Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹86.2 LAccepted-AOC | ₹86.2 L | L1 | Accepted-AOC L1 bidder |
| Sl No | Description | Qty | Unit | Mathews Kollappally L1 |
|---|---|---|---|---|
| 1.00Ground Development work | ||||
| 1.01 | 2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.76 | Hecter | 47,502.26 ₹36,244.22 |
| 1.02 | 2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | 0.1 | Hecter | 49,592.63 ₹4,959.26 |
| 1.03 | od92950/2022_2023 : Excavation in soil by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. | 955 | cum | 182 ₹1.7 L |
| 1.04 | 3.19.1 : Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | 2,290 | cum | 73.61 ₹1.7 L |
| 1.05 | od75965/2022_2023 : SKF_OD 6/2022-2023 Sieving excavated Earth through 4.75 mm sieve and collecting the sieved earth in<br>stacks for measurement.<br> | 1,150 | cum | 179 ₹2.1 L |
| 1.06 | od75966/2022_2023 : SKF_OD 4/2022-2023Supplying and stacking for measurement Jamuna Sand at site including royalty<br>and carriage upto 5 k.m. lead complete | 382 | cum | 2,895 ₹11.1 L |
| 1.07 | od75967/2022_2023 : SKF_OD 2/2022-2023 Mixing earth and sand in the required proportion specified or directed by the Officer-in-charge | 1,525 | cum | 49 ₹74,725 |
| 1.08 | od75968/2022_2023 : SKF_OD 3/2022-2023 Spreading of earth and sand in required thickness as per direction of officer-in-charge (cost of earth and sand to be paid separately). | 1,525 | cum | 71 ₹1.1 L |
| 1.09 | od75969/2022_2023 : SKF_OD 10/2022-2023 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc. including all cost of labour, hire charges, fuel, oil, etc. complete. | 7,625 | sqm | 3.5 ₹26,687.50 |
Tender Value
₹78.6 L
EMD Value
₹50,000
Closing Date
28 Apr 2026, 3:00 pmClosed
The Chief Engineer, Sports Kerala Foundation
Jimmy George Indoor Stadium, Vellayambalam, Thiruvananthapuram
Ground development work, Toilet block, Fencing Bore well, Electrical works, Electrification of toilet block, borewell
2026_SKF_847722_2
602/SKF/CE/2025-26
Open Tender
Civil Works - Others
180 days
Palakkad
Please refer tender document
7 documents required · 7 mandatory
₹2,950
₹50,000
6 Jun 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
28 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Ground Development work | ||||||
| 1.01 | 2.2 : Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 1 | Hecter | - | - | BI01010001010000000000000515BI0100001114 |
| 1.02 | 2.3.2.A : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | 1 | Hecter | - | - | BI01010001010000000000000515BI0100001115 |
| 1.03 | od92950/2022_2023 : Excavation in soil by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres. | - | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 1.04 | 3.19.1 : Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 1.05 | od75965/2022_2023 : SKF_OD 6/2022-2023 Sieving excavated Earth through 4.75 mm sieve and collecting the sieved earth in<br>stacks for measurement.<br> | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 1.06 | od75966/2022_2023 : SKF_OD 4/2022-2023Supplying and stacking for measurement Jamuna Sand at site including royalty<br>and carriage upto 5 k.m. lead complete | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 1.07 | od75967/2022_2023 : SKF_OD 2/2022-2023 Mixing earth and sand in the required proportion specified or directed by the Officer-in-charge | - | cum | - | - | BI01010001010000000000000515BI0100001120 |
| 1.08 | od75968/2022_2023 : SKF_OD 3/2022-2023 Spreading of earth and sand in required thickness as per direction of officer-in-charge (cost of earth and sand to be paid separately). | - | cum | - | - | BI01010001010000000000000515BI0100001121 |
| 1.09 | od75969/2022_2023 : SKF_OD 10/2022-2023 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity with road roller including making good the undulations etc. including all cost of labour, hire charges, fuel, oil, etc. complete. | - | sqm | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1434177.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tenderdoc.pdf
Tender Documents • 1.36 MB
BOQ_1434177.xls
BOQ • 0.37 MB
drawings.pdf
Other Document • 0.49 MB
Download all tender documents and submit your bid