Loading…
Loading…
Tender Value
₹12.4 L
EMD Value
₹12,366
Closing Date
24 Jul 2026, 3:05 pmClosed
Sri Veera Venkata Satyanarayana Swamy Vari Devasthanam
Annavaram
Water leakage & Improvements of Circular Building and lockers room at uphill.
959860
E-81991
OPEN - NCB
Civil Engineering Works
KAKINADA, ANDHRA PRADESH
9 documents required · 9 mandatory
₹438
₹12,366
9 Jul 2026
9 Jul 2026
9 Jul 2026
Dismantling, clearing away and unuseful materials for not re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete Through scraping of old plastered surface
SPECIALISED INJECTION GROUTING WITH CEMENT AND CRYSTALLIZATION ADMIXTURES :a]. Drilling of holes with power drilling machine to the required depth [12mm to 14mm dia holes]b]. Fixing of Rubber Nozzles with cement and quick setting, Rapid hardening compound putty Rapidstrong qs or equavalent c]. Grouting of holes with 140 PSI Grout pump with cement slurry mixing with Specialized crystallization compound-Roofex gp or equavalent @ 5% by weight of cement.d]. After completion of grouting,Remove the Rubber nozzles e]. Later sealing of the hole withpolymer cement putty
Supply& Application for wall dampness water proofing work i.e, application process 1.Existing wall scrapping & hand cutting machine to cracking cutiing area . 2. To fill gaps crack seal powder and apply the Brushbond coating two coats & apply final coat Roof guard for finished item of work etc , complete . Using chemical contents Rendroc CS & Brush bond Roof Guard etc
Supply& Application for Epoxy for Ceramic floor tiles joints i.e, application process 1. Drilling of holes with power drilling machine to required depth 12mm to 14mm dia holes . 2.Fixing of Rubber nozzles with Render plug settings 3. Grooving of holes with 140 Pieger grout pump with cement and SBR , Conplast , SBEX -100 , Mixing after completion of grouting . 4.And then after ONE hour tiles joint cutting and water wash for 4mm grooving . 5. after 3Hrs applying epoxy for total grooves . 6. Finally cleaning total surface tiles floor area with using sponge finishing and chemical contents use NITOBOND SBR , CONPLAST , CEBEX-100 ,Render plug , MYK LATICRETE SP-100 epoxy . Finished item of work
SPECIALISED POLYSULPHIDE / POLYURETHANE / HIGHBRED ACRYLIC /SEALANT TREATMENT TO THE OLD / EXISTING EXPANSION JOINT IN THE TERRACE, COLUMN, BEAM 1. Cut and remove the existing expansion joint in the screed for a minimum width of 200 mm and a depth of screed ( up to the mother slab) by using diamond disc cutting machine and dispose the debris as per the department instruction. All elevated kerb wall both sides of the expansion joint along with the top free laying slab, cover etc as per the site conditions under the scope of the main contractor / client.2. Remove the existing filling for a minimum depth of 40 mm using sharp knife (approximate size 25 x 40 mm) as per the site condition.3. If the site condition allows to insert backer rod, remove the existing filling for a minimum depth of 70 mm from the top ( the clear filling of sealant should be 40 mm) and insert inside the joint. 4. Clean the surface with air blower up to receive a dust free surface and make sure the surface is sound dry or the moisture content is less than 5 %. 5. Apply one coat of PenetrativePrimer and allow touching dry. 6. Fill the joint by using a sealant gun / notch trowel as per site condition up to the required depth and width and allow to dry for a minimum period of 1 day as per the climatic condition.7. Apply two coat of penetrative sealer coat site mixed primer - mix with portable water and OP Cement in the ratio of 2:1:3 cement by using slow speed mixer machine with paddle for a period of 2 to 3 minutes up to receive a homogeneous mix) @ 1.000 Liter per SQM in the entire screed removed portion ( vertical and horizontal faces) of 200 mm along with saturated ( saturated with MixPRIME AC100: Water: OP Cement in the ratio of 2:1:1) in between the two coats and allow to cure for a period of 6 hours. 8. Do the necessary levelling plastering with cement sand mortar 1:2:4 (6 mm aggregate) screed along with the addition of MixBOND SBR Super and PLAST FIBER 3S as per the following for a minimum thickness of removal.a. Mix the MixBOND SBR Super @ 2 Liter / Bag Cement in the ratio of 1:4 Mortar ( Pre mix the admixture in the portable water for preparing the mortar)b Add 100 Gram PLASTFIBRE 3S in the above liquid and stirred well with a slow speed drill with paddle.c. Prepare the cement sand screed in the ratio of 1:2:4 with above prepared liquid for the suitable consistency.d. Necessary curing and drying for a minimum period of 4 days. 9. In wet condition, provide a dummy expansion joint on the top of the screed for a minimum size of 10 x 10 mm by using sharp trowel10. Apply one coat of Penetrative in the entire surface of the dummy joint and allow to touch dry for a period of 30 minutes. Fill the in the joint by using a sealant gun / notch trowel as per site condition up to the required depth and width
Supply & application for Rust proof for RCC Beams, & slabs etc i.e, application process . 1.Remove loose particles and clean the surface with wire brush .2. Apply Nitozinc primer of corroded steel. 3.After dry the Zinc paint apply Nitobond SBR ads bonding agent mix with Cement and water 1:2:2. 4.Then apply Rendroc SP40 as paster fix spalling area.
Plastering 20mm thick single coat in CM(1:3) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, excluding seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work .
Flooring with vitrified tiles with matt finish of size 600x600 mm and thickness between 9-10 mm 1st quality confirming to IS:13711,IS:13712,IS:13630 (Parts 1to 15) of any colur and finish in all shades and designs. as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) excluding cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc.,and overheads & contractors profit complete for finished item of work.
Flase Ceilling - Supply and fixing of False ceilling work with 15mm thick acoustical mineral Fiber board ceilling main support "T" with 24mm X 32mm and Main cross "T" and sub cross "T" with 24mmX24mm width with precoated G.I steel grid with necessary arragements like anchor bolts to slab and G.I wire, screws, bolt etc., complete with all labour charges as per following size.
Supply & application of two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,andcomplete for finished item of work in all floors.
Supply & application of two coats of acrylic exterior emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors.
Painting two coats with synthetic enamel paint Gr-II having VOC (Volatile Organic Compound) content less than 50 grams/litre to old iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
10 Boq - water leakages and impr to circular building.xlsx
TENDER_DOCUMENT • 0.02 MB
BID+Painting.docx
TENDER_DOCUMENT • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .