| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.2 LAccepted-AOC | ₹86.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹86.5 L+₹29,770 (0.35%)Rejected-AOC S O SHRI MANIK CH NARZARY VILL GHOSHKATA P O BANARGAON P S DOTMA DIST KOKRAJHAR BTC ASSAM | DOTMA | KOKRAJHAR | ASSAM | ₹86.5 L+₹29,770 (0.35%) | L2 | Rejected-AOC L2 |
| 3 | L3₹86.7 L+₹50,440 (0.59%)Rejected-AOC C O ANIL CHANDRA SAHA DOTMA P O P S DOTMA DIST KOKRAJHAR BTC ASSAM PIN 783347 | DOTMA | KOKRAJHAR | ASSAM | 783347 | ₹86.7 L+₹50,440 (0.59%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | Nabaraj Narzary L2 | Arjun Saha L3 | RONNEL ROBINSON MUCHAHARI L1 |
|---|---|---|---|---|---|---|
| 1.00 | 2.6 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil. | 320.36 | Cum | 208 ₹66,634.88 | 215 ₹68,877.4 | 205.45 ₹65,817.96 Lowest |
| 2.00 | 2.25(a) Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 204.88 | Cum | 372 ₹76,215.36 | 378 ₹77,444.64 | 368.65 ₹75,529.01 Lowest |
| 3.00 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 49.84 | Cum | 2,161.2 ₹1,07,714.21 Lowest | 2,161.2 ₹1,07,714.21 Lowest | 2,161.2 ₹1,07,714.21 Lowest |
| 4.00 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 19.35 | Cum | 7,365.15 ₹1,42,515.65 Lowest | 7,365.15 ₹1,42,515.65 Lowest | 7,365.15 ₹1,42,515.65 Lowest |
| 5.00 | 4.3.2 Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 39.06 | Sqm | 669.55 ₹26,152.62 Lowest | 669.55 ₹26,152.62 Lowest | 669.55 ₹26,152.62 Lowest |
| 6.00 | 4.1 Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 12.5mm nominal size derived from natural sources). | 46.62 | Sqm | 370.85 ₹17,289.03 Lowest | 370.85 ₹17,289.03 Lowest | 370.85 ₹17,289.03 Lowest |
| 7.00 | 4.17 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 55.77 | Sqm | 681.65 ₹38,015.62 Lowest | 681.65 ₹38,015.62 Lowest | 681.65 ₹38,015.62 Lowest |
| 8.00 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up Ito plinth level:
5.1.2 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded
stone aggregate 20 mm nominal size derived from natural sources). | 99.47 | Cum | 8,364.2 ₹8,31,986.97 Lowest | 8,364.2 ₹8,31,986.97 Lowest | 8,364.2 ₹8,31,986.97 Lowest |
| 9.00 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded
stone aggregate 20 mm nominal size derived from natural sources). | 15.56 | Cum | 10,185.05 ₹1,58,479.38 Lowest | 10,185.05 ₹1,58,479.38 Lowest | 10,185.05 ₹1,58,479.38 Lowest |
| 10.00 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 57.93 | Cum | 10,719.3 ₹6,20,969.05 Lowest | 10,719.3 ₹6,20,969.05 Lowest | 10,719.3 ₹6,20,969.05 Lowest |
Tender Value
₹86.2 L
EMD Value
₹1.7 L
Closing Date
17 Jun 2026, 2:00 pmClosed
Addl. Chief Engineer cum Director, PWD BTC
O/o the Addl. Chief Engineer cum Director, PWD, BTC, Kokrajhar.
Construction of Community Hall (Ground floor) at Revenue Village No. 1 Sapkhaiti under Ambagaon Mauza, Udalguri Circle office, Udalguri, BTR, Assam.
2026_BTC_52523_1
ACE-25/PWD/IFB/BTC/2025-26/77
Open Tender
Civil Works - Building
Item Rate
365 days
Udalguri
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,800
₹1.7 L
Yes
10 Aug 2026
28 May 2026
17 Jun 2026
28 May 2026
17 Jun 2026
28 May 2026
28 May 2026 - 17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 2.6 Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil. | - | Cum | - | - |
| 2 | 2.25(a) Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 204.88 | Cum | - | - |
| 3 | 2.27 Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 49.84 | Cum | - | - |
| 4 | 4.1 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
4.1.3 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 19.35 | Cum | - | - |
| 5 | 4.3.2 Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 39.06 | Sqm | - | - |
| 6 | 4.1 Providing and laying damp-proof course 40mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 12.5mm nominal size derived from natural sources). | 46.62 | Sqm | - | - |
| 7 | 4.17 Making plinth protection 50mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand (zone-III) derived from natural sources: 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 55.77 | Sqm | - | - |
| 8 | 5.1 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up Ito plinth level:
5.1.2 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded
stone aggregate 20 mm nominal size derived from natural sources). | 99.47 | Cum | - | - |
| 9 | 5.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded
stone aggregate 20 mm nominal size derived from natural sources). | 15.56 | Cum | - | - |
| 10 | 5.3 Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 57.93 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
SBD08.pdf
Tender Documents • 3.12 MB
BOQ_83006.xls
BOQ • 0.32 MB
FOB.pdf
Additional Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .