| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC GORAKHPUR | UTTAR PRADESH | 273413 | ₹1.4 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹1.5 CrRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹1.5 Cr | 2 | Rejected-Finance 2nd lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S Singh Construction L2 | M/S SRI RAJ BAHADUR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work. | 92.65 | m³ | 6,850 ₹6,34,652.5 | 6,673 ₹6,18,253.45 Lowest |
| 2.00 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,604.07 | m³ | 150 ₹2,40,610.5 Lowest | 159 ₹2,55,047.13 |
| 3.00 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 87.8 | m² | 265 ₹23,267 | 259 ₹22,740.2 Lowest |
| 4.00 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 40 | Nos. | 3,500 ₹1,40,000 | 3,424 ₹1,36,960 Lowest |
| 5.00 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 44 | Nos. | 5,000 ₹2,20,000 | 4,812 ₹2,11,728 Lowest |
| 6.00 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 6,416.26 | m² | 1,890 ₹1,21,26,731.4 | 1,882 ₹1,20,75,401.32 Lowest |
| 7.00 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 917.44 | m² | 1,300 ₹11,92,672 | 1,280 ₹11,74,323.2 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
18 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 01
2026_UPIDC_1147466_1
02/SE-XII/2026-27
Open Tender
Civil Works
Fixed-rate
210 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,550
₹3.1 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
1 Aug 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work. | 92.65 | m³ | - | - |
| 2 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,604.07 | m³ | - | - |
| 3 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 87.8 | m² | - | - |
| 4 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 40 | Nos. | - | - |
| 5 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 44 | Nos. | - | - |
| 6 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 6,416.26 | m² | - | - |
| 7 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 917.44 | m² | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2146693.xls
BOQ • 0.26 MB
CORRIGENDUM.pdf
Additional Documents • 0.64 MB
TD1.pdf
Tender Documents • 2.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].