Loading…
Loading…
Tender Value
₹1.6 L
EMD Value
₹1 L
Closing Date
1 Jun 2026, 3:00 pmClosed
Exeuctive Engineer, Panchayat, R. & B. Division, Patan
CURRENT REPAIRS FOR ROAD WORKS IN R&B(P) SUB SIDDHPUR, DISTRICT - PATAN (2ND TRY) YEAR 2026-2027
308153
03/2026-27
Open
Civil Works - Roads
Patan
7 documents required · 7 mandatory
₹1,500
Executive Engineer, Road &Building (Panchayat) Division, Patan
₹1 L
25 May 2026
25 May 2026
25 May 2026
1 Jun 2026
25 May 2026
CR - YEAR : 2026- 2027 : CURRENT REPAIRS FOR ROAD WORKS IN - SIDDHPUR - TALUKO OF SUB
DIVISION , SIDDHPUR - DISTRICT : PATAN.
QUANTITY STATEMENT
It. Description of Item (with brief specification and Estimated rate
Quantity Unit Rate In Amount
No. reference to book of specifications) In words
1 Providing, laying Bituminous spray grout one layer 37.50 1.00 MT 2285.63 Rupees Two
mm thick asphalt for tack coat 2.50 Kg/ 10 Sq.M. on BT Thousand Two
surface and asphalt grade VG-30 for grout at the rate of Hundred Eighty
15.00 Kg /10 Sq.M. for one layer and using M.C .Aggregate Five and Paise
at 0.50 Cu.M. / 10 Sq.M for one layer and key aggregate at Sixty Three Only
0.13 Cu.M. /10 Sq.M. and after spreading the stone
aggregate layer to be rolled by vibratory roller of 80 Kn to
100 Kn static weight etc complete including cost of stone
aggregate, asphalt and rolling etc complete.(RA)
2 Providing and laying 37.5mm thick bituminous spray grout 1.00 MT 3098.68 Rupees Three
base course using M.C stone B.Tstone. as per gradation and Thousand Ninety
asphalt VG-30 for mixing 1.99% of mix i.e 19.90/MT by Eight and Paise
weight including heating the asphalt and aggregate by hot Sixty Eight Only
mix hot laid process using drum mix plant beaching,
spreading the same by paver finisher and consolidation
with vibratory roller including the cost of labour ,oil,
lubricants etc. using contractors own machineries and plant
including applying tack coat over WBM surface
3 Providing and laying 37.50 mm thick B.M. using M.C stone 1.00 MT 3710.74 Rupees Three
B.T. stone. as per M.O.R.T. & H. specification & asphalt for Thousand Seven
tack coat at the rate of 2.5 Kg./10 Sqm. with mechanical Hundred Ten
sprayer & bitumen grade VG 30 for mixing at the rate of 34 and Paise
Kg./M.T. i.e. 3.40% of total weight of mix including heating Seventy Four
the aggregate and asphalt in continuous batching drum mix Only
plant and spreading the same by Manually and
consolidation with vibratory roller including paving all
materials equipments, tools & plants, fire wood, oil,
kerosene, labour charges etc complete using contractor's
own machinery drum mix plant & paver finisher etc.
complete. (R.A.)
4 Providing and applying Asphalt Painting on B.T. surface with 1.00 Sq.mt 66.82 Rupees Sixty Six
mechanical sprayer using bitumen VG-30 at the rate of 5.00 and Paise Eighty
kg/10 smt and spreading stone dust on painting surface at Two Only
the rate of 0.03 cum/10 sq mt and rolling with smooth
wheeled and pneumatic roller and brushing etc. complete.
5 Providing and laying 37.5mm thick bituminous spray grout 1.00 MT 3875.37 Rupees Three
base course using M.C stone B.Tstone. as per gradation and Thousand Eight
asphalt VG-30 for mixing 1.99% of mix i.e 19.90/MT by Hundred
weight including heating the asphalt and aggregate by hot Seventy Five and
mix hot laid process using drum mix plant beaching, Paise Thirty
spreading the same by paver finisher and consolidation Seven Only
with vibratory roller including the cost of labour ,oil,
lubricants etc. using contractors own machineries and plant
including applying tack coat over WBM surface
4.0kg/10sqm. (R A)
6 Providing and laying premix seal coat using B.T.chips ( 6 to 1.00 MT 4242.00 Rupees Four
10mm size ) 0.24 Cum./10 Sq.mt. i.e. 0.66 Cum. aggregate / Thousand Two
1 M.T. mix and asphalt grade VG-30 at the rate of 4.5% of Hundred Forty
mix i.e. 45 Kg./MT including heating the asphalt and Two and Paise
transporting the mixed material by tipper trcks and
spreading the same by Manually and consolidation by
vibratory roller of 80 to 100 KN static weight including
providing equipment, tools and plant, firewood lubricants,
kerosene, oil, labour charges using contractor's own
machineries drm mix palnt and paver finisher. (R A)
7 Providing and laying premix seal coat using B.T.chips ( 6 to 1.00 MT 4405.62 Rupees Four
10mm size ) 0.24 Cum./10 Sq.mt. i.e. 0.66 Cum. aggregate / Thousand Four
1 M.T. mix and asphalt grade VG-30 at the rate of 4.5% of Hundred Five
mix i.e. 45 Kg./MT including heating the asphalt and and Paise Sixty
aggregate by continuous batching drum mix plant, Two Only
transporting the mixed material by tipper trcks and
spreading the same by paver finisher and consolidation by
vibratory roller of 80 to 100 KN static weight including
providing equipment, tools and plant, firewood lubricants,
kerosene, oil, labour charges using contractor's own
machineries drm mix palnt and paver finisher. (R A)
8 Road marking with hot applied thermoplastic paints with 1.00 Sq.Mt 367.72 Rupees Three
reflectorising glass beads on bitumin surface providing and Hundred Sixty
laying a hot applied thermoplastic compound 2.5 mm thick Seven and Paise
including reflectorising glass beads @ 250gms per sqm area, Seventy Two
thickness of 2.5mm is excluding of surface applied glass Only
beds as per IRC:35-2015. The finished surface to be level,
uniform and free from streaks and holes. zebra patta
/bump patta lane/center line/ edge line/cut patta. The
white color marking should provide liminance coefficinet on
cemend road shalll be min 130 mcd/m2/lux and Asphalt
road shall be min 100 mcd/m2/lux during the service life
during the day time. The marking should meet the
performance criteria for night time reflectivity, wet
reflectivity and skid resistance as mentioned in the section-
15 of IRC 35-2015. Warranty for the Retro reflectivity
should be two years. ( 26161)
9 Supplying & Fixing CATS EYE (Stimsonite) made out from 1.00 Nos 375.72 Rupees Three
Acrylo butyle styrene high compression injection moulding Hundred
with reflector made of MMC(Prismatic type of size 12 cm x Seventy Five and
6 cm x 2.5cm) providing with bituminious adhesive 100gm Paise Seventy
with each unit for fixing. (High Intensity grade).(26163) Two Only
10 Providing hard side shoulder of 100 mm thick for 1.00 Cum 1104.94 Rupees One
embankment using quarry spall with all lead and lift and Thousand One
including watering and rolling and consolidation of sub Hundred Four
grade in layers at OMC to required dry density including and Paise Ninety
filling depression which occur during the process using Four Only
vibratory roller of 80 KN to 100 KN (selected quarry spall
having CBR value not less than
11 Providing and laying, spreading and compacting 150 mm 1.00 Cum 1974.55 Rupees One
thick graded stone aggregate to Wet Mix Macadam Thousand Nine
(W.M.M.) specification including premixing the material Hundred
with water at OMC in mechanical mix plant carriage of Seventy Four
mixed material by tipper to site, laying in uniform layers and Paise Fifty
with manual means Labour Finisher in sub-base /base Five Only
course on well prepared surface and compacting with
vibratory roller to achieve the desired density. (RA)
12 Provdining and laying W.B.M of B.T.M.C metal of size 45 1.00 Cum 2384.61 Rupees Two
mm to 90 mm size including 0.27 Cu.m. stone screening & Thousand Three
0.08 Cu.M. stone dust as filler including spreading, watering Hundred Eighty
& consolidation by vibratory roller 80KN to 100KN static Four and Paise
weight.100 mm thick compected. {As per R.A.} Sixty One Only
13 Provdining and laying W.B.M of B.T.M.C metal of size 45 1.00 Cum 2256.34 Rupees Two
mm to 63 mm size including 0.12 Cu.M. Stone Screeing & Thousand Two
0.08 Cu.M. stone dust as filler including spreading, watering Hundred Fifty
& consolidation by vibratory roller 80KN to 100KN static Six and Paise
weight. 75 mm thick compected each of two layer. {As per Thirty Four Only
14 Providing and laying rubble for appron (each stone 1.00 Cum 1000.78 Rupees One
weighting not less than 40Kg.) including and packing and Thousand and
filing in the interestices with quarry-spalls. (27015A) Paise Seventy
15 Village name Sign :-Providing and fixing sign boards made 1.00 Nos 6397.43 Rupees Six
out of 2mm aluminium sheet / 4mm ACP (Aluminum Thousand Three
composite Panel); size 90x60 cms. rectangular as per design Hundred Ninety
of IRC-67-2012. Pre treated with phospheting process & Seven and Paise
16 Distance Informatory / Destination Sign :-Providing and 1.00 Nos 18254.19 Rupees Eighteen
fixing sign boards made out of 2mm aluminium sheet / Thousand Two
4mm ACP (Aluminum composite Panel); size 180x120 cms. Hundred Fifty
rectangular as per design of IRC-67-2012. Pre treated with Four and Paise
17 Chevron Sign :Providing and fixing sign boards made out of 1.00 Nos 3711.75 Rupees Three
1.5mm aluminium sheet / 3mm ACP (Aluminum composite Thousand Seven
Panel); size 60x50cm rectangular as per design of IRC-67- Hundred Eleven
2012. Pre treated with phospheting process & acid etching; and Paise
18 Hazard Marker Sign :-Providing and fixing sign boards made 1.00 Nos 3518.69 Rupees Three
out of 2.0 mm aluminium sheet / 4 mm ACP (Aluminum Thousand Five
composite Panel); size 90x30 cms. rectangular as per design Hundred
of IRC-67-2012. Pre treated with phospheting process & Eighteen and
19 Regulatory/Mandatory signs :-Providing and fixing sing 1.00 Nos 3540.12 Rupees Three
boards made out of 4mm ACP (Aluminium Composite Thousand Five
Panel); size 60 cms dia Circle as per design of IRC-67-2012. Hundred Forty
Pre treated with phospheting process & acid etching; and Paise
20 Charges for clearing Road site by removing by ganda baval 0.00 0 0.00 Rupees Zero
akadas, bordies etc. upto 3 mt On either sides from edge of and Paise Zero
B.T. surface including serooting by JCB machine &throwing Only
away all stuff branches etc. with all lead and lift with all
20 dense forest BY MECHANICAL MEANS 1.00 Hact 34889.38 Rupees Thirty
Eighty Nine and
20 Thorny Jungle MECHANICAL MEANS 1.00 Hact 28455.10 Rupees Twenty
21 Supplying and fixing reinforced concrete heavy duty non- 0.00 0 0.00 Rupees Zero
pressure pipes with collars for culverts carrying heavy traffic and Paise Zero
as per IS 458-1991 specifications including setting the pipes Only
in C.M. 1:2 watering and laying (to level or slopes) of class
21 (i) 300mm dia. (upto 10 ton) 1.00 Rmt 660.00 Rupees Six
21 (ii) 450mm dia. (upto 10 ton) 1.00 Rmt 1190.06 Rupees One
21 (iii) 600mm dia. (upto 10 ton) 1.00 Rmt 1968.38 Rupees One
Eight and Paise
Thirty Eight Only
21 (iv) 750mm dia. (upto 10 ton) 1.00 Rmt 2605.57 Rupees Two
and Paise Fifty
22 (v) 900mm dia. (upto 10 ton) 1.00 Rmt 3469.26 Rupees Three
Twenty Six Only
22 (vii) 1200mm dia. (upto 10 ton) 1.00 Rmt 5560.01 Rupees Five
22 Hire Charges for Dumper including Diesel, Driver andOil for 1.00 DAY 2129.08 Rupees Two
One Day…..ect, Completed (8 Hrs.) Thousand One
23 Flood gauge sign Providing and fixing sign board made out 1.00 nos 3535.00 Rupees Three
of 4mm aluminium composite sheet size 200 x 43 cms Thousand Five
rectangle as per design IRC -76-2012- 3.1 mtr long stand Hundred Thirty
posted frame fabricated from suitable size iron angle Five and Paise
24 Providing and erecting a "Thrie" W - metal beam crash 1.00 Rmt 5124.74 Rupees Five
barrier comprising of 3 mm thick corrugated sheet metal Thousand One
beam rail, 85 cm above road/ground level, fixed on ISMC Hundred Twenty
series channel vertical post, 150 x 75 x 5 mm spaced 2 m Four and Paise
centre to centre, 2 m high with 1.15 m below ground level. Seventy Four
25 Providing and fixing Pre-cast Rubber Dye/Steel dye inter 1.00 Sq.Mt 700.74 Rupees Seven
locking concrete block 60mm thick with grade of concrete Hundred and
M250 pneumatic compressed/Vibrated by mechanically Paise Seventy
pressed and as per approved design confirming to IS Four Only
15658:2006 including 35 mm Sand layer for levelling and
26 Providing and fixing post and pipe railing as per detailed 1.00 Rmt 1210.98 Rupees One
drawing including 3 coats of painting to steel works Thousand Two
complete Hundred Ten
and Paise Ninety
I/We am/are willing to carry out the work at…% above/below percent(Should be wri en in figures and words) of the es mated
rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Rs............... Estimated amount put to tender Rs...............
Signature of Contractor
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R & B Division
Notes 1 - The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for
which no extra payment shall be made.
Notes 2 - The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
Notes 3 - GST and Income tax TDS will be deducted at a source while making payments of bills.
Note 4 - In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017 Cement
Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the
cost of difference of cement consumption have been deducted from the rate of original item at the rate of input rate mentioned in all the
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD New.pdf
3.1 ROAD WORKS SPECIFICATIONS.pdf
3.1 SPECIFICATION.pdf
5.0 SCHEDULE B.pdf
9.0.GR to be attached with DTP_SBD_with Index.pdf
Download all tender documents and submit your bid