| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-Finance GORAKHPUR | UTTAR PRADESH | 273413 | ₹1.4 Cr | 1 | Accepted-Finance 1st lowest |
| 2 | 2₹1.5 CrRejected-Finance 213 TAJOPUR PASCHIMPURA MAUNATH BHANJAN MAU MAU UTTAR PRADESH 275101 UDYAM UP 55 0009322 | MAU | UTTAR PRADESH | 275101 | ₹1.5 Cr | 2 | Rejected-Finance 2nd lowest |
| 3 | Rejected-Technical | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| 4 | Rejected-Technical GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | - | - | Rejected-Technical TECHNICALLY DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S Singh Construction L2 | M/S SRI RAJ BAHADUR SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work. | 92.65 | m³ | 6,850 ₹6.3 L | 6,673 ₹6.2 L |
| 2.00 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,604.07 | m³ | 150 ₹2.4 L | 159 ₹2.6 L |
| 3.00 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 87.8 | m² | 265 ₹23,267 | 259 ₹22,740.20 |
| 4.00 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 40 | Nos. | 3,500 ₹1.4 L | 3,424 ₹1.4 L |
| 5.00 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 44 | Nos. | 5,000 ₹2.2 L | 4,812 ₹2.1 L |
| 6.00 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 6,416.26 | m² | 1,890 ₹1.2 Cr | 1,882 ₹1.2 Cr |
| 7.00 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 917.44 | m² | 1,300 ₹11.9 L | 1,280 ₹11.7 L |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
18 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 01
2026_UPIDC_1147466_1
02/SE-XII/2026-27
Open Tender
Civil Works
210 days
LAKHIMPUR KHERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,550
₹3.1 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
9 Jun 2026
11 May 2026
18 May 2026
11 May 2026
18 May 2026
11 May 2026
14 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | M-150 brick work in Toe wall/X- sleeper in 1:4 cement coarse sand mortar including of all labour,Material and T&P etc. required for proper completion of work. | 92.65 | m³ | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth work in filling ruts & cuts for making sub grade for lining including lead up to 30m. & lift up to 1.50m. Including labour, T&P and dressing to profiles etc. required for proper completion of work | 1,604.07 | m³ | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | 10 mm Thick Cement plaster 1:4 C.M with hamirpur coarse sand including cost of all Material, Labour and T&P etc. with proper completion of work. | 87.8 | m² | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Laying of Tiles for Pressure Release Arrangement on slope filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 40 | Nos. | - | - | BI01010001010000000000000515BI0100001114 |
| 5 | Laying & Fixing Vertical Pressure Release Valve filled with graded filter under neath the lining so as to complete the work as per Drawing & Specification. | 44 | Nos. | - | - | BI01010001010000000000000515BI0100001114 |
| 6 | Slope lining in two layer 1st layer laying with 1st class brick work in 1:4 cement mortar laid over 10mm thick cement mortar and 15 mm thick S.W.P in 1:3 cement mortar and 2nd layer laying with C.C. Tiles in 1:4 cement mortar laid over 5 mm thick cement mortar in 1:4 including Cost of material,Labour and T&P required for proper completion of work | 6,416.26 | m² | - | - | BI01010001010000000000000515BI0100001114 |
| 7 | Slope lining in single layer laying with C.C. Tiles laid over 15 mm thick S.W.P in 1:3 cement mortar and laid over 5 mm thick cement mortar in 1:4 over 1st class brick work.including Cost of Material,labour and T&P required for proper completion of work. | 917.44 | m² | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2146693.xls
BOQ • 0.26 MB
CORRIGENDUM.pdf
Additional Documents • 0.64 MB
TD1.pdf
Tender Documents • 2.22 MB
Download all tender documents and submit your bid