| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC | ₹35.9 L | L1 | Accepted-AOC LOWEST PRICE |
| 2 | L2₹36.5 L+₹53,915.94 (1.50%)Rejected-Finance | ₹36.5 L+₹53,915.94 (1.50%) | L2 | Rejected-Finance HIGHER BIDDER |
| 3 | L3₹36.9 L+₹93,454.29 (2.60%)Rejected-Finance | ₹36.9 L+₹93,454.29 (2.60%) | L3 | Rejected-Finance HIGHEST BIDDER |
Tender Value
₹35.9 L
EMD Value
₹72,000
Closing Date
31 Jan 2026, 1:00 pmClosed
Dy.CE(E)/IGWTP
IGWTP,MANIRAMPUR,BARRACKPOR
DEVELOPMENT OF THE CLARIFLOCCULATOR SYSTEM NO-4 AT 100MGD CLARIFIER PLANT, IGWTP
2026_KMC_983532_1
KMC/WS/IGWTP/087/25-26, DT-31/12/2025
Open Tender
MECHANICAL
Percentage
60 days
IGWTP, MANIRAMPUR, BARRACKPORE
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹72,000
IGWTP,MANIRAMPUR,BARRACKPORE
29 Jun 2026
8 Jan 2026
3 Feb 2026
8 Jan 2026
31 Jan 2026
16 Jan 2026
10 Jan 2026
PART-A
CHAPTER - VII MISCELLANEOUS ITEMS Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]
MATERIALS AND LABOUR ETC.(C)-(I) MISCELLANEOUS 28.Cleaning rubbish, sludge, weeds scum, liquid earth, mud etc.etc.from road side masonary drain/ hume pipe drain/ culvert etc. by mathor labour after removing concrete.Slab/manhole cover etc.without damaging the same and refixing the same properly after cleaning as necessary and removing thesludge etc.etc.by using iron pans,buckets including all labour, tools & plants including removing the spoils in dry condition and disposing thesame by truck beyond the road side in conformity with municipal/corporation rules for such disposal including loading into truck and cleaning the road side in all respects as per direction of the Engineerin- Charge. (Payment will be made on the basis of actual stack measurment of spoils in dry condition at roadside)
BUILDING WORKS (G) WOOD AND PVC WORKS C. MISCELLANEOUS WOODWORK 1 A. Wood work in posts, post plates, rafters, battens, truss members, purlins etc.fitted and fixed complete (excluding the cost of bolts, paints, but including the costof nails, screws etc.) (The quantum should be corrected upto three decimals) (ii) Sal : Local. Note: Extra for Lifting Charges:-i) upto 4th floor Rs. 200/- per Cu.m per Floor.ii) Above 4th floor Rs. 250/- per Cu.m per Floor.
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 1. M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length,fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof. I) For structural members of specified sections weighing less than 22.5 Kg./m (3rd Corrigenda & addenda dated 04.06.2018)
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 13. (a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows,railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) ((ii) Grill weighing above 16 Kg./sq.mtr and above. (MODE OF MEASUREMENT):-The weight of grill per sq.m. will be determined by taking the physical weight of fabricated grill and dividing the same by covered area of the same. N.B. No shop priming will be allowed to facilitate inspection of workmanship. Weight of grill is to be taken after final grinding and finishing the weld. (3rd Corrigenda & addenda dated 04.06.2018)
MANUFACTURING, SUPPLY & FITTING OF V-NOTCH FOR 100 MGD CLARIFIER PLANT WITH CUTTING AND MACHINING PROPERLY (DIMENSION-L-304.8MM, THICKNESS-4 MM,MOC-EN-24),ESTIMATE PURPOSE RATE APPROVED BY C.E.O & EX OFFICIO D.G(WS), DATED-11.12.18
CHAPTER - VII MISCELLANEOUS ITEMS Coating of 'Epoxy' Resin of thickness not less than 160 micron with a lowviscosity,crystallization-resistant epoxy resin base with a reactive diluents combined with high build epoxy amine adducts as per BS 5493 standard and a polyamide or amido polyamine or any other suitable hardener. It shall react with epoxy resin at normal ambient temperature, suitable for solvent-free coatings as per recommended proportion for use on metal,concrete and wood surface to protect from corrosion as well as damagefrom chemical reaction after making the surface free from dust, oil and moisture etc. all complete as per instruction and to the satisfaction of ElC. [This item will be operated on prior permission from the concerned SE/Dy Chief Engineer]
BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly b) Extra for additional 3.6 height or part thereof
BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed.
BUILDING WORKS ( C ) Brickworks,Concrete Works etc 10?. Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety. (3rd Corrigenda & addenda dated 04.06.2018)
SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar (a) 20 mm thick plaster
BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 17. 125 mm. thick brick work with 1st class bricks in cement mortar (1:3) in ground floor.
DISMANTLING STEEL WORK IN ALL TYPES OF SECTIONS UPTO HEIGHT OF 5M ABOVE PLINTH LEVEL EXCLUDING CUTTING OF RIVET AS PER TECHNICAL SPECIFICATIONS CLAUSE 202 FOR (A) INCLUDING DISMEMBERING
BUILDING WORKS (F) STRUCTURAL STEEL WORKS, GRILLS, GATES ETC. A. ORIGINAL WORKS 7. Supplying, fitting, fixing bolts with nuts, washer (i) 10 to 16 mm dia: (b) Length above 75 mm and upto 150 mm. (3rd Corrigenda & addenda dated 04.06.2018)
SUPPLYING OF FOLLOWING XLPE INSULATED ALUMINUM CONDUCTOR ARMORED CABLES OF 1.1KV GRADE AS PER IS 7098 (PART1) 1988 WITH UP TO DATE AMENDMENTS.(RATE IN RS. PER MTR)
Laying through Underground Trech.(a)Laying of one No. cable upto 35 sqmm in underground trench 460 mm wide x 760 mm average depth, with brick protection on the top of the cable with 8 (eight) Nos. bricks per metre, including filling the space between the brick & cable and also the trench with shifted soil, leveling up and restoring surface duly rammed
Supplying and fixing 240/415 V MCB of Breaking capacity 10kA & C characteristics on din rail of existing DBs and necessary connection Legrand TPN 40 A
Compression Glands.Supplying and fixing compression type gland complete with brass gland, brass ring & rubber ring FOR dust & moisture(proof entry of XLPE/PVC armoured cables as below : FOR 2 core.upto 50 sqmm
Finishing cable ends.(b)Finishing the end of following XLPE/PVC armoured cables by crimping method incl. supplying and fixing solderless socket (Dowels make), tapes, anticorrosive paste & jointing materials.3... core 50 sqmm cable
MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages.
Sum of Basic Prices (Sl No-1 to 32)
GST @ 18% on the Sum of Sl. No-33
LWC @ 1% on the Sum of Sl. No.33 and 34
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2399856.xls
BOQ • 0.27 MB
TECHBID.pdf
Tender Documents • 1.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .