Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹31.0 L
EMD Value
₹32,000
Closing Date
23 Oct 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer Nadiad Irrigation Division Nadiad
Repairing and Restoration work of Rahtalav SM Ex. Boriavi Distry Part II
353923
Tender Notice No. 08 of 2026-2027
Open
Civil - All
Works
Kheda
13 documents required · 12 mandatory · 1 optional
₹1,500
Executive Engineer Nadiad Irrigation Division Nadiad
₹32,000
9 Oct 2026
9 Oct 2026
9 Oct 2026
23 Oct 2026
9 Oct 2026
BILL OF QUANTITIES
Name of work - Repairing and Restoration work of Rahtalav SM Ex. Boriavi Distry Part II.
Item Item of work Unit Qty. Rate Amount (Rs.)
Clearing the shrubs, like akadas, weeds and other
vegetables including depositing the same outside
1 and burning etc. complete from canal bed, top and Km 1.86 5776.00
both slopes of the banks, for canal with discharge.
For Canals Below 20 Cusecs
Clearing the silt from the canal/drain bed by a
digging the same to the required bed level and
gradient including depositing the excavated earth
2 regularly in spoil bank for utilizing the same Cu.M 921.00 173.30
preparing the banks after breaking clods as and
where directed for all leads and lifts. For Canals
Below 20 Cusec. & 0 to 1.5 m lift.
Dismantling the existing brick masonry including
sorting out and stacking the useful material and
3 removing the debris and making good the damages Cu.M 27.00 750.90
etc. complete as directed. In Cement Mortar
Dismantling the existing RCC Pipes including sorting
out and stacking of the useful materials of the
4 following diameters including refilling the trenches Meter 10.00 577.60
etc. complete as directed. (i) NP-2 Pipes (b) 450 mm
Dismantling the existing foundation concrete
including sorting out the dismentalled stuff and
5 stacking the useful material, removing the debris Cu.M 4.00 1155.20
and making good the damages etc. complete as and
where directed. Cement mortar
Dismantling the CC Lining including disposing off the
6 dismentalled materials as directed etc. complete (a) Sq.M 2274.00 86.50
Excavation for foundation in all sorts of soil inclu.
yellow sandy gravelly soils, soft & hard murrum etc.
in dry condition inclu. depositing the excavated stuff
7 in uniform layers in banks or as and where directed Cu.M 377.00 102.40
etc. complete for lead up to 500 m and all lift. (BY
MACHINERY) Excluding dewatering
Item Item of work Unit Qty. Rate Amount (Rs.)
Providing & Laying in position "NOMINAL MIX"
cement concrete using cement, sand and crushed
aggregate by mass and machine mix for C.C./R.C.C
work incl. necessary formworks centering,
scaffolding, compaction by vibrator, curing as
8 directed with all lead & lift etc complete Without Cu.M 17.00 3935.00
Dewatering and excluding cost of steel
reinforcement. (c) C. C. Nominal Mix, M-15 and
Providing and laying burnt brick masonary in
foundation ordinary portland cement mortar 1:5
9 proportion inclu. curing etc. complete for all leads Cu.M 68.00 5040.10
and lifts. (Conventional bricks)
Providing cement plaster in thickness and proportion
as under inclu. smooth finishing, curing, scaffolding
etc. complete for all leads and lifts. Cement mortar
1:3 proportion. 12 mm thick.
Providing and fixing in position(different diameter)
NP-2 RCC pipe with colllar including filling and
caulking the joints with cement mortar 1:1
11 proportion, finishing to design grade and levels Meter 10.00 1366.60
curing etc. complete for all leads and lifts. d. NP-2
class 600 mm dia pipe
Earth work in embankment using selected soil, soft
& hard murrum excavated from approved borrow
area / village tanks etc. Including conveying,
spreading in uniform layers, breaking clods and
dressing to the designed canal section etc. with lead
upto 500m and all lifts
(for canals having capacity up to 300 Cusec) ( By
Compaction for making embankment for canal by
laying in regular layers of 15 cm in thickness
13 including breaking clods to 25 mm size incl. light Cu.M 2790.00 27.70
rolling by suitable rollers with slight watering to
facilitate rolling and dressing the side slopes etc.
Providing and laying plain / reinforced cement
concrete lining of Nominal Mix, M-15, (MSA-20
mm) in bed, side slopes and curvature, including
mixing, transporting, placing, vibrating, smooth
finishing, curing, including dewatering where
(MANUALLY WITH CONVENTIONAL MIXER ) (A)
cm thick lining in bed/slope - with water curing.
Item Item of work Unit Qty. Rate Amount (Rs.)
Providing groove and filling expansion joint of size
12 mm wide and 25 mm deep in canal lining during
15 construction with two coats of primer and filled with Meter 1510.00 34.70
bituminious and fine sand in proportion of 2:1 as
directed etc. complete.
Manufacture, supply and erection of vertical gate
consisting gate leaf, stiffeners, rubber seal,
embedded parts as shown in drawings inclu. cost of
materials, fabrication, painting, errection in position
with all accessories second stage concreting etc.
complete as per drawing and specifications.
Rs. Thirty One Lac One Thousand Five Hundred Sixty Four & Fifty Six Paise Only
I/ We am/ are willing to carry out the work at……………………………. % above/ below percent (Should be written in
figures and words) of the estimated rate mentioned above. Amount of my/ our tender works out as under.
Estimated amount Estimated amount
Deduct : ______ % Below Rs. _______________ Add: ______ % above Rs.
Net Tender amount Rs. ______________ Net Tender amount Rs.
Note 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
Note 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Note 3 - GST and Income tax TDS will be deducted at a source while making payments of bills
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.:
PRC 10/ 2017/ CementConsumption/ 16/ C, Date. 11/05/2017 as stated in S.O.R. therefore in R.C.C. items
where there is a change as per actual mix design, the cost of difference of cement consumption have been
deducted from the rate of original item at the rate of input rate mentioned in all the tender.
Deputy Executive Engineer
Nadiad Irrigation Sub Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 - Front Page _.pdf
2 - Tender Notice _.pdf
3 - SBD Book _.pdf
4 - BOQ _.pdf
5 - Cement _.pdf
6 - Steel.pdf
7 - PA _.pdf
8 - Other Specations _.pdf
9 - Itemwise Spec _Rahtalav.pdf
10 - Test Schedule.pdf
Tender Notice No. 08 of 2026-2027.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .