| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.2 LAccepted-AOC 1 1A VANSITART ROW 2ND FLOOR ROOM NO 2 KOL 700 001 | KOLKATA | KOLKATA | WEST BENGAL | 700001 | ₹56.2 L | L1 | Accepted-AOC AOC, Lowest Bidder |
| 2 | L2₹56.4 LRejected-Finance 1 1 A VANSATTART ROW 3RD FLOOR ROOM NO 2A | ₹56.4 L | L2 | Rejected-Finance NOT L1 BIDDER |
| 3 | L3₹56.7 LRejected-Finance 7G CORNFIELD ROAD KOLKATA 700019 | PASCHIM BARDHAMAN | WEST BENGAL | 713305 | ₹56.7 L | L3 | Rejected-Finance NOT L1 BIDDER |
| Sl No | Description | Qty | Unit | JDJ ENTERPRISE. A UNIT OF JDJ TRADERS PRIVATE LIMITED L2 | ALOK ENTERPRISE. A Unit of Saket Trexim Pvt. Ltd. L1 | CONCORD ENGINEERING L3 |
|---|---|---|---|---|---|---|
| 1.00PART -A (Labour Protion) | ||||||
| 1.11 | a) Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000ml/500ml capacity at Kamalnagar bottling plant, in the District of Purba Bardhaman by provding sufficient skilled machine operator for pet Blowing machine (1 No.) Rincing filling capping machine (1 No.) labeling machine & batch code machine (1 No.) shrink wrappling machine (1 No.) water treatment plant (1 No. ) High pressure Commpressor, low pressure Compressor, Chiller and cooling tower (1 No.) Assistant operator cum helper for despatch of finished product to ware house(1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automatin system (1 No.) Security guard (1 No. ) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant w.e.f.- 01/04/2026 to 31/03/2027 | 12 | Months | 1,73,000 ₹20.8 L | 1,72,736 ₹20.7 L | 1,74,400 ₹20.9 L |
| 1.12 | b) Provision of Electrician visit to oversee the overrall power circuit and electrical accessories and machineries. w.e.f.- 01/04/2026 to 31/03/2027 | 365 | days | 720 ₹2.6 L | 716 ₹2.6 L | 723 ₹2.6 L |
| 2.00Part-B (Supervision Portion) | ||||||
| 2.11 | a) Skilled suprvisor for supervision of entire installtion for trouble free operation including manning, control, output data generation etc. ( 4 days in a month i.e. 1 day in a week) w.e.f.- 01/04/2026 to 31/03/2027 | 12 | Months | 2,650 ₹31,800 | 2,633 ₹31,596 | 2,659 ₹31,908 |
| 2.12 | b) Sweeping of garbage from bins of different area in side the plant, store area and its adjacent roads, collecting from roads, intermediate path way, back side of the plant and store area, cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, store and rooms to ensure highest level of hygenic condition inside the plant, cleaning of alll grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc as per direction of EIC for 12 months w.e.f.- 01/04/2026 to 31/03/2027 | 12 | Months | 11,300 ₹1.4 L | 11,236 ₹1.3 L | 11,348 ₹1.4 L |
| 3.00Part - C (Daily/ Week/ Monthly Maintenance) | ||||||
| 3.11a) Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade (RFC & labelling machine)FRL-32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area(4 times in month) PET Blowing, RFC, Labelling, Batch coding & Shrik Wrapping Machine(4 times in a month) and HP compressor with Drayer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc. (4 times in a month) and pouch filling mahines (4 times in a month). Raw materials to be kept properly in good Deployment of skilled technician of work | ||||||
| 4.00force to undertake routine daily/weekly/monthly periodical machine wise maintenance work strictly adhering to the maintenance guidlines of the manufacturer including other routine (daily/weekly/monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Departmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 12 months. i) Static Portion :- WTP areas (Dual Media, UF, RO, Ozanator etc. ii) Motive Portion :- PET blowing machine, RFC, labeling mahine, shrink wrapping machine. | ||||||
| 4.11 | compressor with dryer, LP compressor with drayer, chiller tower, CW pump etc including leakage test of entore pneumatic, conveying main including calibration of gauges.
Miscellaneous charges :-
Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment/topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc. | 12 | Months | 71,000 ₹8.5 L | 70,366 ₹8.4 L | 71,070 ₹8.5 L |
Tender Value
₹55.1 L
EMD Value
₹1.1 L
Closing Date
30 Jan 2026, 5:30 pmClosed
Executive Engineer
EE,CMD PHE.DTE, PURTA BHAVAN, PURBA BARDHAMAN
Operation__Maintanance_and_Production_of_packaged_drinking_water_from_R_O__based_fully_automatic_drinking_water_bottling_plant_with_an_hourly_Production_capacity_3600_bottles_of_1000ml_500ml_capacity_including_submission_of_D_I_form_for_FSSAI__BIS_re
2026_PHED_984735_5
WBPHED/EE/CMD/ENIT-16/2025-26
Open Tender
Miscellaneous Services
365 days
PURBA BARDHAMAN
Operation__Maintanance_and_Production_of_packaged_drinking_water_from_R_O__based_fully_automatic_drinking_water_bottling_plant_with_an_hourly_Production_capacity_3600_bottles_of_1000ml_500ml_capacity_including_submission_of_D_I_form_for_FSSAI__BIS_re
6 documents required · 6 mandatory
₹1.1 L
24 Apr 2026
14 Jan 2026
2 Feb 2026
14 Jan 2026
30 Jan 2026
14 Jan 2026
PART -A (Labour Protion)
a) Production of packaged drinking water on 8 hours per shift basis of R.O. based fully automatic drinking water bottling plant with an hourly Production capacity 3600 bottles of 1000ml/500ml capacity at Kamalnagar bottling plant, in the District of Purba Bardhaman by provding sufficient skilled machine operator for pet Blowing machine (1 No.) Rincing filling capping machine (1 No.) labeling machine & batch code machine (1 No.) shrink wrappling machine (1 No.) water treatment plant (1 No. ) High pressure Commpressor, low pressure Compressor, Chiller and cooling tower (1 No.) Assistant operator cum helper for despatch of finished product to ware house(1 No.), skilled person for Stock keeping aranging of finished product at ware house upto delivery point and data report generation through automatin system (1 No.) Security guard (1 No. ) per shift including providing necessary personnel for guarding arrangement round the clock. The Agency will provide sufficient man power for smooth operation security of the bottling plant as directed by E.I.C. This does not include any spares and raw materials for operation and maintenance of the bottling plant w.e.f.- 01/04/2026 to 31/03/2027
b) Provision of Electrician visit to oversee the overrall power circuit and electrical accessories and machineries. w.e.f.- 01/04/2026 to 31/03/2027
Part-B (Supervision Portion)
a) Skilled suprvisor for supervision of entire installtion for trouble free operation including manning, control, output data generation etc. ( 4 days in a month i.e. 1 day in a week) w.e.f.- 01/04/2026 to 31/03/2027
b) Sweeping of garbage from bins of different area in side the plant, store area and its adjacent roads, collecting from roads, intermediate path way, back side of the plant and store area, cleaning of surrounding surface drains, cleaning of roofs including collection of dust and also mopping of inside area of the whole plant, store and rooms to ensure highest level of hygenic condition inside the plant, cleaning of alll grease strains thoroughly including supply of all necessary T & P items like brooms, approved disinfectant, floor cleaner, room freshner etc as per direction of EIC for 12 months w.e.f.- 01/04/2026 to 31/03/2027
Part - C (Daily/ Week/ Monthly Maintenance)
a) Making arrangement for adequate care for day to day and weekly preventive maintenance to keep the plant healthy. All the machines and apparatus need to be cleaned and washed every time before and after use. The machines and apparatus, electrical panel board switches, switch gear etc to be monitored and checked for its proper functioning by supplying different lubrication oil and grease for daily replenishment & topping of grease (AP 2) and lubrication oil 30 grade (RFC & labelling machine)FRL-32, CRC, WD-40 for pet blowing machine, Recip oil for HP compressor and and other compressor oil including changing of fuse wires, tubes, bulbs etc. Weekly Maintenance to be done preferably on weekly holiday by deploying skilled man power in WTP area(4 times in month) PET Blowing, RFC, Labelling, Batch coding & Shrik Wrapping Machine(4 times in a month) and HP compressor with Drayer, LP compressor with Dryer, Chiller, Cooling Tower, CW pump, all pneumatic conveying main etc. (4 times in a month) and pouch filling mahines (4 times in a month). Raw materials to be kept properly in good Deployment of skilled technician of work
force to undertake routine daily/weekly/monthly periodical machine wise maintenance work strictly adhering to the maintenance guidlines of the manufacturer including other routine (daily/weekly/monthly) maintenance work viz CIP, lubrication, greasing, tightening of nuts, checking conding of belts & air filter, alignment as required and regular upkeepment in different parts of plant including fitting of Departmental supplied spares as and when required to ensure overall good health of the plant of whole as per direction of E.I.C. for 12 months. i) Static Portion :- WTP areas (Dual Media, UF, RO, Ozanator etc. ii) Motive Portion :- PET blowing machine, RFC, labeling mahine, shrink wrapping machine.
compressor with dryer, LP compressor with drayer, chiller tower, CW pump etc including leakage test of entore pneumatic, conveying main including calibration of gauges. Miscellaneous charges :- Supply, delivery & keep ready stock different lubrication oil and grease for daily replenishment/topping of grease (AP 2) and lubrication oil 30 grade RFC & labelling machine, recip oil for HP compressor and other compressor oil including changing of fuse wires, tubes, bulbs etc.
b) Making arrangement for monthly preventive maintenance by manufacturer/Parent company of a) PET Blowing Machine b) RFC Machine c) Labelling mahince d) Batch Coding Machine e) High pressur Ccompressor with Drayer f) Low pressure compressor with Drayer g) Chiller h) cooling Tower i) Shrink Wrapping machine j) Water Treatment Plant by deploying Service Enginner of the parent manufactring company as per preventie maintenance schedule with all incidental charges for setting and resetting of different critical process related field instrumena along with replacement of spares of these plant. A seperate register for attaing monthly preventive maintenance by the parent manufacturing company is to be kept at site duly authenticated by the concerned Engineer-In-Charge and should be submitted during preparation of bill. Deployment of Service Engineer of the parent company with all conveynance for setting, re-setting and calibration of the equipment upto the level of standard
i) Rinsing Filling cleaning machine (involving of 2 days) ii) Labeling machine (involving of 2 days) iii) PET blowing machine (involving of 2 days) iv) High Pressure compressor (involving of 2 days) v) Low pressure compressor (involving of 2 days) vi) Chiller (involving of 1 day) vii)Cooling tower (involving of 1 day) viii) Shrink Wrap Mahine (involving of 1 day) ix) Water Treatment Plant (involving of 2 days) x) Batch code mahine (involving of 1 day)
Submission of D-I form for FSSAI
Professional fees for initiation of online submission of D-1 form (Audit Report) annually for the year 2026-2027
Incidental Charges including transportation fooding, conveyance, stationeries for Food Safety official visit (2 times) during the year and also after submission of D-1 form.
Labour charges for thorough cleaning, sweeping, mopping of the machineries and building of the Bottling Plant to maintain hygiene and sanitary requirements as mentioned in schedule 4 of Food Safety and Standards (Licensing and registration of food business) Regulation 2011 during visits of the Food Safety officers at the Bottling Plant. This includes all consumable required for plant for mantaining highest level of hygene with placurd, festoon within the plant & outside the plant.
BIS Renewal 2026
Official charges for BIS License
Drafting, typing, binding, collection of documents from various sources and preparation of documentations for BIS License Renewal including laboratory test reports
Incidental Charges including transportation fooding, conveyance, stationeries for BIS official visit (2 times)
Labour charges for thorough cleaning, sweeping, mopping of the machineries, and building of the Bottling Plant to maintain hygene during several visits of the BIS officers at the Bottling Plant
FSSAI renewal 2026
Official charges for renewal of FSSAI license for 1 year
Drafting, typing, binding, collection of documents from various sources and preparation of documentations for FSSAI (Food Safety) .
Incidental Charges including transportation fooding, conveyance, stationaries for Food Safety official visit (2 times) at the time of renewal.
FSSAI Water Parameters IS 2.10.8 norms
Table 1: Microbiological Requirements
Coliform bacteria Faecal Streptococci, and Staphylococcus aureus Sulphite Reducing Anaerobes, cfu/50 ml Pseudomonas aeruginosa Aerobic Microbial Count at 20-22o C in 72 h at 37± 1o C in 24 h Yeast and mould Salmonella and Shigella Vibrio cholera, and V. parahaemolyticus
Table 2: Organoleptic and physical parameters
Colour, true colour units Odour Taste Turbidity, nephelometric turbidity unit (NTU) Total dissolved solids pH
Table 3: General parameters concerning substances undesirable in excessive amounts
Barium (as Ba) Copper (as Cu) Iron (as Fe) Manganese (as Mn) Nitrate (as NO3) Nitrite (as NO2) Fluoride (as F) Zinc (as Zn) Silver (as Ag) Aluminium Chloride Selenium Sulphate Alkaliniity Calcium Magnesium Calcium Magnesium Sodium Residual free chloride Phenolic compounds Mineral oil Anionic surface active agents Sulphide Antimony Borates Bromates
Table 4 Parameters concerning toxic substance
Mercury Cadmium Arsenic Cyanide Lead Chromium Nickel Polychlorinated biphenyle (PCB) Polynuclear aromatic hydrocarbons
Table 5 Parameters concerning radio-active residues
Alpha emitters, Becquerel
Beta emitters, Becquerel
Table 6 Parameters concerning pesticide residues
Pesticide residues considered individually Total pesticide residue Official Charges for testing of above mention water parameters on half yearly basis
Incidental charges including trnsportation, sample collection, container, courier charges, collection of reports, stationaries for water test reports.
Add GST @ 18%
Add Cess @ 1%
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_2403010.xls
BOQ • 0.37 MB
TERMSANDCONDITION.pdf
Additional Documents • 0.12 MB
2911-N-pdf.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid