| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.2 LAdmitted-Finance | ₹30.2 L | L1 | Admitted-Finance |
| 2 | L2₹30.2 L+₹661.61 (0.02%)Admitted-Finance | ₹30.2 L+₹661.61 (0.02%) | L2 | Admitted-Finance |
| 3 | L3₹30.2 L+₹2,196.08 (0.07%)Admitted-Finance | ₹30.2 L+₹2,196.08 (0.07%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARI CHAND RAMOLA L2 | ram singh bhandari L3 | harendra singh negi L1 |
|---|---|---|---|---|---|---|
| 1.00Civil Work | ||||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 219.21 | Cum | 390 ₹85,491.9 Lowest | 397 ₹87,026.37 | 390 ₹85,491.9 Lowest |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 12 | 39.06 | Cum | 4,458.9 ₹1,74,164.63 | 4,458.9 ₹1,74,164.63 | 4,458 ₹1,74,129.48 Lowest |
| 1.03 | R.C.C. 1:2:4
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications. RCC grade M-20 | 100.29 | Cum | 7,978.7 ₹8,00,183.82 | 7,978.7 ₹8,00,183.82 | 7,978 ₹8,00,113.62 Lowest |
| 1.04 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 102.35 | Qtl | 7,054.96 ₹7,22,075.16 | 7,054.96 ₹7,22,075.16 | 7,054 ₹7,21,976.9 Lowest |
| 1.05 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | 222.75 | Cum | 4,064.8 ₹9,05,434.2 | 4,064.8 ₹9,05,434.2 | 4,064 ₹9,05,256 Lowest |
| 1.06 | HDPE Pipe
Providing, Laying, Joining & Fixing HDPE Pipe Normal Pressure (PN) in 6Kg/cm2 (OD in mm) 90mm Dia PN 6 PE-80 | 225 | RMT | 384.3 ₹86,467.5 | 384.3 ₹86,467.5 | 384 ₹86,400 Lowest |
| 1.07 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
GI wire 10 gauge BWG | 81 | Cum | 1,885.3 ₹1,52,709.3 | 1,885.3 ₹1,52,709.3 | 1,885 ₹1,52,685 Lowest |
| 1.08 | Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work. | 376 | Hrs. | 246.5 ₹92,684 | 246.5 ₹92,684 | 246 ₹92,496 Lowest |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
19 Feb 2026, 11:00 amClosed
EEMI Tehri
Vikas Bhawan New Tehri
Construction of Check Dam Jajal at Henval River Narendranagar
2026_MI_91645_1
05/EEMI/2025-26
Open Tender
Civil Works
Item Wise
Jajal Henval River
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
Executive Engineer MID
₹96,000
19 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
19 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | - | Cum | - | - |
| 1.02 | Concrete with cement, coarse sand and 40 mm gauge stone ballast in proportion 1:4:8 in foundations and floors including supply of all material, labour and T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 12 | - | Cum | - | - |
| 1.03 | R.C.C. 1:2:4
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications. RCC grade M-20 | - | Cum | - | - |
| 1.04 | Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 | 1 | Qtl | - | - |
| 1.05 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications Clause 802, 803, 1202 & 1203 of MORD Specifiction | - | Cum | - | - |
| 1.06 | HDPE Pipe
Providing, Laying, Joining & Fixing HDPE Pipe Normal Pressure (PN) in 6Kg/cm2 (OD in mm) 90mm Dia PN 6 PE-80 | - | RMT | - | - |
| 1.07 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications)
GI wire 10 gauge BWG | - | Cum | - | - |
| 1.08 | Dewatering from foundation of abutments and wing walls (with pump capacity 4000 lit per Hr.) including wages of operator and fuel including supply of all material, labour and T&P etc. required for proper completion of the work. | - | Hrs. | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
BOQ_108541.xls
BOQ • 0.36 MB
Tender.pdf
Tender Documents • 2.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .