Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹27.4 L
EMD Value
₹55,000
Closing Date
2 Dec 2026, 4:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE, Awadh Vihar Cirlce, UPAVP, Lucknow
Office, SE, Awadh Vihar Cirlce, UPAVP, Office Complex, Vrindavan Yojna, Lucknow
Construction of Pump house cum operator room, Rising main, boundary wall and 1.5 m wide Path at sector -3 Avadh vihar yojna lucknow
2026_UPHDB_1206202_2
3126/Y-12/180 Date-30.10.2026
Open Tender
Civil Works - Others
Percentage
90 days
Awadh Vihar Yojna
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,770
EE CD Lucknow-07, UPAVP, Lucknow
₹55,000
Yes
6 Nov 2026
6 Nov 2026
3 Dec 2026
6 Nov 2026
2 Dec 2026
6 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 37.83 | Cum | 140.21 | ₹5,304.14 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift . | 37.83 | Cum | 154.83 | ₹5,857.22 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:6:12 (1 cement : 6 coarse sand (zone-III): 12 graded brick aggregate 40 mm nominal size) | 13.81 | Cum | 4,553 | ₹62,876.93 |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class-150 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 35.41 | Cum | 6,519 | ₹2,30,837.79 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 14.96 | Cum | 7,145.72 | ₹1,06,899.97 |
| 6 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1.5:3 (1 Cement 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 15.25 | Cum | 8,408 | ₹1,28,222 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class-150 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) | 50.03 | Cum | 7,273 | ₹3,63,868.19 |
| 8 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class-150 in superstructure above plinth level up to floor V level. Cement mortar 1:4 (1 cement :4 coarse sand) | 2.87 | Cum | 7,565.2 | ₹21,712.12 |
| 9 | Brick work 7 cm thick with common burnt clay F.P.S. (non modular) brick of class-150 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth level and upto floor five level. | 3.37 | Cum | 9,314.3 | ₹31,389.19 |
| 10 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.92 | Cum | 7,816.74 | ₹7,191.4 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
PumphouseCDLKO7_Financial.pdf
Additional Documents • 37.48 MB
BOQ_2286725.xls
BOQ • 0.34 MB
PumphouseCDLKO7_Technical.pdf
Tender Documents • 3.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .