Hire charges for providing temporary electrical illuminations during all the fairs & Festivals to SV temple at Rampachodavaram for the year 2026-27
980647
145/DE(Elec.)-I/TTD/TPT/2026-27
OPEN - NCB
Electrical Works
TIRUPATHI
7 documents required · 7 mandatory
₹93
26 Aug 2026
26 Aug 2026
26 Aug 2026
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For one day.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For one day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection with control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection with control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection with control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection with control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Five days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection with control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 10 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Supply, Transporation of Diesel Oil for DG set
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For One days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For two days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Three days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Five days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design.
2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS.
3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For One day.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Two days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For three days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Five days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For One day
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Two days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Three days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Five days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for supplying, fixing, wiring, servicing and maintaining Air Conditioner split / tower model type with necessary copper pipes, gas charging, wire / cable connections, controls etc., as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed - (Per TR) - For One day.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Single pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Erection and removal of Four pole Towers for erection of electrical illumination of MH fittings / Halozen fittings wherever necessary as directed during execution including providing necessary channels, bracings and necessary watch and ward against fire accidents. Per programme maximum of Ten days.
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deities, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For One day.
Note:- 1) The 6.2 V Bamboo stick designs of different deities, Arches & designs etc., where ever necessary are to be arranged the deities, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deities, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For Two days.
Note:- 1) The 6.2 V Bamboo stick designs of different deities, Arches & designs etc., where ever necessary are to be arranged the deities, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deities, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For Three days.
Note:- 1) The 6.2 V Bamboo stick designs of different deities, Arches & designs etc., where ever necessary are to be arranged the deities, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step-down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deities, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For Five days.
Note:- 1) The 6.2 V Bamboo stick designs of different deities, Arches & designs etc., where ever necessary are to be arranged the deities, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deities, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclusive of transportation, erection, testing and removing charges etc) - For Ten days.
Note:- 1) The 6.2 V Bamboo stick designs of different deities, Arches & designs etc., where ever necessary are to be arranged the deities, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.
2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.
3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ 145 NEW.xlsx
TENDER_DOCUMENT • 0.12 MB
145 NIT.doc
TENDER_DOCUMENT • 2.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].