCI) system for complete virtualization of storage, processors and memory. ii) Networking including Firewall, Router & Switches. iii) Smart Rack consisting of Precision AC and fire Protection Sytem iv) GPS with display for time synchronisation
Substation Side Components including i) Network Gateway and Switch
ii) Supply and wiring using CAT6 Cable 10metre per station
iii) Supply and wiring using using FO Cable 10metre per station
Cloud based hosting for DR/BCP from MeitY-empanelled CSP for 5 years with Cyber Security features including 2 nos of ILL(internet Leased Line) Connectivity of 50Mbps
Design, Development, Supply, installation, Testing and Commissioning of Software Modules consisting of 3.1 Advanced Metering Infrastructure (AMI) Module 3.2 Intrastate Scheduling & Dispatch System and intrastate Deviation Settlement Mechanism (DSM) 3.3 SLDC Web portal, Web applications for Data Collection, Automation, Open Access transactions, Energy Accounting, Generation of various Reports, Financial transactions, Accounting and payment gateways and integration of the aforementioned modules.
Design, Development, Supply, installation, Testing and Commissioning of Software Module for i) Demand forecasting & Monitoring with supply of geographical weather network data, energy exchange & Marketing operation interface
ii) RE forecasting & Monitoring
iii) Price forecasting & Monitoring
Rate for Change Requests for 1000 man days
AMC/ ATS for First year
AMC/ ATS for Second year
Synergy Systems and Solutions
CMS Computers Ltd
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid