Tender Value
₹37.3 L
EMD Value
₹38,000
Closing Date
15 May 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer
Constructing VRB At chainage 820 m Of karjan Dam Approch road ,Ta.Nadod, Dist.Narmda
298125
2 of 2026-27
Open
Civil - All
Narmada
7 documents required · 6 mandatory · 1 optional
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹38,000
1 May 2026
1 May 2026
1 May 2026
15 May 2026
1 May 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so
far as it is otherwise provided under the Contract, include all constructional
plant, layout, supervision, materials, erection, maintenance, insurance, profit,
taxes and duties, together with all general risks, liabilities and obligations set out
or implied in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included in
the items provided in the priced Bill of Quantities, and where no Items are provided
the cost shall be deemed to be distributed among the rates and prices entered for
the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause 29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILLOFQUANTITIES
(A) PercentageRateTender(Up toINR50Cr.)
Name of Work: - Constructing VRB At chainage 820 m Of karjan Dam Approch road
,Ta: Nadod, Dis:Narmda
Item DescriptionofItem(withbrief Quantity Unit RateIn Amount
No specification and reference to book of figures
specifications)
1 Dismantling the existing brick masonry 93.54 cmt 750.90
including sorting out and stacking the useful
material and removing the debris and making
good the damages etc. complete as directed.
InCement Mortar
2 Dismantling the existing foundation concrete 39.72 cmt 1155.20
including sorting out the dismentalled stuff and
stacking the useful material, removing the debris
and making good the damages etc. complete as
and where directed. Cement Concrete
3 Excavation for foundation in all sorts of soil 172.45 cmt 102.40
including yellow sandy gravelly soils ,soft &
hard murrum etc. in dry condition including
depositing the excavated stuff in uniform layers
in banks or as and where directed etc. complete
for lead up to 500m and all lift. (BY
MACHINERY) Excluding dewatering.
4 Backfilling the foundation trenches around the 128.00 cmt 36.90
structures etc with selected excavated stuff
including watering, ramming, compacting etc.
complete. (By Machinery).
5 Providing & Laying in position "NOMINAL 36.56 Cmt
MIX" cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and excluding
cost of steel reinforcement. A) For Foundation
concrete / General purpose (j) For Wing wall /
Return wall / Head wall / Coping etc.C. C.
Nominal Mix, M-15 and MSA 20 mm
6 Providing & Laying in position "NOMINAL 418.45 Cmt 4296.00
MIX" cement concrete using cement, sand and
crushed aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary formworks
centering, scaffolding, compaction by vibrator,
curing as directed with all lead & lift etc
complete Without Dewatering and excluding
cost of steel reinforcement. (A) For Foundation
concrete / General purpose (f) C. C. Nominal
Mix, M-20 and MSA-20 mm)
7 Providing and supplying ISI Standard R.C.C. 50.00 rmt 14258.00
pipes(of Sulphate Resisting Cement) in standard
lengths of following class and diameter suitable
for either collar joints or rubber ring joints
including all taxes, insurance, transportation,
freight charges, octroi, Inspection charges,
loading, unloading, conveyance fo departmental
stores, stacking etc. with Lowering, laying and
jointing R. C. C. pipes in C. M. 1:1 1/2 of
following diameters in proper position, grade
and alignment at all level as directed by
Engineer-in-charge including conveyance from
stores to site of work, labour, giving hydraulic
testing as per ISI Code (NP3-1800mm Dia)
8 Providing and placing in position reinforcement 7.250 mt 82019.00
bars including cutting, bending, welding joints
where as per drawing for all leads and lifts. (A)
TMT/CRS (Fe 500)
9 Providing and fixing in position ( different 10 rmt 5955.30
diameter ) I.S.,NP-3 class reinforced pipe with
caulking the joints with cement mortar 1:1
proportion,using jute string soaked in cement
slurry,finishing joints and laying pipes to the
designed grade and levels, curing etc.complete
for all leads and lifts. S 8 (g) NP-3 class
10 Earthwork/Back filling with selected earth 1500 cmt 144.50
including watering ramming,Compaction with
pnuematic temping with all lead and all lift etc
11 Providing and laying 20 mm thick mix seal 8.51 mt 3785.59
surfacing using stone chipping and aggregate
and asphalt grade VG-30 for mixing at the of
5.09% of total mix including heating the
aggregate and asphalt by drum mix plant and
spreading the same by paver finisher and
consolidation with vibratory roller including
providing all materials, equipment, tools and
plants, oil, keroscene, firewood, labour charges
12 Clearing the canal Banks outer and inner Slopes 1500.00 Sq.mt 10.30
by Jungle Cutting ,removing Vegetation,
Ghabajaria,Trees,etc. along with burning it's and
carrying away as and where required and as
directed etc. completed by machineries.
I/We am/are willing to carry out the work at… ...................... % above/below percent(Should
be written in figures and words) of the estimated rate mentioned above. Amount of my /our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
(A) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item (with brief Quantity Unit Rate Amount
No specification and reference to
specifications) figures Words
(A) Total Tendered Amount
(B) Rebate on above tendered amount (if any) % (in figure) ……………………………… (in
(C)Net Tendered Amount (A-B) (in figure) ………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as
per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Contractor. Deputy Executive Engineer Executive Engineer
Irrigation Pro. Sub Division No.27 Irrigation Project Division No.4
Rajpipla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
vrb boq.pdf
vrb Dtp upload.pdf
vrb tech spec.pdf
NIT vrb.pdf
Download all tender documents and submit your bid