Loading…
Loading…
Tender Value
₹67.3 Cr
EMD Value
₹1.3 Cr
Closing Date
11 Sept 2026, 12:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
Yes
12/08/2026 12:00
Lowest to Highest
120 days
Expenditure
Revenue
CE/CON/S
13 conditions · 2 needing a document upload
As per RFP Document.
As per RFP Document.
10 conditions · 2 needing a document upload
The original Bank Guarantee should be delivered in person to the official nominated as indicated in the tender document before closing date for submission of bids (i.e. excluding the last date of submission of bids). Nominated official is Dy CE/Con/Works & Stores/GRC, S. E. Railway, Kolkata-700043.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per RFP document.
Pre-bid Conference VC link will be provided a day before meeting.
Rate contract for carrying out Final Location Survey (geotechnical studies, design, preparation of drawings) and other preliminary activities for reparation of DPR, EPC tender documents in connection with upcoming survey work for New line, By -pass/ Chord line, Doubling/Multi-tracking, flyover etc. including Providing facilitation to Competent Authority for Land Acquisition (CALA) for land acquisition work to the Railway Projects in South Eastern Railway.
4625-GRC-CE-C-SO-09-2026
4625-GRC-CE-C-SO-09-2026
Open
Works - General
36 Months
Unknown (Unspecified Location)
₹0
₹1.3 Cr
30 Jul 2026
30 Jul 2026
28 Aug 2026
12 Aug 2026
16 items across 2 schedules · ₹47,99,64,000 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating work for construction a New line. The details of works to be executed are Item A (for Civil Engineering works), (ii) Item B (for S&T Engineering works), (iii) Item C (for Electrical Engineering works), (iv) Item D (for Operating works), (v) Item F (for DPR preparation) including PPSD document Chapter IV of Terms of Reference. Some points of general guidance are listed Item E of this Chapter IV. Note: - (i) For other Terms of reference, Chapters I to VI of Annexure I, Terms of Reference may be referred. NOTE: - Detailed Project Report (DPR) should be prepared as per Railway Board letter no. 2022/W-1/Gen/DPR proforma (E-off 3404238) dt. 13.12.23 No 2018-w1/Gen/policy dt 22.12.23. & No. 2018/W-I/Genl/Policy dated: 10/01/2024. Additionally, it will include a PPSD document. Note- Extra to item no. NS-1, the FLS is carried out for two lines i.e. New line project with doubling @ 25% of rate prescribed for Single line. | Kilometre of of at & if | 350.00 | 2,82,000 | 9,87,00,000 |
| 2 | Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating work for construction Doubling line/3rd line or multi tracking line. The details of works to be executed are Item A (for Civil Engineering works), (ii) Item B (for S&T Engineering works), (iii) Item C (for Electrical Engineering works), (iv) Item D (for Operating works), (v) Item F (for DPR preparation) including PPSD document of Chapter IV of Terms of Reference. Some points of general guidance are listed at Item E of this Chapter IV. Note: - (i) For other Terms of reference, Chapters I to VI of Annexure Terms of Reference may be referred. NOTE: - Detailed Project Report (DPR) should be prepared as per Railway Board letter no. 2022/W-1/Gen/DPR proforma (E- off 3404238) dt. 13.12.23 & No 2018- w1/Gen/policy dt 22.12.23. & No. 2018/W- I/Genl/Policy dated: 10/01/2024. Additionally, it will include a PPSD document. Note- Extra to item no. NS-2 the FLS is carried out for two lines e.g. 3rd and 4thline @ 25% of rate prescribed for doubling. (5th line/6th line as on additional). | Kilometre of I, if | 1300.00 | 2,25,600 | 29,32,80,000 |
| 3 | Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating work for construction a New line in Hilly terrain and Forest Area The details of works to be executed are Item A (for Civil Engineering works), (ii) Item B (for S&T Engineering works), (iii) Item C (for Electrical Engineering works), (iv) Item D (for Operating works), (v) Item F (for DPR preparation) including PPSD document of Chapter IV of Terms of Reference. Some points of general guidance are listed at Item E of this Chapter IV. Note: - (i) For other Terms of reference, Chapters I to VI of Annexure Terms of Reference may be referred. NOTE: - Detailed Project Report (DPR) should be prepared as per Railway Board letter no. 2022/W-1/Gen/DPR proforma (E- off 3404238) dt. 13.12.23 & No 2018- w1/Gen/policy dt 22.12.23. & No. 2018/W- I/Genl/Policy dated: 10/01/2024. Additionally, it will include a PPSD document. Note- Extra to item no. NS-3, the FLS is carried out for two lines i.e. New line in Hilly Terrian project with doubling 25% of rate prescribed for Single line. | Kilometre of . I, if @ | 100.00 | 3,38,400 | 3,38,40,000 |
| 4 | Conducting Final Location Survey including Preparation of DPR, Geotechnical Investigation, Signaling works, Electrical works & operating work for construction Doubling line/multi tracking line in Hilly terrain and Forest Area . The details works to be executed are Item A (for Civil Engineering works), (ii) Item B (for S&T Engineering works), (iii) Item C (for Electrical Engineering works), (iv) Item (for Operating works), (v) Item F (for DPR preparation) including PPSD document Chapter IV of Terms of Reference. Some points of general guidance are listed Item E of this Chapter IV. Note: - (i) For other Terms of reference, Chapters I to VI of Annexure I, Terms of Reference may be referred.NOTE: - Detailed Project Report (DPR) should be prepared as per Railway Board letter no. 2022/W-1/Gen/DPR proforma (E-off 3404238) dt. 13.12.23 No 2018-w1/Gen/policy dt 22.12.23. & No. 2018/W-I/Genl/Policy dated: 10/01/2024. Additionally, it will include a PPSD document. Note- Extra to item no. NS-4 the FLS is carried out for two lines e.g. 3rd and 4thline @ 25% of rate prescribed for doubling. (5th line/6th line as on additional). | Kilometre of of D of at & if | 200.00 | 2,70,720 | 5,41,44,000 |
| Schedule total | ₹47,99,64,000 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
RFPforFLS.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].