| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | ₹14.2 L Quoted ₹12.0 L | L1 | Accepted-AOC AOC IS AWARDED DUE TO L1 |
| 2 | L2₹12.2 L+₹17,351.39 (1.44%)Rejected-Finance VILLAGE GONNAN GARH DISTRICT AMROHA UTTAR PRADESH | AMROHA | UTTAR PRADESH | ₹12.2 L+₹17,351.39 (1.44%) | L2 | Rejected-Finance BID IS REJECTED DUE TO L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical BID IS REJECTED DUE TO NOT QUALIFIED IN TECHNICAL EVALUATION |
| Sl No | Description | Qty | Unit | M/S SHIV KUMAR CONTRACTOR L2 | JAGDESH PRASAD L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 42.73 | Cum | 65 ₹2,777.45 Lowest | 65 ₹2,777.45 Lowest |
| 2.00 | Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 12.69 | Cum | 5,228.7 ₹66,352.2 | 5,200 ₹65,988 Lowest |
| 3.00 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work | 49.19 | Cum | 5,589.25 ₹2,74,935.21 | 5,550 ₹2,73,004.5 Lowest |
| 4.00 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 31.35 | Sqm | 101.5 ₹3,182.03 | 101 ₹3,166.35 Lowest |
| 5.00 | Providing and fixing Centering & shuttering in Straight Portion of C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 18.56 | Sqm | 417 ₹7,739.52 Lowest | 417 ₹7,739.52 Lowest |
| 6.00 | Providing and fixing Centering & shuttering in Straight Portion of R.C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 46.38 | Sqm | 685 ₹31,770.3 Lowest | 685 ₹31,770.3 Lowest |
| 7.00 | Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work. | 13.8 | Cum | 6,750.7 ₹93,159.66 | 6,700 ₹92,460 Lowest |
| 8.00 | Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. complete for proper completion of work as per directed by engineer in charge. | 1.72 | Cum | 7,807.9 ₹13,429.59 | 7,800 ₹13,416 Lowest |
| 9.00 | S/L of Two coat Tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 8.78 | Sqm | 364.6 ₹3,201.19 | 364 ₹3,195.92 Lowest |
| 10.00 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate over angle iron welded contineously work including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 17.56 | RM | 1,267.5 ₹22,257.3 | 1,267 ₹22,248.52 Lowest |
Tender Value
₹12.3 L
EMD Value
₹61,000
Closing Date
8 Jun 2026, 11:00 amClosed
EE, MGCCD 14, GARHMUKTESHWAR
EE, MGCCD 14, GARHMUKTESHWAR
6 CONSTRUCTION OF V.R.B. AT KM 7.800 of Khazoori Minor
2026_UPIDC_1144240_11
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
60 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹944
₹61,000
7 Aug 2026
2 Jun 2026
8 Jun 2026
2 Jun 2026
8 Jun 2026
2 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth as per site requirement and with removal and proper disposal of surplus earth including all cost of material, labour, T&P etc. as per directed by engineer-in-charge for proper completion of work. | 42.73 | Cum | - | - |
| - | Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work | 12.69 | Cum | - | - |
| 3 | Ist class Brick work in 1:4, Cement Coarse Sand (F.M. Not less than 2.00), morter in warping i/c cost of material Labour & T&P etc complete for proper completion of work | 49.19 | Cum | - | - |
| 4 | Struck Pointing in 1:2 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work | 31.35 | Sqm | - | - |
| 5 | Providing and fixing Centering & shuttering in Straight Portion of C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 18.56 | Sqm | - | - |
| 6 | Providing and fixing Centering & shuttering in Straight Portion of R.C.C. work including cost of all material, labour, T&P, all lifts and leads, etc complete for proper completion of work as per directed by engineer in charge . | 46.38 | Sqm | - | - |
| 7 | Cement Concrete in (1:1.5:3) M20 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. as per directed by engineer in charge complete for proper completion of work. | 13.8 | Cum | - | - |
| 8 | Reinforced Cement Concrete in (1:1:2) M25 mix with Cement, Coarse Sand (F.M. not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc. complete for proper completion of work as per directed by engineer in charge. | 1.72 | Cum | - | - |
| 9 | S/L of Two coat Tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work | 8.78 | Sqm | - | - |
| 10 | Providing & Fixing 20mm thick Expansion Joint with angle iron both side & M.S. plate over angle iron welded contineously work including all cost of labour, material and T&P etc. complete required for proper completion of work or as Directed By Engineer in Charge. | 17.56 | RM | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.72 MB
6.pdf
Tender Documents • 2.37 MB
BOQ_2166768.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .