Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Finance DUMRA KUMHAR TOLA POST NAWAGARH THANA BAGHMARA DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828306 | L1 | Admitted-Finance | ||
| 2 | L2₹1.7 L+₹5,131.71 (3.20%)Admitted-Finance AT HARINA GOMOH ROAD POST NAWAGARH DHANBAD DHANBAD 828306 JHARKHAND INDIA | DHANBAD | DHANBAD | JHARKHAND | 828306 | L2 | Admitted-Finance | ||
| 3 | L3₹1.7 L+₹9,541.78 (5.95%)Admitted-Finance SATYA NARAYAN GHOSH S O SHYAM SHANKAR GHOSH TUNDOO BARORA DHANBAD DHANBAD 828128 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828128 | L3 | Admitted-Finance |
Tender Value
₹1.9 L
EMD Value
₹2,400
Closing Date
13 Mar 2026, 3:00 pmClosed
Area Manager (EnM), B-II Area
General Manager Office, B-II Area
Repairing of fabrication and erection of drive unit gear box baseframe of another gear box fitting feeder breaker no- 3 ABOCP Mine under Block-II Area
2026_BCCL_355360_1
GM/B-II/AM (ENM)/E-TENDER/2025-26/343 dt 03.03.26
Open Tender
Electrical and Maintenance Works
Percentage
10 days
ABOCP Mine
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,400
17 Mar 2026
3 Mar 2026
14 Mar 2026
3 Mar 2026
13 Mar 2026
3 Mar 2026
3 Mar 2026 - 6 Mar 2026
Dismantling of damaged Gear box. (i)Supervisor 01 x 651 = 651.00 (ii)Fitter 01 x 906 = 906.00 (iii)Welder 01 x 778 = 778.00 (iv)Helper 02x 651 = 1302.00 (v) Tyndle 08 x 778 = 6224.00, Total = 9861.00
Oxygen + DA
Gouging electrode
Cleaning of gear box basefram for cutting & dismantling portion Supervisior 01 x 651 = 651.00 Helper 04 x 651 = 2604.00 Total = 3255.00
Dismantling cutting & withdrawal of old Gear box base frame (i)Supervisor 01 x 651 = 651.00, (ii)Fitter 01 x 906 = 906.00, (iii)Welder 01 x 778 = 778.00, (iv)Helper 02x 651 = 1302.00 , (v) Tyndle 08 x 778 = 6224.00 Total = 9861.00
Oxygen + DA
Gouging Electrode
Transporting of materials from scrap yard to working place. Supervisor = 1 x 778.00 = 778.00, Tyndle = 08 x 778.00 = 6224.00, Total = 7002.00
Cutting of material as per measurement required size, (i)Supervisor 01 x 651 = 651.00 (ii)Fitter 01 x 906 = 906.00, (iii)Welder 01 x 778 = 778.00, (iv)Helper 02x 651 = 1302.00 ,(v) Tyndle 04 x 778= 3112.00, Total = 6749.00
Fabrication of gear box baseframe and motor basefram as proper size. (i)Supervisor 01 x 651 = 651.00, (ii)Fitter 01 x 906 = 906.00, (iii)Welder 01 x 778 = 778.00, (iv)Helper 02x 651 = 1302.00, (v) Tyndle 04 x 778 = 3112.00, Total = 6749.00
Oxygen + DA
Welding electrode
Fitting of gear box and motor fixing at nut bolt & stopper by welding after installation . (i)Supervisor 01 x 651 = 651.00, (ii)Fitter 01 x 906 = 906.00, (iii)Welder 01 x 778 = 778.00 , (iv)Helper 02x 651 = 1302.00, v) Tyndle 08 x 778 = 6224.00, Total = 9861.00
Providing of nut bolt & washer for fitting at baseframe and gear & motor.
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.02 MB
BOQ_368203.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .