Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.6 LAccepted-Finance | L1 | Accepted-Finance Work awarded | |
| 2 | L2₹95.7 L+₹14,000 (0.15%)Accepted-Finance | L2 | Accepted-Finance Work awarded to L1 | |
| 3 | Rejected-Technical A 103 OM GANESH KRUPA CHS MIRA ROAD EAST THANE 401107 | MIRA ROAD | THANE | MAHARASHTRA | 401107 | - | Rejected-Technical Technically Non- Responsive | |
| 4 | Rejected-Technical A 4 TARINI APARTMENT PHASE I KILBURN COLONY HINOO DISTT RANCHI JHARKHAND 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | - | Rejected-Technical Technically Non- Responsive |
Tender Value
₹96 L
Closing Date
7 Jun 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Addl. Chief Engineer
WAPCOS Limited Gurgaon
Tender for Supply of Clay from Raithal (near Mokalsar), Jalore, Rajasthan
2023_WAPCO_156115_1
WAP/CMU-II/Indroka/Clay/23/19
Open Tender
Civil Works
Item Rate
15 days
Indroka
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
13 Jun 2023
2 Jun 2023
8 Jun 2023
2 Jun 2023
7 Jun 2023
2 Jun 2023
2 Jun 2023 - 5 Jun 2023
Amount
Supply of clay earth material from designated borrow area at Raithal (near Mokalsar) District Jalore, including cost of material, excavation, loading, transporting, unloading, stacking and levelling of material at Indroka Dam site, complete in all respect. Note: a. Measurement of payable quantity shall be done on the basis of volume of pit excavated (excluding stripped top soil material) i.e. Bank volume at designated borrow area. However, the bank volume shall not exceed the volume measured after compaction at site by the construction agency. In case clay material is not compacted by the construction agency then the bank volume shall be co-related with the stack measurement after deduction of swell factor of the clay material. b. The rate shall be inclusive of stripping of top soil (min. 300 mm thick) to be removed for excavation of suitable clay material and disposal of stripped material at suitable place to satisfaction of Engineer-in-Charge. c. The rate shall be inclusive of GST (as applicable), Short Term Permit (STP) fee, Statutory charges to the State Government, Royalty charges, cost of material to be excavated, excavation, loading, transportation, enroute toll, stacking and levelling at Indroka Dam site. d. The proof of submission of Royalty charges paid on account of material excavation and vehicle challan receipt on account of transportation done, shall be submitted by the contractor, for verification.
Supply of clay earth material from designated borrow area at Raithal (near Mokalsar) District Jalore, including cost of material, excavation, loading, transporting, unloading, stacking and levelling of material at Indroka Dam site, complete in all respect as described above.
BERAD CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .