Loading…
Loading…
| Sl No | Description | Qty | Unit | C P BABU L1 | NIZAR MV L2 |
|---|---|---|---|---|---|
| 1.00building | |||||
| 1.00 | 15.17.1:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:R.S. Joists | 44.88 | kg | 2.84 ₹127.46 Lowest | 3 ₹134.64 |
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 2.62 | cum | 587.31 ₹1,538.75 Lowest | 636 ₹1,666.32 |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 12 | sqm | 137.43 ₹1,649.16 Lowest | 148.8 ₹1,785.6 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 0.65 | cum | 2,959.3 ₹1,926.5 Lowest | 3,207 ₹2,087.76 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.3 | cum | 8,453.25 ₹27,895.73 Lowest | 9,162 ₹30,234.6 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 2.67 | cum | 10,833.47 ₹28,871.2 Lowest | 11,743 ₹31,295.1 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 9.54 | sqm | 774.7 ₹7,390.64 Lowest | 839 ₹8,004.06 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 15.2 | sqm | 614.83 ₹9,345.42 Lowest | 666 ₹10,123.2 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 52.8 | sqm | 812.82 ₹42,916.9 Lowest | 880 ₹46,464 |
Tender Value
₹16.5 L
EMD Value
₹41,362
Closing Date
11 Sept 2025, 6:00 pmClosed
ASSISTANT ENGINEER
LID EW SECTION,MALAPPATTAM GP,KANNUR-670631
MLPTM Project NO 211/24-25- (129/25-26) Development Works to Padappakari Vayojana Visrama Kendram
2025_LSGD_793686_6
AE/LIDEW/MLPTM/03/25-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Malappattam
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹41,362
Yes
6 Jun 2026
2 Sept 2025
15 Sept 2025
2 Sept 2025
11 Sept 2025
2 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .