| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC KERALA KL | L1 | Accepted-AOC Lowest | |
| 2 | L2₹3.4 L+₹11,623.50 (3.55%)Rejected-AOC KERALA | KANNUR | KERALA | 670001 | L2 | Rejected-AOC Second Lowest |
| Sl No | Description | Qty | Unit | N VENUGOPAL L2 | KURUVILA K M L1 |
|---|---|---|---|---|---|
| 1.00building | |||||
| 1.00 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | 1 | set | 15,799 ₹15,799 | 15,798 ₹15,798 Lowest |
| 1.00 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | 5 | Bore Holes | 3,100 ₹15,500 | 3,000 ₹15,000 Lowest |
| 1.00 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 965 ₹48,250 | 923 ₹46,150 Lowest |
| 1.00 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 1,029 ₹51,450 | 1,025 ₹51,250 Lowest |
| 1.00 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 50 | metre | 1,059 ₹52,950 | 1,050 ₹52,500 Lowest |
| 1.01 | 56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | 75 | metre | 1,198 ₹89,850 | 1,100 ₹82,500 Lowest |
| 1.01 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | 200 | each | 68 ₹13,600 | 63 ₹12,600 Lowest |
| 1.01 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. | 1 | set | 10,008 ₹10,008 | 10,000 ₹10,000 Lowest |
| 1.01 | 56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers. | 1 | set | 33,999 ₹33,999 | 33,989 ₹33,989 Lowest |
Tender Value
₹3.3 L
EMD Value
₹8,177
Closing Date
30 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
PWD Buildings Subdivision Thiruvalla
GENERAL Kannassa Smaraka Govt HSS school Kadapra, Pathanamthitta General Education Annual Plan 2025 26 Construction of school building for UP High School wing of the Kannassa Smaraka Government Higher Secondary School Kadapra Pathanamthitta Soil I
2026_PWD_857286_1
PWD/BLDG/TR/5747/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
90 days
Thiruvalla
Please refer Tender documents.
10 documents required · 10 mandatory
₹725
Yes
₹8,177
Yes
1 Aug 2026
23 Jun 2026
2 Jul 2026
23 Jun 2026
30 Jun 2026
23 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1building | |||||
| 1.001 | 56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring | - | set | - | - |
| 1.002 | 56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring. | - | Bore Holes | - | - |
| 1.003 | 56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.004 | 56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.005 | 56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.006 | 56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil. | - | metre | - | - |
| 1.007 | 56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code. | - | each | - | - |
| 1.008 | 56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes. | - | set | - | - |
| 1.009 | 56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers. | - | set | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1449148.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
PRELIM.pdf
Tender Documents • 1.08 MB
AFFIDAVIT.pdf
Tender Documents • 0.17 MB
nitsbd.pdf
Tender Documents • 1.67 MB
EPAY.pdf
Tender Documents • 0.06 MB
FORM_OF_TENDER.pdf
Tender Documents • 0.28 MB
INTEGRITY_PACT.pdf
Tender Documents • 0.17 MB
BOQ_1449148.xls
BOQ • 0.30 MB
DATE_CORRIGENDUM.pdf
PDF • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .