Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC 4 A RUKSHMANI PARK SOCIETY OPP SAMA WATER TANK NEW SAMA ROAD VADODARA 390 008 | VADODARA | VADODARA | GUJARAT | 390008 | L1 | Accepted-AOC L1 AND ACCEPTABLE | |
| 2 | L2₹13.9 L+₹2.5 L (22.0%)Rejected-AOC G 16 JAY COMPLEX BELOW UMA CO OP BANK NIZAMPURA VADODARA 390 002 | VADODARA | VADODARA | GUJARAT | 390002 | L2 | Rejected-AOC NOT L1 |
Tender Value
₹9.4 L
EMD Value
₹18,800
Closing Date
14 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE AHMEDABAD
CWE AHMEDABAD
PROVN OF NEW ROAD AT FACULTY OF WEAPON TECHNOLOGY, EME SCHOOL VADODARA
2022_MES_504654_1
87082
Open Tender
Civil Works - Roads
Item Rate
120 days
BARODA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE ARMY BARODA
₹18,800
6 May 2022
31 Jan 2022
16 Mar 2022
31 Jan 2022
14 Mar 2022
2 Mar 2022
60 days
Amount
Surface excavation n. exc (not exceeding) 30 cm deep and averaging 15 cm deep and getting out in Soft/ loose soil. Complete all as specified and as directed.
Surface dressing n exc 15 cm deep in soft/ loose soil. Complete all as specified and as directed.
Excavation in trenches, n exec 1.5 m deep and getting out in Soft/ loose soil. Complete all as specified and as directed.
Removing excavated soil exc. 1.5 Km but n. exc. 5.0 Km from the starting point and deposited outside of MD land. Complete all as specified and as directed.
Rolling and consolidating to required level, gradient or camber of formation surfaces in cutting with 8 to 12 tonne power roller including watering as necessary. Complete all as specified and as directed.
Material & Labour for 200 mm thick (spread thickness) soling (or sub base) in one layer with broken boulders or quarried stone (Granite, Trap or Baslat stone) of size range 100 mm to 50 mm, interstices filled, surface formed and rolled using power roller 8 to 12 tonne capacity and consolidated to required gradient and camber. Complete all as specified and as directed.
Material & Labour for 150 mm thick (compacted thickness) ready wet mix macadam (WMM) using materials of 30 CBR, in two layers each of 75 mm thick (each layer to be rolled and consolidated separately) confirming to the grading given in table 400-13 and physical requirements given in table 400-12 spread with mechanical means as specified, hollows made upto for true surface, spread, surface binding with and including screening and moorum, watered, consolidated and rolled using vibratory roller 8 to 12 tonne capacity as per clause 406.3.5 of MORTH to required gradient and camber. Complete all as specified and as directed. (Note: Two layers will be measured and paid as one unit)
Material & Labour for preparing surfaces of unsurfaced water bound macadam surfaces by brushing with wire brushes for removing caked mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. Complete all as specified and as directed.
Material & Labour for applying evenly a priming tack coat with bituminous primer (Paving bitumen) VG-10 @ 10 KG/ 10 Sqm. Complete all as specified and as directed.
Material & Labour for Bituminous premix semi dense asphaltic concrete of 40 mm consolidated thickness with 5.5% binder content (using paving bitumen of grade VG-30) by weight of total mix, using hot mix process and laid by mechanical paver, rolled and compacted to required camber and gradient using power roller 8 to 12 tonne capacity. Complete all as specified and as directed.
Material & Labour for 75 mm thick Moorum as in berms. Complete all as specified and as directed.
Material & Labour for factory made precast cement concrete solid blocks type B1, 1:2:4 using 20 mm graded stone aggregate exc 10 cm in width set in CM (1:4) as in road side edging or in road side kerb. Complete all as specified and as directed.
Material & Labour for RCC pipe 450 mm bore, class NP-2 laid and jointed complete with collars, in CM 1:1. Complete all as specified and directed.
Material & Labour for brick work with kiln brunt bricks (old size) built in CM 1:6 using sub class 'B' bricks straight or curved on plan exceeding 6 m mean radius. Complete all as specified and as directed.
Material & Labour for PCC (1:3:6) type C1 using 20 mm graded stone aggregate as in concrete bed below RCC drain pipes including necessary formwork, weathering, slightly rounded or chamfered angle and throating. Complete all as specified and as directed.
Material & Labour for rendering 15 mm thick on fair faces of brick work or concrete surfaces in CM (1:4) finished even and smooth without using extra cement. Complete all as specified and as directed.
Material & Labour for PCC (1:3:6) type C1 using 20 mm graded stone aggregate as in coping including necessary formwork, weathering, slightly rounded or chamfered angle and throating. Complete all as specified and as directed.
Material & Labour for preparation of new plastered surfaces of wall and applying three coats of white wash. Complete all as specified and as directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soil. Complete all as specified and as directed.
City Light
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .