Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
20 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (O&M) BHARUCH CITY DIVISION
Tender for Maintenance of various capacity of transformer at various location of Bharuch Rural Sub division under jurisdiction of Bharuch City Division.
364395
37/2026- 27
Open
Electrical and Maintenance Works
Works
Bharuch
4 documents required · 4 mandatory
₹2,360
Executive Engineer(O&M),DGVCL Bharuch City Division Office
₹20,000
7 Nov 2026
7 Nov 2026
7 Nov 2026
20 Nov 2026
7 Nov 2026
365 days
Schedule-B for Maintenance of various capacity of transformer at various location of Bharuch
Rural Sub division under jurisdiction of Bharuch City Division.
Sr. No. Description Unit Cost of Lab Total
1 Labour charge for providing of HT/LT bushing goti if No.
1.1 Replacement of LT bushing goti/ Rubber washer Up to NO
1.2 Replacement of LT bushing goti/ Rubber washer 200 NO
1.3 Replacement of HT bushing goti/ Rubber washer No.
2 Providing of half stud (Including 2nos Nut & 2nos No.
Washer) on LT side up to 100 KVA TR if required
2.1 Providing of half stud (Including 2nos Nut & 2nos No.
Washer) on LT side 200 KVA TR if required
3 Providing of AL. Patta with nut bolt washer on LT side No.
up to 200 KVA TR if required
4 Providing of AL. Patta with nut bolt washer on LT side No.
500 KVA TR if required
5 Check and tight earth connection, if required provide LS
lugs & nut-bolt to the neutral terminal of TRF and to
the body terminal of TRF and dist box earth
6 Replacement of damage LT cable with new one of right No.
capacity (cable provide by DGVCL)
7 Providing of new termination in form of R,Y,B and
N core including PVC tape
7.1 Termination of 25 Sq.mm cable (Hex or 3D make) No.
7.2 Termination of 50 Sq.mm cable (Hex or 3D make) No.
7.3 Termination of 70 Sq.mm cable (Hex or 3D make) No.
7.4 Termination of 95 Sq.mm cable (Hex or 3D make) No.
7.5 Termination of 120 Sq.mm cable (Hex or 3D make) No.
7.6 Termination of 150 Sq.mm cable (Hex or 3D make) No.
7.7 Termination of 185 Sq.mm cable (Hex or 3D make) No.
7.8 Termination of 240 Sq.mm cable (Hex or 3D make) No.
7.9 Termination of 300 Sq.mm cable (Hex or 3D make) No.
8 Measurement of voltage and ampere during maximum Per
load period minimum 10 nos. of T/C per day Job
9 Chek oil leakage from drain of valve /gasket/tank leak NO.
etc. and if leakage found at attend by providing
adhasive material,m-seal,and give detail of leakage and
topping of oil to maintain proper oil level (oil provide
10 Checking and replacement of LT Dist box if
required (Dist box provide by DGVCL)
10.1 Fixing of new dist. Box with complete wiring including No.
clamps, nut bolts etc
10.2 Replacement of detoriarated/providing LT dist. Box No.
with new up to 100 KVA capacity & crediting it to store.
10.3 Replacement of detoriarated/providing LT dist. Box No.
with new above 100 KVA capacity & crediting it to
11 Checking and replacement of HRC fuse base if
required (kit- kat fuse base provide by contractor
11.1 Fixing Up to 100 amp kit-kat fuse No.
11.2 Fixing Up to 200 amp kit-kat fuse No.
12 Checking and replacement of HRC fuse base if
required (HRC fuse base provide by contractor on
12.1 630 amp HRC fuse base No.
12.2 400 amp HRC fuse base No.
12.3 250 amp HRC fuse base No.
13 Checking and replacement of HRC fuse bridge if
required (HRC fuse provide by contractor on std.
13.1 630 amp HRC fuse No.
13.2 400 amp HRC fuse No.
13.3 250 amp HRC fuse No.
14 Providing of proper size of fuse element on HT side (on No.
D.O. fuse with cleaning of horns)
15 Providing and replacement of sundry items like LS
nut,bolt,washer etc. of appropriate size
16 General condition JOB
16.1 Clean off all dirt etc from the body of the transformer
and tighten all nut-bolt etc.
16.2 Clamping of LT cable as per instruction of incharge
16.3 Cleaning of surronding area nearby transformer center,
treeming of tree branches, removing of crimpers etc.
16.4 Submission of the all activity done at location wise in
prescribed proforma format with signature of incharge
of supervisor and contractor
16.5 Providing of breather if not available with transformer
(breather to be provided by DGVCL)
16.6 Providing of insulated jumper at HT side from D.O. fuse
out side to TC. All three nos. (Jumper wire will be
provided by DGVCL)
17 Supply & providing of neutral earthing using G.I. strip No.
(Size 25 mm x 3mm flat) to neutral terminal of X'mer
and disl. Box neutral terminal with 3 Mtr PVC rigid
pipe. 20 Kg solt + 20 Kg coal. G.I. strip should be
brought proper shape up to the equipment (Earth
resistance to be measured and earth resistance to be
18.1 LT Side Brass half stud with 2 no brass nut & washer of No.
18.2 LT Side Brass half stud with 2 no brass nut & washer of No.
19 LT Side Brass Nuts and washer
19.1 12 mm Brass LT side nuts No.
19.2 20 mm Brass LT side nuts No.
19.3 30 mm Brass LT side nuts No.
19.4 12 mm Brass LT side washer No.
19.5 20 mm Brass LT side washer No.
19.6 30 mm Brass LT side washer No.
20 Breather JOB
20.1 Breather plastic transparent body cast metal cap and No.
bottom, 1/2'' thread pipe,250 grams.( Dry gel weight
20.2 Breather plastic transparent body cast metal cap and No.
bottom, 1/2'' thread pipe,500 grams.( Dry gel weight
21 SMC FUSE BOX Without Fuse as per atteched drawing No.
to Accommodate HRC Fuse of 200 Amp and Above with
all mounting accessories ,nut,bolts,clamps,etc..
22 Supply and Installation of 11/22 kV Distribution PER
Transformers HT Terminal protector (UV Resistance) with SET
using 95/120/150 sq.mm long barrel aluminum lug. (1Set
= 3 Nos i.e. on R, Y, B)
In word: Twenty Lacs Only (GST EXTRA)
Executive Engineer
DGVCL, Bharuch City
1 The rates required with all taxes but exclusive of GST.
2 Party has to work at his own risk.
3 The contractor has to collect all the required materials from DGVCL store as well as credit the
dismantle material to the DGVCL store at their cost.
4 Contractor should have to provide safety tools while working at site.
5 Contractor has to fill up locationwise Transformer Maintenanace Proforma at a time of
maintenance (Profoma provided by DGVCL)
6 Contractor has to fill up date wise, locationwise report as per Provided Proforma (Monthly
Data- Hard copy as well as Soft copy)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Notice-37 BRHR.pdf
GEN CONDITION T-37.pdf
Schedule B TC maint T-37.pdf
TERMS AND CONDITION T-37.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .