Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
7 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM(P and P)-UC
FACT Ltd Udyogamandal Complex Kochi - 683501.
Miscellaneous Mechanical works in connection with ATA-2026 at 300 TPD and 150 TPD NP Plants of FACT-UC.
2026_FACT_895197_1
3012/2025-2026/E32947
Limited
Miscellaneous Works
Item Rate
90 days
Udyogamandal
This tender is issued on limited tender basis and offers shall be accepted from the vendors on whom the enquiry is issued. Vendors interested in getting our future enquiries may contact Projects and Planning -UC FACT Udyogamandal.
5 documents required · 5 mandatory
₹0
₹5,000
Yes
9 Feb 2026
23 Jan 2026
9 Feb 2026
23 Jan 2026
7 Feb 2026
23 Jan 2026
Miscellaneous Mechanical works in connection with ATA-2026 at 300 TPD & 150 TPD NP Plants of FACT-UC.
Dismantling & fixing back of NH3 ,Drier&Dust scrubber accessories work includes:- dismantling and fixing back of (a) 6 no's of 3'' Nozzle with 8'' flange and 3'' hose & 6'' ring pipe of Ammonia Scrubber, (b) Scrubber pumps suction & discharge headers end dummies (c) Square dummy of ASST (d) Round dummy with nozzle and bend,1.5'' ring pipe & bottom square dummies of Ammonia scrubber venture,(e) 8 no's of 3'' nozzle with rubber hoses, venture area square & round dummies and U-bends of both Dust & Drier scrubbers,(f) Primary & Secondary elevator Top covers, Inspection doors of Dust & Drier fans including any other minor related activities as instructed by the Engineer in charge in 300 TPD NP Plant.
Dismantling & fixing back of Fume&Drier scrubber accessories work includes:- dismantling and fixing back of (a) 8 nos. each 2'' nozzles with hose,4'' end dummies & venture plugs,4 nos.of venture dummies,5 no's of square dummies and bottom bend and dummy of Drier and Fume scrubbers,(b) 2 no's covers of chain mills (c). inspection doors and drain hoses of Drier, Fume & Dust fans (d). 4 no's suction headers,10 nos. header end dummies,2 no's inter connection dummies and pumping lines with valves of Scrubber Circulation Pump including any other minor related actvities as instructed by the Engineer in Charge in 150 TPD NP plant.
Dismantling & Fixing back of Fluorine Scrubber accessories work includes :- dismantling and fixing back of (a) 6 nos. 3'' nozzle with 8'' flange and 3'' hose & 6'' Ring pipe (b). Round dummy (600mm) with outlet line (10'') and bend of Fluorine Scrubber in 300 TPD NP Plant.
Dismantling and Fixing back of dummies in duct lines at various level up to 200mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
Dismantling and Fixing back of dummies in duct lines at various level from 250mm to 600 mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
Dismantling and Fixing back of dummies in duct lines at various level above 600 mm of both the 150 & 300 TPD NP Plants (Rate shall be quoted for per piece)
Replacement of Product conveyor belts in 300 TPD work includes Materials take from store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After fixing of New belts on drum ,fixing back all dismantling items and trail run takes & sway to be adjusted as per the instruction of the Engineer in charge
Replacement of D D conveyor belts in 300 TPD work includes Material transportation from the store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After dismantling frame damaged portion shall be patched and idler roller base plate to be replaced. After fixing of New belts ,chain drive to be aligned, fix back all dismantled items and trial run to be taken & sway to be adjusted as per the instruction of the Engineer in charge.
Replacement of Long Product conveyor belt in 150 TPD work includes Materials take from store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. , cleaning of the dismantled items. After fixing of New belts on drum ,fixing back all dismantling items, head drum and tail drum bearings to be inspected and replaced if required and trail run shall be taken & sway to be adjusted as per the instruction of the Engineer in charge
Replacement of D D conveyor belt in 150 TPD work includes Material transportation from the store, Dismantling of damaged belts, carrying idlers ,return idlers ,supporting plates & structural members , seal strips,etc. After dismantling frame damaged portion shall be patched, all idlers shall be cleaned and idler roller base plate to be replaced if required. After fixing of New belts ,chain drive to be aligned, fix back all dismantled items and trial run to be taken & sway to be adjusted as per the instruction of the Engineer in charge.
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Termsandconditions32947.pdf
Tender Documents • 15.01 MB
compliancestatement32947.pdf
Tender Documents • 9.41 MB
BOQ_940949.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .